Jonesboro City Water & Light Plant
1400 Hanley Drive, Jonesboro, AR 72403Plant Summary Information
Jonesboro City Water & Light Plant is ranked #50 out of 115 power plants in Arkansas in terms of total annual net electricity generation.
Jonesboro City Water & Light Plant is comprised of 5 generators and generated 13.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Jonesboro City Water & Light Plant |
|---|---|
| Utility Name | City Water and Light Plant - (AR) |
| Location | Craighead County, AR |
| Initial Operation Date | July 1999 |
| Last Update | Dec 2025 |
| Annual Generation | 56.6 GWh |
| Annual Consumption | 612.6 k MMBtu |
| Ranked #4,047 out of 13,081 Power Plants Nationwide | |
| Ranked #1,056 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #50 out of 115 Arkansas Power Plants | |
| Ranked #11 out of 19 Arkansas Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.9% |
| Previous Operator |
City Water and Light Plant (2013 to 2024) City Water and Light Plant - (AR) (2025 to 2025) |
Map of Jonesboro City Water & Light Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jonesboro City Water & Light Plant.
Monthly Net Generation for Jonesboro City Water & Light Plant
Monthly Plant Fuel Consumption for Jonesboro City Water & Light Plant
Jonesboro City Water & Light Plant Details
| Summary Information | |
|---|---|
| Plant Name | Jonesboro City Water & Light Plant (56505) |
| Plant Address | 1400 Hanley Drive, Jonesboro, AR 72403 |
| Utility | City Water and Light Plant - (AR) (9879) |
| Latitude, Longitude | 35.84856, -90.72538 |
| Generation Dates on File | Jan 2006 to Dec 2025 |
| Initial Operation Date | July 1999 |
| Annual Generation | 56.6 GWh |
| Fuel Types | Natural Gas : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City Water and Light Plant (9879) AR |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name |
Other - Please explain in pipeline notes below. Other - Please explain in pipeline notes below. Other - Please explain in pipeline notes below. |
| Pipeline Notes | No connections to LDC |
| Natural Gas Storage | No |
Generator SN01 Details Operating July 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | EAI.CWL_A |
| Nameplate Capacity | 24.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 20 MW |
| Winter Capacity | 23 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 20 MW |
| Net Winter Capacity With Natural Gas | 23 MW |
| Net Summer Capacity With Oil | 20 MW |
| Net Winter Capacity With Oil | 22 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator SN02 Details Operating July 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | EAI.CWL_B |
| Nameplate Capacity | 21.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 19 MW |
| Winter Capacity | 22 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 19 MW |
| Net Winter Capacity With Natural Gas | 22 MW |
| Net Summer Capacity With Oil | 19 MW |
| Net Winter Capacity With Oil | 21.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator SN04 Details Operating May 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | EAI.CWL_C |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 46 MW |
| Winter Capacity | 49 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2000 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 46 MW |
| Net Winter Capacity With Natural Gas | 47.5 MW |
| Net Summer Capacity With Oil | 46 MW |
| Net Winter Capacity With Oil | 46.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator SN06 Details Operating May 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | EAI.CWL_D |
| Nameplate Capacity | 57.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 46 MW |
| Winter Capacity | 49 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2003 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 46 MW |
| Net Winter Capacity With Natural Gas | 48.5 MW |
| Net Summer Capacity With Oil | 46 MW |
| Net Winter Capacity With Oil | 47.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator SN07 Details Operating May 2007
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | EAI.CWL_E |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 46 MW |
| Winter Capacity | 49 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2007 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Jonesboro City Water & Light Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1046 | DTE Atlantic, LLC | Atlantic City, NJ | 58.3 GWh |
| #1047 | Archbald Power Station | Archbald, PA | 60.1 GWh |
| #1048 | Suwannee River | Live Oak, FL | 58.5 GWh |
| #1049 | Winchester Power Park | Winchester, TX | 58.1 GWh |
| #1050 | Kalkaska CT #1 | Kalkaska, MI | 57.6 GWh |
| #1051 | Indiana Harbor E 5 AC Station | East Chicago, IN | 648.8 GWh |
| #1052 | Interstate | Springfield, IL | 57.5 GWh |
| #1053 | Westside Energy Station | Rochester, MN | 56.9 GWh |
| #1054 | Shakopee Energy Park | Shakopee, MN | 56.8 GWh |
| #1055 | John Twitty Energy Center | Springfield, MO | 1.8 TWh |
| #1057 | Aberdeen CT | Aberdeen, SD | 56.2 GWh |
| #1058 | NRG Rockford II Energy Center | Rockford, IL | 56.1 GWh |
| #1059 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 170.9 GWh |
| #1060 | Bristol Myers Squibb New Brunswick | New Brunswick, NJ | 55.9 GWh |
| #1061 | SWM Fuel Cell | Yaphank, NY | 55.6 GWh |
| #1062 | Brunswick Cellulose | Brunswick, GA | 245.3 GWh |
| #1063 | Black Mountain Generating Station | Golden Valley, AZ | 55.2 GWh |
| #1064 | Sylvamo Corporation Eastover Facility | Eastover, SC | 546.3 GWh |
| #1065 | Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 155.9 GWh |
| #1066 | Mars Wrigley Confectionery US, LLC | Hackettstown, NJ | 55.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jonesboro City Water & Light Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Cypress Solar, LLC | Crawfordsville, AR | 420.8 GWh | 42 mi |
| Cherry Valley PV I | Cherry Valley, AR | 60.9 GWh | 31.8 mi |
| Clay County Electrical Cooperative | Corning, AR | 2.2 GWh | 39.7 mi |
| Craighead Electric Solar One | Brookland, AR | 2.2 GWh | 10.2 mi |
| Crossover Wind | Wynne, AR | 401.6 GWh | 41.6 mi |
| Dell Power Station | Dell, AR | 3.3 TWh | 39.2 mi |
| Driver Solar | Osceola, AR | 332.7 GWh | 44.8 mi |
| Farmers Electric Cooperative | Newport, AR | 2.3 GWh | 32.1 mi |
| Forgeview Solar | Blytheville, AR | 186.7 GWh | 48.4 mi |
| Independence Steam Electric Station | Newark, AR | 7.3 TWh | 40.1 mi |
| Jonesboro CWL Solar Park | Jonesboro, AR | 20.5 GWh | 8.6 mi |
| Kennett | Kennett, MO | 1.3 GWh | 46.1 mi |
| Newport Solar Project | Newport, AR | 353.8 GWh | 28.7 mi |
| Paragould Reciprocating | Paragould, AR | 441.0 MWh | 17.1 mi |
| Paragould Solar Farm | Paragould, AR | 3.1 GWh | 18.1 mi |
| Paragould Turbine | Paragould, AR | 48.0 MWh | 17.1 mi |
| Plum Point Energy Station | Osceola, AR | 2.7 TWh | 45.4 mi |
| Quartz Solar, LLC | Wynne, AR | 298.6 GWh | 44.4 mi |
| Rivercrest SD | Wilson, AR | 2.2 GWh | 38.3 mi |
| White River Medical Center | Newport, AR | 5.2 GWh | 34.1 mi |