Jackson Generating Station
2219 Chapin St, Jackson, MI 49203Plant Summary Information
Jackson Generating Station is ranked #12 out of 263 power plants in Michigan in terms of total annual net electricity generation.
Jackson Generating Station is comprised of 9 generators and generated 484.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Jackson Generating Station |
|---|---|
| Utility Name | Consumers Energy Co - (MI) |
| Location | Jackson County, MI |
| Initial Operation Date | July 2002 |
| Last Update | Sep 2025 |
| Annual Generation | 1.9 TWh |
| Annual Consumption | 17.7 M MMBtu |
| Ranked #524 out of 12,539 Power Plants Nationwide | |
| Ranked #322 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #12 out of 263 Michigan Power Plants | |
| Ranked #7 out of 73 Michigan Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operators |
AlphaGen Power LLC (2013 to 2014) Consumers Energy Co (2015 to 2022) Consumers Energy Co - (MI) (2023 to 2024) |
Map of Jackson Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jackson Generating Station.
Monthly Net Generation for Jackson Generating Station
Jackson Generating Station Details
| Summary Information | |
|---|---|
| Plant Name | Jackson Generating Station (55270) |
| Plant Address | 2219 Chapin St, Jackson, MI 49203 |
| Utility | Consumers Energy Co - (MI) (4254) |
| Latitude, Longitude | 42.2488, -84.3767 |
| Generation Dates on File | Jul 2002 to Sep 2025 |
| Initial Operation Date | July 2002 |
| Annual Generation | 1.9 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 02-110-000; '02-111 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Transmission (56068) MI |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | VECTOR PIPELINE CO |
| Natural Gas Storage | No |
Generator 7EA Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 79 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 78.1 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator LM1 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 46 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator LM2 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.7 MW |
| Winter Capacity | 48.4 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator LM3 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44 MW |
| Winter Capacity | 47.6 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator LM4 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.1 MW |
| Winter Capacity | 47.7 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator LM5 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 42.6 MW |
| Winter Capacity | 46.1 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator LM6 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.3 MW |
| Winter Capacity | 47.9 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 105 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 100 MW |
| Winter Capacity | 108.3 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating July 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | CONS.CC.PLYM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
| Nameplate Capacity | 105 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 96.7 MW |
| Winter Capacity | 104.9 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Jackson Generating Station Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #312 | PSEG Sewaren Generating Station | Sewaren, NJ | 2.0 TWh |
| #313 | Harrington | Amarillo, TX | 2.3 TWh |
| #314 | Frontera Energy Center | Mission, TX | 2.0 TWh |
| #315 | Hay Road | Wilmington, DE | 2.0 TWh |
| #316 | Desert Basin | Casa Grande, AZ | 2.0 TWh |
| #317 | Dow St Charles Operations | Taft, LA | 2.0 TWh |
| #318 | Lewis Creek | Willis, TX | 1.9 TWh |
| #319 | Seminole (OK) | Konowa, OK | 1.9 TWh |
| #320 | Watson Cogeneration | Carson, CA | 2.3 TWh |
| #321 | Apache Station | Cochise, AZ | 2.4 TWh |
| #323 | Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 1.9 TWh |
| #324 | Houston Chemical Complex Battleground | Houston, TX | 1.9 TWh |
| #325 | AES Alamitos Energy Center | Long Beach, CA | 1.9 TWh |
| #326 | Edwardsport | Edwardsport, IN | 3.6 TWh |
| #327 | Texas City Power Plant | Texas City, TX | 1.9 TWh |
| #328 | Hopewell Cogeneration | Hopewell, VA | 1.9 TWh |
| #329 | H Wilson Sundt Generating Station | Tucson, AZ | 1.8 TWh |
| #330 | Sunrise Power LLC | Fellows, CA | 1.8 TWh |
| #331 | Bowline Point | West Haverstraw, NY | 1.9 TWh |
| #332 | Freeport Energy | Freeport, TX | 1.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jackson Generating Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adrian Energy Associates LLC | Adrian, MI | 8.3 GWh | 31.6 mi |
| Blue Elk II Solar, LLC | Mason, MI | 25.6 GWh | 18.4 mi |
| Blue Elk III Solar, LLC | Eaton Rapids, MI | 36.4 GWh | 21.5 mi |
| Blue Elk IV Solar, LLC | Adrian, MI | 37.6 GWh | 27.6 mi |
| Bullhead Solar, LLC | Fayette, MI | 4.1 GWh | 25.1 mi |
| Calhoun County Solar Project | Sheridan Township, MI | 179.2 GWh | 22.3 mi |
| Cement City Solar, LLC | Cement City, MI | 36.8 GWh | 16.8 mi |
| Crescent Wind Park | Hillsdale, MI | 349.6 GWh | 22.3 mi |
| GRS C&C | Marshall, MI | 21.0 GWh | 33 mi |
| Hendershot Solar, LLC | Tecumseh, MI | 4.0 GWh | 31.1 mi |
| Hillsdale | Hillsdale, MI | 196.0 MWh | 27.1 mi |
| Letts Creek Solar, LLC | Grass Lake, MI | 28.1 GWh | 12.5 mi |
| Marshall (MI) | Marshall, MI | 704.0 MWh | 28.9 mi |
| River Fork Solar, LLC | Albion, MI | 274.2 GWh | 19.5 mi |
| Shipsterns Solar, LLC | Albion, MI | 34.6 GWh | 19.8 mi |
| Spartan PV 1, LLC | East Lansing, MI | 12.0 GWh | 32.7 mi |
| Surbrook Solar, LLC | Rives Junction, MI | 3.3 GWh | 11.2 mi |
| T B Simon Power Plant | East Lansing, MI | 249.5 GWh | 32.9 mi |
| The Andersons Albion Ethanol LLC | Albion, MI | 63.4 GWh | 21.1 mi |
| University of Michigan | Ann Arbor, MI | 208.5 GWh | 32.9 mi |