Jumbo Hill Wind Project
8404 SW 100, Andrews, TX 79714Plant Summary Information
Jumbo Hill Wind Project is ranked #97 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Jumbo Hill Wind Project generated 165.0 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Jumbo Hill Wind Project |
|---|---|
| Utility Name | Engie North America |
| Location | Andrews County, TX |
| Initial Operation Date | March 2020 |
| Last Update | May 2026 |
| Annual Generation | 579.1 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,177 out of 13,081 Power Plants Nationwide | |
| Ranked #294 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #229 out of 852 Texas Power Plants | |
| Ranked #97 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Jumbo Hill Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jumbo Hill Wind Project.
Monthly Net Generation for Jumbo Hill Wind Project
Monthly Plant Fuel Consumption for Jumbo Hill Wind Project
Jumbo Hill Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Jumbo Hill Wind Project (62630) |
| Plant Address | 8404 SW 100, Andrews, TX 79714 |
| Utility | Engie North America (56201) |
| Latitude, Longitude | 32.386, -102.949 |
| Generation Dates on File | Apr 2020 to May 2026 |
| Initial Operation Date | March 2020 |
| Annual Generation | 579.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WTGS1 Details Operating March 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 160.7 MW |
| Summer Capacity | 160.7 MW |
| Winter Capacity | 160.7 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 57 |
| Turbine Details | |
| Number Of Turbines | 57 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 17.7 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 290 |
Jumbo Hill Wind Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Jumbo Hill Wind Project, LLC | 1990 Post Oak BLVD., Suite 1900, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #284 | Pilot Hill Wind Farm | Herscher, IL | 588.6 GWh |
| #285 | TX Hereford Wind | Hereford, TX | 587.2 GWh |
| #286 | Foxtail Wind, LLC | Forbes, ND | 587.0 GWh |
| #287 | Boiling Springs Wind Farm | Woodward, OK | 586.6 GWh |
| #288 | Alta Farms II Wind Project, LLC | Clinton, IL | 584.0 GWh |
| #289 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 583.0 GWh |
| #290 | North Hurlburt Wind LLC | Arlington, OR | 581.3 GWh |
| #291 | Panorama Wind, LLC | Grover, CO | 581.0 GWh |
| #292 | Reloj del Sol Wind Farm | San Ygnacio, TX | 580.4 GWh |
| #293 | Chevelon Butte Wind Farm | Winslow, AZ | 579.2 GWh |
| #295 | Rattlesnake Power, LLC | Brady, TX | 578.9 GWh |
| #296 | FPL Energy Crystal Lake Wind LLC | Britt, IA | 577.9 GWh |
| #297 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 577.3 GWh |
| #298 | Cedar Creek II | New Raymer, CO | 577.0 GWh |
| #299 | Mountain Breeze Wind, LLC | Grover, CO | 575.5 GWh |
| #300 | Las Lomas Wind Project | Falcon, TX | 574.5 GWh |
| #301 | English Farms | Montezuma, IA | 573.2 GWh |
| #302 | Bison 4 Wind Energy Center | New Salem, ND | 572.9 GWh |
| #303 | Balko Wind LLC | Balko, OK | 572.2 GWh |
| #304 | Minco Wind IV, LLC | Hinton, OK | 571.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jumbo Hill Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh | 30.8 mi |
| Bakke | Andrews, TX | 107.0 MWh | 24.7 mi |
| Cunningham | Hobbs, NM | 1.7 TWh | 32.6 mi |
| Cunningham Solar I & BESS | Hobbs, NM | 38.3 GWh | 35.6 mi |
| Ector County Energy Center | Goldsmith, TX | 934.6 GWh | 30.5 mi |
| Frankel | Andrews, TX | 67.0 MWh | 9.7 mi |
| Goldsmith | Goldsmith, TX | 101.0 MWh | 33.8 mi |
| Hobbs Generating Station | Hobbs, NM | 3.3 TWh | 31.6 mi |
| Lapetus | Andrews, TX | 181.3 GWh | 16.9 mi |
| Maddox | Hobbs, NM | 731.3 GWh | 30.6 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 220.4 GWh | 27.9 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 38.8 GWh | 32.3 mi |
| Phoebe Solar | Kermit, TX | 515.5 GWh | 37.8 mi |
| Prospero Solar | Andrews, TX | 694.4 GWh | 9.3 mi |
| Prospero Solar II | Andrews, TX | 654.3 GWh | 9.7 mi |
| SPS1 Dollarhide | Jal, NM | 22.5 GWh | 21 mi |
| SPS2 Jal | Jal, NM | 21.8 GWh | 19.6 mi |
| SPS3 Lea | Eunice, NM | 22.7 GWh | 22.6 mi |
| SPS4 Monument | Monument, NM | 21.9 GWh | 29.1 mi |
| Tumbleweed | Andrews, TX | 132.0 MWh | 23 mi |