Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Ellis Solar LLC | 174 Power Global Corp. | Midlothian, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 163.0 GWh | Sep 2023 | Sep 2025 | Solar |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 22.5 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| EQX012 Harz Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 17.4 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.6 GWh | Aug 2019 | Dec 2024 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Dec 2017 | Dec 2024 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.3 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| EQX003 Secaucus Rd Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 13.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| EQX002 Secaucus Rd Fuel Cell | 2016 ESA Project Company, LLC | Secaucus, NJ | PJM Interconnection, LLC (PJM) | 11.5 GWh | Jun 2019 | Dec 2024 | Natural Gas |
| Eagle Shadow Mountain Solar Farm | 325MK 8me LLC | Moapa, NV | Nevada Power Company (NEVP) | 905.2 GWh | Apr 2023 | Sep 2025 | Solar |
| Eland Solar & Storage Center, Phase 1 Hy | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 609.1 GWh | Oct 2024 | Sep 2025 | Solar |
| Eland Solar & Storage Center, Phase 2 Hy | 69SV 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 121.2 GWh | - | Sep 2025 | Solar |
| EcoGrove Wind LLC | Acciona Wind Energy USA LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 258.0 GWh | Jun 2009 | Dec 2024 | Wind |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 153.1 GWh | Nov 2023 | Sep 2025 | Solar |
| East Line Solar | AES Distributed Energy | Coolidge, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 252.9 GWh | Nov 2020 | Sep 2025 | Solar |
| East Brookfield Main Street Solar LLC CS | AES Distributed Energy | East Brookfield, MA | ISO New England (ISNE) | 1.6 GWh | Nov 2020 | Nov 2024 | Solar |
| Ellerbe | AES Distributed Energy | Ellerbe, NC | Duke Energy Carolinas (DUK) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Eden Solar LLC | AES Distributed Energy | Ellerbe, NC | Duke Energy Carolinas (DUK) | 81.8 GWh | Nov 2015 | Dec 2024 | Solar |
| Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 103.2 GWh | Nov 2016 | Sep 2025 | Solar |
| Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.5 GWh | Apr 2014 | Dec 2024 | Solar |
| Elizabethtown Solar | AES Distributed Energy | Elizabethtown, PA | PJM Interconnection, LLC (PJM) | 2.5 GWh | Jan 2016 | Dec 2024 | Solar |
| Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2024 | Solar |
| Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2024 | Solar |
| Eagle Valley (IN) | AES Indiana | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 TWh | Nov 1951 | Sep 2025 | Natural Gas |
| E C Gaston | Alabama Power Co | Wilsonville, AL | Southern Company Services, Inc. - Trans (SOCO) | 3.0 TWh | Apr 1960 | Sep 2025 | Bituminous Coal : 54.2% Natural Gas : 45.8% |
| Elim | Alaska Village Elec Coop, Inc | Elim, AK | 1.3 GWh | May 2003 | Dec 2024 | Distillate Fuel Oil | |
| Emmonak | Alaska Village Elec Coop, Inc | Emmonak, AK | 5.7 GWh | Mar 1995 | Dec 2024 | Distillate Fuel Oil | |
| ELP Myer CSG | Altus Power America Management, LLC | Ulster, NY | New York Independent System Operator (NYIS) | 3.5 GWh | May 2021 | Dec 2024 | Solar |
| East Fishkill CSG | Altus Power America Management, LLC | East Fishkill, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2019 | Dec 2024 | Solar |
| East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Feb 2013 | Dec 2024 | Solar |
| ELP Saugerties CSG | Altus Power America Management, LLC | Saugerties, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jan 2020 | Dec 2024 | Solar |
| ELP Kinderhook CSG | Altus Power America Management, LLC | Valatie, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2020 | Dec 2024 | Solar |
| East Bridgewater Solar | Altus Power America Management, LLC | East Bridgewater, MA | ISO New England (ISNE) | 3.4 GWh | Oct 2017 | Dec 2024 | Solar |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2014 | Dec 2024 | Solar |
| Ellis Solar | Altus Power America Management, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 20.5 GWh | Nov 2019 | Dec 2024 | Solar |
| ELP Greenport CSG | Altus Power America Management, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.7 GWh | May 2020 | Dec 2024 | Solar |
| Edgerton | American Mun Power-Ohio, Inc | Edgerton, OH | PJM Interconnection, LLC (PJM) | 212.0 MWh | Jul 2000 | Dec 2024 | Distillate Fuel Oil |
| Ephrata PA BTM | American Mun Power-Ohio, Inc | Lancaster, PA | PJM Interconnection, LLC (PJM) | 309.0 MWh | Oct 2021 | Dec 2024 | Distillate Fuel Oil |
| Enter Solar | Arcadia Solar, LLC | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Dec 2018 | Dec 2024 | Solar |
| Essex Solar Center | Arevon Energy, Inc. | Dunnsville, VA | PJM Interconnection, LLC (PJM) | 39.0 GWh | Nov 2017 | Sep 2025 | Solar |
| Elkins Generating Center | Arkansas Electric Coop Corp | Elkins, AR | Southwest Power Pool (SWPP) | 20.7 GWh | Apr 2010 | Dec 2024 | Natural Gas |
| Ellis Hydro | Arkansas Electric Coop Corp | Van Buren, AR | Southwest Power Pool (SWPP) | 128.8 GWh | Nov 1988 | Dec 2024 | Water |
| Essex | Associated Electric Coop, Inc | Essex, MO | Associated Electric Cooperative, Inc. (AECI) | 62.6 GWh | May 1999 | Dec 2024 | Natural Gas |
| Elm Creek Wind LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 176.1 GWh | Nov 2008 | Dec 2024 | Wind |
| Elm Creek Wind II LLC | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 205.4 GWh | Nov 2010 | Dec 2024 | Wind |
| Elk River Wind | Avangrid Power LLC | Beaumont, KS | Southwest Power Pool (SWPP) | 294.8 GWh | Nov 2005 | Dec 2024 | Wind |
| El Cabo Wind | Avangrid Power LLC | Encino, NM | Public Service Company of New Mexico (PNM) | 1.1 TWh | Nov 2017 | Sep 2025 | Wind |
| Escanaba Mill | Billerud Escanaba LLC | Escanaba, MI | Midcontinent Independent System Operator, Inc. (MISO) | 475.4 GWh | Dec 1968 | Sep 2025 | Black Liquor : 44.9% Natural Gas : 31.2% Wood/Wood Waste Solids : 23.2% Residual Fuel Oil : 0.7% |
| Envoy Solar, LLC | Birch Creek Power, LLC | Mexico, MO | Midcontinent Independent System Operator, Inc. (MISO) | 78.2 GWh | - | Sep 2025 | Solar |
| Earp Solar, LLC | Birch Creek Power, LLC | Monmouth, IL | Midcontinent Independent System Operator, Inc. (MISO) | 75.0 GWh | Mar 2024 | Sep 2025 | Solar |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Equinix - Billerica | Bloom Energy | Billerica, MA | ISO New England (ISNE) | 15.0 GWh | Aug 2021 | Dec 2024 | Natural Gas |
| Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2019 | Mar 2024 | Natural Gas |
| Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.6 GWh | Apr 2019 | Jun 2024 | Natural Gas |
| Equinix - Elmsford | Bloom Energy | Elmsford, NY | New York Independent System Operator (NYIS) | 13.0 GWh | Aug 2020 | Dec 2024 | Natural Gas |
| Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 13.3 GWh | May 2021 | Dec 2024 | Natural Gas |
| Ellsworth Hydro Station | Brookfield Black Bear Hydro, LLC | Ellsworth, ME | ISO New England (ISNE) | 21.9 GWh | Jun 1924 | Dec 2024 | Water |
| Elroy Solar | Butter Solar, LLC | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Aug 2019 | Dec 2024 | Solar |
| Elmore Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 104.3 GWh | Oct 1988 | Dec 2024 | Geothermal |
| Edward C Hyatt | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 1.9 TWh | Feb 1968 | Sep 2025 | Water |
| Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 29.2 GWh | Oct 1994 | Sep 2025 | Natural Gas |
| East Portal Generator | Calleguas Mun Water District | Chatsworth, CA | California Independent System Operator (CISO) | 3.9 GWh | Dec 1986 | Dec 2024 | Water |
| Edge Moor | Calpine Mid-Atlantic Generation LLC | Wilmington, DE | PJM Interconnection, LLC (PJM) | 327.6 GWh | Nov 1954 | Dec 2024 | Natural Gas : 94.9% Residual Fuel Oil : 5.1% |
| Energy Center Dover | Cartier Energy, LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 114.3 GWh | Apr 1985 | Sep 2025 | Natural Gas : 99.6% |
| Euclid Farm, Stamco N-54 | Case Western Reserve University | Euclid, OH | PJM Interconnection, LLC (PJM) | 710.0 MWh | Sep 2012 | Dec 2024 | Wind |
| Eastern Iowa Solar | Central Iowa Power Cooperative | Wilton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Oct 2016 | Dec 2024 | Solar |
| Eastman Falls | Central Rivers Power NH, LLC | Franklin, NH | ISO New England (ISNE) | 24.3 GWh | Jul 1937 | Dec 2024 | Water |
| El Segundo Cogen | Chevron USA Inc-El Segundo | El Segundo, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1987 | Aug 2025 | Natural Gas : 99.6% |
| Eklutna Hydro Project | Chugach Electric Assn Inc | Palmer, AK | 120.4 GWh | Dec 1954 | Dec 2024 | Water | |
| Ennis Solar, LLC | CI-II Mitchell Holding LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Oct 2019 | Dec 2024 | Solar |
| EBZ Solar | Citizens Enterprises Corporation | Shirley, MA | ISO New England (ISNE) | 3.7 GWh | Dec 2012 | Dec 2024 | Solar |
| Echo Dam | City of Bountiful | Echo, UT | PacifiCorp East (PACE) | 13.3 GWh | Feb 1987 | Oct 2024 | Water |
| Earlville | City of Earlville - (IA) | Earlville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | Jun 2001 | Dec 2024 | Distillate Fuel Oil |
| Elk River City of | City of Elk River | Elk River, MN | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 MWh | Feb 1948 | Dec 2023 | Distillate Fuel Oil |
| Ellinwood | City of Ellinwood - (KS) | Ellinwood, KS | Southwest Power Pool (SWPP) | 118.0 MWh | May 1948 | Dec 2024 | Natural Gas : 77.6% Distillate Fuel Oil : 22.4% |
| Elroy | City of Elroy - (WI) | Elroy, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Apr 1973 | Dec 2024 | Distillate Fuel Oil |
| Emerson | City of Emerson - (NE) | Emerson, NE | Southwest Power Pool (SWPP) | 3.0 MWh | Dec 1946 | Dec 2024 | Natural Gas : 64.4% Distillate Fuel Oil : 35.6% |
| Erie Energy Center | City of Erie - (KS) | Erie, KS | Southwest Power Pool (SWPP) | 1.4 GWh | Jun 1999 | Dec 2024 | Distillate Fuel Oil |
| Erie | City of Erie - (KS) | Erie, KS | Southwest Power Pool (SWPP) | 24.5 MWh | Oct 1958 | Dec 2024 | Distillate Fuel Oil |
| Estherville | City of Estherville - (IA) | Estherville, IA | Southwest Power Pool (SWPP) | 199.0 MWh | Nov 1946 | Dec 2024 | Distillate Fuel Oil |
| Elm Street Substation Generators | City of Farmington - (MO) | Farmington, MO | Midcontinent Independent System Operator, Inc. (MISO) | 22.0 MWh | Sep 2002 | Dec 2024 | Distillate Fuel Oil |
| Eastside WWTP | City Of High Point | High Point, NC | Duke Energy Carolinas (DUK) | 276.0 MWh | Jul 2004 | Dec 2024 | Distillate Fuel Oil |
| East 12th Street | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 6.7 GWh | May 1970 | Dec 2024 | Natural Gas : 99.9% |
| Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
| Easton Landfill | CleanCapital Holdings | Easton, MA | ISO New England (ISNE) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2024 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2024 | Solar |
| Easthampton Landfill-City of Easthampton | CleanCapital Holdings | Easthampton, MA | ISO New England (ISNE) | 2.9 GWh | May 2012 | Dec 2024 | Solar |
| EDF Lancaster | CleanCapital Holdings | Lancaster, MA | ISO New England (ISNE) | 5.7 GWh | Jun 2014 | Dec 2024 | Solar |
| Escalante Solar II, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 211.7 GWh | Jul 2016 | Sep 2025 | Solar |
| Escalante Solar III, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 210.0 GWh | Jul 2016 | Sep 2025 | Solar |
| Enterprise Solar, LLC | Clearway Renewable Operation & Maintenance LLC | Newcastle, UT | PacifiCorp East (PACE) | 220.1 GWh | Jun 2016 | Sep 2025 | Solar |
| Escalante Solar I, LLC | Clearway Renewable Operation & Maintenance LLC | Milford, UT | PacifiCorp East (PACE) | 211.1 GWh | Jul 2016 | Sep 2025 | Solar |
| Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 85.1 GWh | Apr 1981 | Sep 2025 | Blast Furnace Gas |
| Edison Sault | Cloverland Electric Co-op | Sault Ste. Marie, MI | Midcontinent Independent System Operator, Inc. (MISO) | 199.0 GWh | Jun 1901 | Dec 2024 | Water |
| Eltopia Branch Canal 4.6 | Columbia Basin Hydropower | Pasco, WA | Bonneville Power Administration (BPAT) | 8.0 GWh | Apr 1983 | Oct 2024 | Water |
| East River | Consolidated Edison Co-NY Inc | New York, NY | New York Independent System Operator (NYIS) | 2.7 TWh | Oct 1951 | Sep 2025 | Natural Gas |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |