SR McNeal
4311 West Bagby Rd., McNeal, AZ 85617Plant Summary Information
SR McNeal is ranked #45 out of 113 solar farms in Arizona in terms of total annual net electricity generation.
SR McNeal generated 11.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | SR McNeal |
|---|---|
| Utility Name | SR McNeal, LLC |
| Location | Cochise County, AZ |
| Initial Operation Date | December 2023 |
| Last Update | Mar 2026 |
| Annual Generation | 53.5 GWh |
| Annual Consumption | 207.7 k MMBtu |
| Ranked #4,061 out of 12,332 Power Plants Nationwide | |
| Ranked #1,017 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #86 out of 166 Arizona Power Plants | |
| Ranked #45 out of 113 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of SR McNeal
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SR McNeal.
Monthly Net Generation for SR McNeal
Monthly Plant Fuel Consumption for SR McNeal
SR McNeal Details
| Summary Information | |
|---|---|
| Plant Name | SR McNeal (66925) |
| Plant Address | 4311 West Bagby Rd., McNeal, AZ 85617 |
| Utility | SR McNeal, LLC (65303) |
| Latitude, Longitude | 31.5551, -109.7013 |
| Generation Dates on File | Jan 2024 to Mar 2026 |
| Initial Operation Date | December 2023 |
| Annual Generation | 53.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Tucson Electric Power Company (TEPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Sulphur Springs Valley E C Inc (18280) AZ |
| Grid Voltage | 69.00 kV |
| Energy Storage | Yes |
Generator MCBA Details Operating December 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 1H |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 20 |
|---|---|
| Maximum Charge Rate | 20 MW |
| Maximum Discharge Rate | 20 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 20 |
| Storage Enclosure Type | BL |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 66925 |
| Direct Support Gen Id | MCNEA |
| Support T D Asset | Yes |
Generator MCNEA Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 28.9 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
SR McNeal Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1007 | Crossroads Solar (IN) | Van Buren Township, IN | 57.6 GWh |
| #1008 | Mechanicsville Solar | Mechanicsville, VA | 57.4 GWh |
| #1009 | Caprock Solar 1 LLC | San Jon, NM | 57.2 GWh |
| #1010 | Waiawa Solar Power Hybrid | Waipahu, HI | 53.0 GWh |
| #1011 | TA-High Desert LLC | Lancaster, CA | 56.8 GWh |
| #1012 | Kelso 2 Solar | MO | 56.6 GWh |
| #1013 | Caden Energix Hickory LLC | Chesapeake, VA | 56.4 GWh |
| #1014 | Baxley | Baxley, GA | 56.3 GWh |
| #1015 | Webberville Solar Project | Manor, TX | 56.3 GWh |
| #1016 | Mare Branch | TBD, FL | 56.1 GWh |
| #1018 | Marine Corps Logistics Base Solar | Albany, GA | 56.0 GWh |
| #1019 | EE Waianae Solar Project | Waianae, HI | 56.0 GWh |
| #1020 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
| #1021 | Fort Benning Solar Facility | Fort Mitchell, AL | 55.6 GWh |
| #1022 | Apache Solar I | Cochise, AZ | 55.5 GWh |
| #1023 | Muskegon Solar | Muskegon, MI | 55.2 GWh |
| #1024 | Citizens Imperial Solar | Calipatria, CA | 55.2 GWh |
| #1025 | Ho'Ohana Solar 1 | Waipahu, HI | 52.1 GWh |
| #1026 | Caden Energix Endless Caverns, LLC | New Market, VA | 54.9 GWh |
| #1027 | Flatford | Myakka City, FL | 54.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SR McNeal.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon TUS2 | Tucson, AZ | 5.5 GWh | 77.7 mi |
| Apache Solar I | Cochise, AZ | 55.5 GWh | 37.1 mi |
| Apache Station | Cochise, AZ | 2.1 TWh | 36.7 mi |
| Babacomari Solar | Huachuca, AZ | 64.8 GWh | 42.5 mi |
| Cogenra - TEP | Tucson, AZ | 1.9 GWh | 75.4 mi |
| Douglas | Douglas, AZ | 93.0 MWh | 15.8 mi |
| Fort Huachuca Solar PV Project | Sierra Vista, AZ | 40.1 GWh | 38.2 mi |
| Gato Montes Solar, LLC | Tucson, AZ | 7.4 GWh | 75.8 mi |
| Iron Horse Battery Storage Hybrid | Tucson, AZ | 4.7 GWh | 75.6 mi |
| Lightning Dock Geothermal | Animas, NM | 66.9 GWh | 65 mi |
| Prairie Fire | Tucson, AZ | 7.8 GWh | 76.3 mi |
| Red Horse 2 | Willcox, AZ | 145.9 GWh | 55.4 mi |
| Red Horse III | Wilcox, AZ | 52.2 GWh | 45.1 mi |
| Roadrunner Solar and BESS | Cochise, AZ | 133.9 GWh | 39.2 mi |
| Sulphur Springs | Cochise, AZ | 51.5 GWh | 37.3 mi |
| Tech Park Solar | Tucson, AZ | 11.8 GWh | 75.4 mi |
| UASTP I | Tucson, AZ | 1.6 GWh | 75.1 mi |
| Valencia | Nogales, AZ | 4.8 GWh | 73.7 mi |
| Valencia Solar | Tucson, AZ | 24.6 GWh | 79.7 mi |
| Wilmot Energy Center LLC | Tucson, AZ | 272.8 GWh | 77.7 mi |