Glass Sands Wind Facility
4526 Hwy 7 East, Sulphur, OK 73086Plant Summary Information
Glass Sands Wind Facility is ranked #39 out of 68 wind farms in Oklahoma in terms of total annual net electricity generation.
Glass Sands Wind Facility generated 78.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Glass Sands Wind Facility |
|---|---|
| Utility Name | Southern Power Co |
| Location | Murray County, OK |
| Initial Operation Date | November 2021 |
| Last Update | Sep 2025 |
| Annual Generation | 418.4 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,526 out of 12,539 Power Plants Nationwide | |
| Ranked #433 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #59 out of 134 Oklahoma Power Plants | |
| Ranked #39 out of 68 Oklahoma Wind Power Plants | |
| Fuel Types | Wind |
Map of Glass Sands Wind Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Glass Sands Wind Facility.
Monthly Net Generation for Glass Sands Wind Facility
Glass Sands Wind Facility Details
| Summary Information | |
|---|---|
| Plant Name | Glass Sands Wind Facility (64750) |
| Plant Address | 4526 Hwy 7 East, Sulphur, OK 73086 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 34.51417, -96.91591 |
| Generation Dates on File | Nov 2021 to Sep 2025 |
| Initial Operation Date | November 2021 |
| Annual Generation | 418.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oklahoma Gas & Electric Co (14063) OK |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator 1 Details Operating November 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | OKGE.GLAS.GLAS |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OKGE.GLAS.GLAS |
| Nameplate Capacity | 117 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 118.3 MW |
| Winter Capacity | 118.3 MW |
| Minimum Load | 2.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 28 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 28 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V150-4.2 |
| Design Wind Speed | 18.3 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 393.7 |
Glass Sands Wind Facility Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Glass Sands Wind Energy, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #423 | Bishop Hill III | Cambridge, IL | 431.9 GWh |
| #424 | Ranchland Wind Project I | Cisco, TX | 431.4 GWh |
| #425 | NedPower Mount Storm | Mount Storm, WV | 431.4 GWh |
| #426 | Cedar Creek Wind, LLC | Shelley, ID | 431.1 GWh |
| #427 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 430.4 GWh |
| #428 | Glen Ullin Energy Center | Glen Ullin, ND | 426.7 GWh |
| #429 | Sunflower Wind Project | Mandan, ND | 426.4 GWh |
| #430 | Whispering Willow Wind Farm - East | Iowa Falls, IA | 425.2 GWh |
| #431 | Heartland Divide Wind Project, LLC | Melville, IA | 424.1 GWh |
| #432 | Midway Wind, LLC | Taft, TX | 418.5 GWh |
| #434 | Los Vientos Windpower IV | Rio Grande City, TX | 418.3 GWh |
| #435 | Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh |
| #436 | Prairie Rose Wind Farm | Hardwick, MN | 414.4 GWh |
| #437 | Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh |
| #438 | Smoky Hills Wind Project Phase II | Lincoln, KS | 414.3 GWh |
| #439 | Senate Wind LLC | Bryson, TX | 413.7 GWh |
| #440 | Voyager Wind I | Mojave, CA | 413.4 GWh |
| #441 | Morning Light Wind Farm | Adair, IA | 413.3 GWh |
| #442 | Los Vientos Wind 1A | Sebastian, TX | 408.3 GWh |
| #443 | Camp Grove Wind Farm | Wyoming, IL | 406.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Glass Sands Wind Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arbuckle Mountain Wind Farm LLC | Davis, OK | 355.9 GWh | 15.4 mi |
| Butterfield Solar Farm | Durant, OK | 10.6 GWh | 46.6 mi |
| Buzzard Flop | Calvin, OK | 24.9 GWh | 45.6 mi |
| Centrahoma East | Centrahoma, OK | 87.0 GWh | 36.1 mi |
| Centrahoma West | Centrahoma, OK | 93.1 GWh | 35.7 mi |
| Chickasaw Nation Solar Farm | Davis, OK | 10.5 GWh | 11.1 mi |
| Choctaw Nation Solar Farm | Calera, OK | 9.3 GWh | 46.6 mi |
| Denison | Denison, TX | 191.9 GWh | 52 mi |
| Diamond Spring, LLC | Sulphur, OK | 691.7 GWh | 7.9 mi |
| Kiamichi Energy Facility | Kiowa, OK | 5.6 TWh | 57 mi |
| Little Dixie | Centrahoma, OK | 58.3 GWh | 36 mi |
| Marietta | Marietta, OK | 4.8 GWh | 41 mi |
| Norman Solar | Norman, OK | 4.5 GWh | 55.3 mi |
| Origin Wind | Hennepin, OK | 514.3 GWh | 20.7 mi |
| People's | Fitzhugh, OK | 12.8 GWh | 14.3 mi |
| Rockhaven Wind Project, LLC | Hennepin, OK | 471.5 GWh | 22 mi |
| Rush Springs Wind | Marlow, OK | 892.5 GWh | 53.2 mi |
| Seminole (OK) | Konowa, OK | 1.9 TWh | 33.1 mi |
| Stuart (OK) | McAlester, OK | 22.3 GWh | 55.1 mi |
| WAL947 | Sherman, TX | 199.0 MWh | 60.7 mi |