Barrett Solar Project
8897 W. US Highway 69, Point, TX 75472Plant Summary Information
Barrett Solar Project is ranked #169 out of 251 solar farms in Texas in terms of total annual net electricity generation.
Barrett Solar Project generated 76.5 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Barrett Solar Project |
|---|---|
| Utility Name | Barrett Solar Project LLC (RE) |
| Location | Rains County, TX |
| Initial Operation Date | Not Available |
| Last Update | Jun 2026 |
| Annual Generation | 76.5 GWh |
| Annual Consumption | 261.2 k MMBtu |
| Ranked #3,819 out of 13,094 Power Plants Nationwide | |
| Ranked #1,018 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #541 out of 858 Texas Power Plants | |
| Ranked #169 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Barrett Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Barrett Solar Project.
Monthly Net Generation for Barrett Solar Project
Monthly Plant Fuel Consumption for Barrett Solar Project
Barrett Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Barrett Solar Project (69359) |
| Plant Address | 8897 W. US Highway 69, Point, TX 75472 |
| Utility | Barrett Solar Project LLC (RE) (67458) |
| Latitude, Longitude | 32.95159, -95.90306 |
| Generation Dates on File | Apr 2026 to Jun 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 76.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Rayburn Country Elec Coop, Inc (18589) TX |
| Grid Voltage | 138.00 kV / 34.50 kV |
| Energy Storage | No |
Barrett Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1008 | OE_AZ1 | Salome, AZ | 79.3 GWh |
| #1009 | Heirloom Solar | Petersburg, IN | 78.8 GWh |
| #1010 | Seville 2 | Ocotillo Wells, CA | 78.3 GWh |
| #1011 | Innovative Solar 42 | Fayetteville, NC | 78.0 GWh |
| #1012 | Hale Kuawehi Solar Hybrid | Waimea, HI | 77.1 GWh |
| #1013 | OCI Alamo Solar I Hybrid | San Antonio, TX | 77.8 GWh |
| #1014 | Richland Township Solar, LLC | Washburn, IL | 77.4 GWh |
| #1015 | Gila Bend Hybrid | Gila Bend, AZ | 72.1 GWh |
| #1016 | Alamosa Solar | Mosca, CO | 76.6 GWh |
| #1017 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 361.6 GWh |
| #1019 | Earp Solar, LLC | Monmouth, IL | 76.4 GWh |
| #1020 | Swamp Cabbage | LaBelle, FL | 76.1 GWh |
| #1021 | Quinebaug Solar | Canterbury, CT | 75.4 GWh |
| #1022 | Fish Creek Solar Park | Greenville, MI | 75.1 GWh |
| #1023 | Central 40 | Newman, CA | 74.6 GWh |
| #1024 | Ho'Ohana Solar 1 | Waipahu, HI | 57.8 GWh |
| #1025 | Marion County Solar Project | Marion, OH | 72.9 GWh |
| #1026 | Gaia Hybrid | Navarro, TX | 72.3 GWh |
| #1027 | Sun Pond | Tonopah, AZ | 70.0 GWh |
| #1028 | Sonny Solar LLC | Elberton, GA | 72.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Barrett Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ables Springs Solar & Storage | Terrell, TX | 26.2 GWh | 18.7 mi |
| Bright Arrow Solar, LLC | Sulphur Springs, TX | 671.9 GWh | 21.3 mi |
| BT Signal Ranch | Quinlan, TX | 106.8 GWh | 10.9 mi |
| Coniglio Solar | Wolfe City, TX | 205.8 GWh | 33 mi |
| Estonian Solar Project, LLC | Cooper, TX | 455.9 GWh | 37.5 mi |
| Forney Energy Center | Forney, TX | 10.5 TWh | 36.7 mi |
| G.S.E. One LLC | Bonham, TX | 149.8 GWh | 40.4 mi |
| Hopkins Energy LLC | Dike, TX | 565.7 GWh | 31.4 mi |
| Kellam Solar | Ben Wheeler, TX | 111.4 GWh | 34.7 mi |
| Lake Hubbard | Sunnyvale, TX | 1.9 TWh | 38.1 mi |
| Leon Solar | Greenville, TX | 18.5 GWh | 24.3 mi |
| Lily Solar Hybrid | Scurry, TX | 311.1 GWh | 42.1 mi |
| Mockingbird Solar Center | Brookston, TX | 985.8 GWh | 41.1 mi |
| Pine Forest Solar I | Pickton, TX | 312.2 GWh | 31.3 mi |
| Powerlane Plant | Greenville, TX | 48.9 GWh | 19.9 mi |
| Ray Olinger | Navada, TX | 51.1 GWh | 32.8 mi |
| Stampede Solar Hybrid | Saltillo, TX | 531.6 GWh | 38 mi |
| Sterling Solar (TX) | Greenville, TX | 6.0 GWh | 21.5 mi |
| TX Sunnyvale 367 Long Creek Road Solar | Sunnyvale, TX | 132.0 MWh | 40.4 mi |
| WAL3224 | Garland, TX | 310.0 MWh | 41 mi |