Samson Solar Energy
TBD, Cunningham, TX 75435Plant Summary Information
Samson Solar Energy is ranked #93 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Samson Solar Energy generated 79.5 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Samson Solar Energy |
|---|---|
| Utility Name | Invenergy Services LLC |
| Location | Franklin County, TX |
| Initial Operation Date | May 2022 |
| Last Update | May 2026 |
| Annual Generation | 335.7 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,882 out of 13,081 Power Plants Nationwide | |
| Ranked #254 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #387 out of 852 Texas Power Plants | |
| Ranked #93 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Samson Solar Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Samson Solar Energy.
Monthly Net Generation for Samson Solar Energy
Monthly Plant Fuel Consumption for Samson Solar Energy
Samson Solar Energy Details
| Summary Information | |
|---|---|
| Plant Name | Samson Solar Energy (63211) |
| Plant Address | TBD, Cunningham, TX 75435 |
| Utility | Invenergy Services LLC (49893) |
| Latitude, Longitude | 33.25102, -95.19343 |
| Generation Dates on File | May 2022 to May 2026 |
| Initial Operation Date | May 2022 |
| Annual Generation | 335.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating May 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 250 MW |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Tilt Angle | 60 |
| DC Net Capacity | 335 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Samson Solar Energy Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #244 | Blythe Solar II, LLC | Blythe, CA | 329.1 GWh |
| #245 | Montague Solar | Arlington, OR | 341.0 GWh |
| #246 | Daybreak Solar | Maupin, OR | 340.8 GWh |
| #247 | Ganado Solar | Gail, TX | 332.7 GWh |
| #248 | Azalea Springs Solar Park | Lufkin, TX | 339.2 GWh |
| #249 | Flat Fork Solar | Wheatley, AR | 338.9 GWh |
| #250 | Holstein 1 Solar Farm | Wingate, TX | 337.6 GWh |
| #251 | Golden Triangle II | St.Artesia, MS | 331.8 GWh |
| #252 | Quitman Solar | Quitman, GA | 336.6 GWh |
| #253 | Arlington Valley Solar Energy II | Arlington, AZ | 336.0 GWh |
| #255 | Edwards Sanborn E1A | Mojave, CA | 317.5 GWh |
| #256 | Edwards Sanborn E4 | Mojave, CA | 329.8 GWh |
| #257 | Elora Solar | Elora, TN | 333.8 GWh |
| #258 | BigBeau Solar, LLC | Rosamond, CA | 329.6 GWh |
| #259 | Driver Solar | Osceola, AR | 332.7 GWh |
| #260 | Twin Lakes Solar LLC | Monticello, IN | 331.7 GWh |
| #261 | Escape Solar Plant | TBD, NV | 323.5 GWh |
| #262 | Cove Mountain Solar 2 | Beryl, UT | 330.5 GWh |
| #263 | Maverick Solar, LLC | Desert Center, CA | 330.2 GWh |
| #264 | Sebree Solar, LLC | Robards, KY | 328.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Samson Solar Energy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barrett Solar Project | Point, TX | 47.8 GWh | 46 mi |
| Bright Arrow Solar, LLC | Sulphur Springs, TX | 620.2 GWh | 31.1 mi |
| Chisum | Blossom, TX | 17.6 GWh | 28.7 mi |
| Delilah Solar Energy II LLC | Bogota, TX | 486.4 GWh | 16.5 mi |
| Delilah Solar Energy LLC | Bogota, TX | 507.2 GWh | 2.9 mi |
| Eiffel Solar Project | Paris, TX | 564.7 GWh | 30.7 mi |
| Estonian Solar Project, LLC | Cooper, TX | 462.1 GWh | 30.9 mi |
| Hecate Energy Upshur Rural LLC | Ore City, TX | 4.1 GWh | 38.8 mi |
| Hopkins Energy LLC | Dike, TX | 574.1 GWh | 15.7 mi |
| Impact Solar 1 | Deport, TX | 384.9 GWh | 18.1 mi |
| Lamar Power Project | Paris, TX | 7.2 TWh | 34.8 mi |
| Mockingbird Solar Center | Brookston, TX | 970.1 GWh | 16.5 mi |
| Paris Energy Center | Paris, TX | 320.9 GWh | 37.3 mi |
| Pine Forest Solar I | Pickton, TX | 251.1 GWh | 15.5 mi |
| Samson Solar Energy II LLC | Cunningham, TX | 419.9 GWh | 16.9 mi |
| Samson Solar Energy III LLC | Cunningham, TX | 304.9 GWh | 15.4 mi |
| Stampede Solar Hybrid | Saltillo, TX | 539.1 GWh | 8 mi |
| Talco Solar Project | Talco, TX | 7.1 GWh | 7 mi |
| Tyson Nick | Paris, TX | 102.5 GWh | 37 mi |
| Welsh | Pittsburg, TX | 3.5 TWh | 24.5 mi |