Matilda Hamilton Fee Hydroelectric Stati
1624 Kirkland Avenue, Ravenna, KY 40472Plant Summary Information
Matilda Hamilton Fee Hydroelectric Stati is ranked #45 out of 61 power plants in Kentucky in terms of total annual net electricity generation.
Matilda Hamilton Fee Hydroelectric Stati is comprised of 5 generators and generated 1.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Matilda Hamilton Fee Hydroelectric Stati |
|---|---|
| Utility Name | Lock 12 Hydro Partners, LLC |
| Location | Estill County, KY |
| Initial Operation Date | September 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 8.0 GWh |
| Annual Consumption | 30.2 k MMBtu |
| Ranked #6,974 out of 13,081 Power Plants Nationwide | |
| Ranked #966 out of 1,311 Water Power Plants Nationwide | |
| Ranked #45 out of 61 Kentucky Power Plants | |
| Ranked #10 out of 11 Kentucky Water Power Plants | |
| Fuel Types | Water |
Map of Matilda Hamilton Fee Hydroelectric Stati
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Matilda Hamilton Fee Hydroelectric Stati.
Monthly Net Generation for Matilda Hamilton Fee Hydroelectric Stati
Monthly Plant Fuel Consumption for Matilda Hamilton Fee Hydroelectric Stati
Matilda Hamilton Fee Hydroelectric Stati Details
| Summary Information | |
|---|---|
| Plant Name | Matilda Hamilton Fee Hydroelectric Stati (62747) |
| Plant Address | 1624 Kirkland Avenue, Ravenna, KY 40472 |
| Utility | Lock 12 Hydro Partners, LLC (62661) |
| Latitude, Longitude | 37.67748, -83.94855 |
| Generation Dates on File | Sep 2021 to Dec 2025 |
| Initial Operation Date | September 2021 |
| Annual Generation | 8.0 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Kentucky River |
| Ash Impoundment | |
| Transmission / Distribution Owner | Jackson Energy Coop Corp - (KY) (9575) KY |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 1 Details Operating September 2021
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating September 2021
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating September 2021
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating September 2021
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating September 2021
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Time From Cold Shutdown To Full Load | 10M |
Matilda Hamilton Fee Hydroelectric Stati Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #956 | Low Line Rapids | Kimberly, ID | 8.3 GWh |
| #957 | Rainbow Falls Auscble | Town of Auscble, NY | 8.2 GWh |
| #958 | Phoenix Hydro Project | Phoenix, NY | 8.2 GWh |
| #959 | Superior Falls | Ironwood, MI | 8.2 GWh |
| #960 | Four Mile Hydropower Project | Alpena, MI | 8.1 GWh |
| #961 | Lachute Hydro Lower | Ticonderoga, NY | 8.1 GWh |
| #962 | Lachute Hydro Upper | Ticonderoga, NY | 8.1 GWh |
| #963 | Byllesby 2 | Ivanhoe, VA | 8.1 GWh |
| #964 | Upper Beaver | Beaver, UT | 8.1 GWh |
| #965 | Dam No. 4 Hydro Station | Shepherdstown, WV | 8.1 GWh |
| #967 | Gateway | Mountain Green, UT | 8.0 GWh |
| #968 | Lahontan | Fallon, NV | 7.9 GWh |
| #969 | Goodwin Hydroelectric | W. Hartland, CT | 7.8 GWh |
| #970 | Taylor Draw Hydroelectric Facility | Rangely, CO | 7.8 GWh |
| #971 | Dry Creek Project | Howe, ID | 7.8 GWh |
| #972 | Millville Hydro Station | Millville, WV | 7.7 GWh |
| #973 | Gregg Falls | Goffstown, NH | 7.7 GWh |
| #974 | Hillcrest Pump Station | Denver, CO | 7.7 GWh |
| #975 | Eltopia Branch Canal 4.6 | Pasco, WA | 7.7 GWh |
| #976 | Vergennes 9 | Vergennes, VT | 7.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Matilda Hamilton Fee Hydroelectric Stati.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Sandy | Louisa, KY | 1.1 TWh | 80.1 mi |
| Blue Ridge Generating | Irvine, KY | 4.3 GWh | 4.9 mi |
| Bluebird Solar LLC | Cynthiana, KY | 142.3 GWh | 49.1 mi |
| Cooper | Somerset, KY | 619.6 GWh | 58.8 mi |
| Cooperative Solar One | Winchester, KY | 13.1 GWh | 29.4 mi |
| Dix Dam | Harrodsburg, KY | 104.7 GWh | 41.9 mi |
| E W Brown | Harrodsburg, KY | 1.8 TWh | 42.4 mi |
| Green City Recovery, LLC | Georgetown, KY | 1.2 GWh | 56.5 mi |
| Green Valley LFGTE | Ashland, KY | 18.5 GWh | 79.5 mi |
| H L Spurlock | Maysville, KY | 8.8 TWh | 71 mi |
| Haefling | Lexington, KY | 76.0 MWh | 41.7 mi |
| J K Smith | Winchester, KY | 1.0 TWh | 16.5 mi |
| Laurel Dam | London, KY | 88.8 GWh | 52.5 mi |
| Martin County Solar Project, LLC | Pilgrim, KY | 223.1 GWh | 80.8 mi |
| Meldahl Hydroelectric Project | Foster, KY | 470.5 GWh | 77.9 mi |
| Morehead Generating Facility | Morehead, KY | 6.8 GWh | 41.8 mi |
| Mother Ann Lee | Harrodsburg, KY | 6.4 GWh | 43.7 mi |
| Paris (KY) | Paris, KY | 370.4 MWh | 39.7 mi |
| Pendleton County LFGTE | Butler, KY | 24.0 GWh | 77.1 mi |
| SR Turkey Creek, LLC | Lancaster, KY | 107.0 GWh | 34.4 mi |