E W Brown
815 Dix Dam Rd, Harrodsburg, KY 40330Plant Summary Information
E W Brown is ranked #10 out of 59 power plants in Kentucky in terms of total annual net electricity generation.
E W Brown generated 445.4 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | E W Brown |
|---|---|
| Utility Name | Kentucky Utilities Co |
| Location | Mercer County, KY |
| Initial Operation Date | May 1957 |
| Last Update | Sep 2025 |
| Annual Generation | 1.6 TWh |
| Annual Consumption | 19.8 M MMBtu |
| Ranked #590 out of 12,539 Power Plants Nationwide | |
| Ranked #53 out of 120 Bituminous Coal Power Plants Nationwide | |
| Ranked #10 out of 59 Kentucky Power Plants | |
| Ranked #7 out of 8 Kentucky Bituminous Coal Power Plants | |
| Fuel Types | Bituminous Coal : 82.5% Natural Gas : 16.4% Solar : 1.0% |
Map of E W Brown
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for E W Brown.
Monthly Net Generation for E W Brown
E W Brown Details
| Summary Information | |
|---|---|
| Plant Name | E W Brown (1355) |
| Plant Address | 815 Dix Dam Rd, Harrodsburg, KY 40330 |
| Utility | Kentucky Utilities Co (10171) |
| Latitude, Longitude | 37.78831, -84.71257 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | May 1957 |
| Annual Generation | 1.6 TWh |
| Fuel Types | Bituminous Coal : 82.5% Natural Gas : 16.4% Solar : 1.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Herrington Lake |
| Ash Impoundment | Yes Lined Operating |
| Transmission / Distribution Owner | Kentucky Utilities Co (10171) KY |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
| Natural Gas Information | |
| Pipeline Name |
TENNESSEE GAS PIPELINE COMPANY TEXAS EASTERN TRANSMISSION LP |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator 3 Details Operating July 1971
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 464 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 412 MW |
| Winter Capacity | 416 MW |
| Minimum Load | 155 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1971 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
|---|---|
| Energy Source | Bituminous Coal |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 9 Details Operating August 1994
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 126 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 121 MW |
| Winter Capacity | 138 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1994 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 121 MW |
| Net Winter Capacity With Natural Gas | 138 MW |
| Net Summer Capacity With Oil | 121 MW |
| Net Winter Capacity With Oil | 138 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 10 Details Operating December 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 126 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 121 MW |
| Winter Capacity | 138 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 121 MW |
| Net Winter Capacity With Natural Gas | 138 MW |
| Net Summer Capacity With Oil | 121 MW |
| Net Winter Capacity With Oil | 138 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 8 Details Operating February 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 126 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 121 MW |
| Winter Capacity | 128 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 121 MW |
| Net Winter Capacity With Natural Gas | 128 MW |
| Net Summer Capacity With Oil | 121 MW |
| Net Winter Capacity With Oil | 128 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 11 Details Operating May 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 126 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 121 MW |
| Winter Capacity | 128 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1996 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 121 MW |
| Net Winter Capacity With Natural Gas | 128 MW |
| Net Summer Capacity With Oil | 121 MW |
| Net Winter Capacity With Oil | 128 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 6 Details Operating August 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 176.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 146 MW |
| Winter Capacity | 171 MW |
| Minimum Load | 105 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating August 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 176.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 146 MW |
| Winter Capacity | 171 MW |
| Minimum Load | 105 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 123 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 130 MW |
| Winter Capacity | 130 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator SOLAR Details Operating May 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Jointly Owned |
| Nameplate Capacity | 13 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2016 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 16 |
| DC Net Capacity | 14.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
E W Brown Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 5 | 47.00% |
| Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 5 | 53.00% |
| Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 6 | 62.00% |
| Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 6 | 38.00% |
| Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator 7 | 62.00% |
| Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator 7 | 38.00% |
| Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator BESS | 100.00% |
| Kentucky Utilities Co | One Quality Street, Lexington, KY 40507 | Generator SOLAR | 61.00% |
| Louisville Gas & Electric Co | 220 W Main Sreet, Louisville, KY 40202 | Generator SOLAR | 39.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #43 | Hayden | Hayden, CO | 2.4 TWh |
| #44 | Seminole (FL) | Palatka, FL | 10.0 TWh |
| #45 | Williams | Goose Creek, SC | 2.3 TWh |
| #46 | Belews Creek | Belews Creek, NC | 8.0 TWh |
| #47 | E C Gaston | Wilsonville, AL | 3.0 TWh |
| #48 | Brunner Island | York Haven, PA | 4.1 TWh |
| #49 | R M Schahfer | Wheatfield, IN | 1.6 TWh |
| #50 | Virginia City Hybrid Energy Center | St. Paul, VA | 1.6 TWh |
| #51 | F B Culley | Newburgh, IN | 1.4 TWh |
| #52 | Clover | Clover, VA | 1.3 TWh |
| #54 | Elm Road Generating Station | Oak Creek, WI | 7.4 TWh |
| #55 | Mayo | Roxboro, NC | 1.2 TWh |
| #56 | Kingston | Kingston, TN | 3.4 TWh |
| #57 | Sioux | West Alton, MO | 4.1 TWh |
| #58 | North Valmy | Valmy, NV | 1.3 TWh |
| #59 | Barry | Bucks, AL | 12.8 TWh |
| #60 | Dallman | Springfield, IL | 809.1 GWh |
| #61 | AES Warrior Run Cogeneration Facility | Cumberland, MD | 726.4 GWh |
| #62 | Marion | Marion, IL | 761.7 GWh |
| #63 | Archer Daniels Midland Decatur | Decatur, IL | 880.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding E W Brown.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Ridge Generating | Irvine, KY | 2.0 GWh | 39.7 mi |
| Bluebird Solar LLC | Leesburg, KY | 20.2 GWh | 39.6 mi |
| Bluegrass Generating Station | LaGrange, KY | 112.5 GWh | 56.4 mi |
| Cooper | Somerset, KY | 505.8 GWh | 55 mi |
| Cooperative Solar One | Winchester, KY | 12.7 GWh | 29.9 mi |
| Cox Waste to Energy | Campbellsville, KY | 9.7 GWh | 48 mi |
| Crittenden Solar Facility | Dry Ridge, KY | 4.0 GWh | 66.8 mi |
| Dix Dam | Harrodsburg, KY | 54.2 GWh | 0.5 mi |
| Green City Recovery, LLC | Georgetown, KY | 1.2 GWh | 39.5 mi |
| Hardin County LFGTE | Elizabethtown, KY | 10.3 GWh | 55.5 mi |
| J K Smith | Winchester, KY | 872.7 GWh | 34 mi |
| Laurel Dam | London, KY | 53.2 GWh | 62.1 mi |
| Matilda Hamilton Fee Hydroelectric Stati | Ravenna, KY | 8.0 GWh | 42.4 mi |
| Mill Creek (KY) | Louisville, KY | 6.9 TWh | 67.8 mi |
| Mother Ann Lee | Harrodsburg, KY | 6.3 GWh | 2.9 mi |
| Ohio Falls | Shippingport Island, KY | 235.5 GWh | 67.4 mi |
| Paris (KY) | Paris, KY | 743.8 MWh | 38.7 mi |
| Pendleton County LFGTE | Butler, KY | 23.9 GWh | 67.4 mi |
| SR Turkey Creek, LLC | Lancaster, KY | 107.3 GWh | 15.6 mi |
| Trimble County | Bedford, KY | 8.7 TWh | 66.9 mi |