Smoky Hills Wind Project Phase II

223 North Hwy 14, Lincoln, KS 67455

Plant Summary Information

Smoky Hills Wind Project Phase II is ranked #40 out of 173 power plants in Kansas in terms of total annual net electricity generation.

Smoky Hills Wind Project Phase II generated 108.9 GWh during the 3-month period between September 2024 to December 2024.

Plant NameSmoky Hills Wind Project Phase II
Utility NameSmoky Hills Wind Project II LLC
LocationLincoln County, KS
Initial Operation DateNovember 2008
Last Update Dec 2024
Annual Generation 414.3 GWh
Annual Consumption 1.6 M MMBtu
Ranked #1,567 out of 12,332 Power Plants Nationwide
Ranked #447 out of 1,358 Wind Power Plants Nationwide
Ranked #40 out of 173 Kansas Power Plants
Ranked #31 out of 52 Kansas Wind Power Plants
Fuel Types Wind

Map of Smoky Hills Wind Project Phase II

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smoky Hills Wind Project Phase II.

Create Your Account Today

Monthly Net Generation for Smoky Hills Wind Project Phase II

Monthly Plant Fuel Consumption for Smoky Hills Wind Project Phase II

Smoky Hills Wind Project Phase II Details

Summary Information
Plant NameSmoky Hills Wind Project Phase II (56985)
Plant Address223 North Hwy 14, Lincoln, KS 67455
UtilitySmoky Hills Wind Project II LLC (56285)
Latitude, Longitude38.89265, -98.16888
Generation Dates on FileJan 2009 to Dec 2024
Initial Operation DateNovember 2008
Annual Generation 414.3 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthoritySouthwest Power Pool (SWPP)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerMidwest Energy Inc (12524) KS
Grid Voltage 230.00 kV
Energy StorageNo

Generator SMKII Details Operating January 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity148.5 MW
Summer Capacity148.5 MW
Winter Capacity148.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Turbines/Hydrokinetic Buoys99
Turbine Details
Number Of Turbines99
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SE
Design Wind Speed24 MPH
Wind Quality Class1 - High Wind
Turbine Hub Height Feet264

Smoky Hills Wind Project Phase II Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#437Los Vientos Wind 1ASebastian, TX421.9 GWh
#438Beaver Creek Wind FacilityBig Timber, MT420.2 GWh
#439Tatanka Wind Power LLCAshley, ND419.7 GWh
#440Monte Cristo 1Monte Alto, TX419.0 GWh
#441Heartland Divide Wind Project, LLCMelville, IA418.9 GWh
#442Bishop Hill IIICambridge, IL418.1 GWh
#443Sunflower Wind ProjectMandan, ND417.9 GWh
#444Leaning Juniper Wind Power IIArlington, OR416.6 GWh
#445Judith Gap Wind Energy CenterHarlowton, MT416.2 GWh
#446Callahan Divide Wind Energy CenterTusocola, TX414.3 GWh
#448Senate Wind LLCBryson, TX413.7 GWh
#449Morning Light Wind FarmAdair, IA413.3 GWh
#450Post Rock Wind Power Project, LLCEllsworth, KS412.8 GWh
#451Wildhorse Mountain Wind FacilityClayton, OK409.9 GWh
#452Camp Grove Wind FarmWyoming, IL406.4 GWh
#453Skookumchuck Wind FacilityRainier, WA405.7 GWh
#454Anticline WindCasper, WY405.5 GWh
#455Wheatridge East WindLexington, OR403.0 GWh
#456Panther Creek Wind Farm IIBig Spring, TX402.1 GWh
#457Midway Wind, LLCTaft, TX401.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Smoky Hills Wind Project Phase II.

Plant NamePlant LocationAnnual GenerationDistance
BeloitBeloit, KS192.0 MWh39.2 mi
Beloit Solar LLCBeloit, KS4.6 GWh38.7 mi
Cloud County Wind FarmConcordia, KS316.8 GWh46.3 mi
EllinwoodEllinwood, KS118.0 MWh43.4 mi
Great Bend - SunflowerGreat Bend, KS51.9 GWh50.4 mi
HoisingtonHoisington, KS32.0 MWh41.9 mi
Hutchinson Energy CenterHutchinson, KS29.1 GWh57.7 mi
Kansas Ethanol, LLCLyons, KS116.3 GWh41.9 mi
LincolnLincoln, KS22.0 MWh10 mi
LindsborgLindsborg, KS2.4 GWh32.9 mi
McPherson 2McPherson, KS15.2 GWh45 mi
McPherson 3McPherson, KS14.5 GWh46 mi
Minneapolis City ofMinneapolis, KS99.0 MWh29.3 mi
OsborneOsborne, KS15.7 MWh47.1 mi
Post Rock Wind Power Project, LLCEllsworth, KS412.8 GWh7.9 mi
Russell DowntownRussell, KS87.0 MWh37 mi
Russell Energy CenterRussell, KS700.0 MWh36.1 mi
Smoky Hills Wind Project Phase ILincoln, KS250.8 GWh1 mi
Solomon-DS&OSolomon, KS2.4 GWh43 mi
SterlingSterling, KS32.0 MWh46.9 mi