Clearwater Wind III
245 Rock Spring Road East, Miles City, MT 59301Plant Summary Information
Clearwater Wind III is ranked #29 out of 70 power plants in Montana in terms of total annual net electricity generation.
Clearwater Wind III generated 111.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Clearwater Wind III |
---|---|
Utility Name | Clearwater Wind III, LLC |
Location | Rosebud County, MT |
Initial Operation Date | September 2024 |
Last Update | Mar 2025 |
Annual Generation | 236.8 GWh |
Annual Consumption | 808.0 k MMBtu |
Ranked #2,189 out of 12,288 Power Plants Nationwide | |
Ranked #679 out of 1,353 Wind Power Plants Nationwide | |
Ranked #29 out of 70 Montana Power Plants | |
Ranked #11 out of 22 Montana Wind Power Plants | |
Fuel Types | Wind |
Map of Clearwater Wind III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clearwater Wind III.
Monthly Net Generation for Clearwater Wind III
Clearwater Wind III Details
Summary Information | |
---|---|
Plant Name | Clearwater Wind III (66811) |
Plant Address | 245 Rock Spring Road East, Miles City, MT 59301 |
Utility | Clearwater Wind III, LLC (65780) |
Latitude, Longitude | 46.81883, -106.19458 |
Generation Dates on File | Sep 2024 to Mar 2025 |
Initial Operation Date | September 2024 |
Annual Generation | 236.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Avista Corporation (AVA) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator CW3 Details Operating September 2024
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 36 |
Turbine Details | |
Number Of Turbines | 36 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 10.1 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 374 |
Clearwater Wind III Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#669 | Rolling Hills | Glenrock, WY | 244.8 GWh |
#670 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 243.9 GWh |
#671 | Lake Benton I | Lake Benton, MN | 243.8 GWh |
#672 | Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh |
#673 | Los Vientos V Wind Power | Rio Grande City, TX | 242.8 GWh |
#674 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 240.8 GWh |
#675 | Beech Ridge Energy LLC | Rupert, WV | 240.6 GWh |
#676 | Wessington Springs | Wessington Springs, SD | 239.2 GWh |
#677 | Oasis Wind | Mojave, CA | 238.4 GWh |
#678 | Meadow Lake Wind Farm II LLC | Lafayette, IN | 237.4 GWh |
#680 | Point Wind | Tehachapi, CA | 236.6 GWh |
#681 | San Roman Wind I, LLC | Los Fresnos, TX | 235.6 GWh |
#682 | Armenia Mountain Wind Farm | Mainesburg, PA | 235.4 GWh |
#683 | Ironwood Wind | Spearville, KS | 235.4 GWh |
#684 | Cassadaga Wind Farm | Cherry Creek, NY | 234.4 GWh |
#685 | Jericho Rise Wind Farm LLC | Chateaugay, NY | 234.2 GWh |
#686 | Diversion Wind Energy LLC | Seymour, TX | 234.1 GWh |
#687 | Broken Bow Wind II, LLC | Broken Bow, NE | 233.6 GWh |
#688 | High Winds LLC | Birds Landing, CA | 233.3 GWh |
#689 | Pinyon Pine II | Mojave, CA | 233.1 GWh |
Nearby Power Plants
Below are closest 14 power plants surrounding Clearwater Wind III.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Clearwater Wind East | Miles City, MT | 869.8 GWh | 9.3 mi |
Clearwater Wind I | Miles City, MT | 1.3 TWh | 8.7 mi |
Clearwater Wind II | Miles City, MT | 408.7 GWh | 0 mi |
Colstrip | Colstrip, MT | 9.0 TWh | 67.7 mi |
Colstrip Energy LP | Colstrip, MT | 287.5 GWh | 62.3 mi |
Culbertson Generation Station | Culbertson, MT | 251.2 GWh | 127.7 mi |
Fort Peck | Fort Peck, MT | 751.6 GWh | 83.1 mi |
Glendive GT | Glendive, MT | 2.6 GWh | 70.5 mi |
Hardin Generator Project | Hardin, MT | 435.4 GWh | 99.4 mi |
Miles City GT | Miles City, MT | 331.0 MWh | 33.9 mi |
OREG 1 Inc | Culbertson, MT | 150.7 GWh | 127.8 mi |
OREG 2 Inc | Culbertson, MT | 111.5 GWh | 127.8 mi |
South Mills Solar, LLC | Hardin, MT | 5.5 GWh | 101.9 mi |
Yellowtail | Hardin, MT | 798.4 GWh | 134.3 mi |