Grand Meadow (PV)

73635 210th St, Grand Meadow, MN 55936

Plant Summary Information

Grand Meadow (PV) is ranked #529 out of 534 solar farms in Minnesota in terms of total annual net electricity generation.

Grand Meadow (PV) generated 425.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameGrand Meadow (PV)
Utility NameOneEnergy, Inc.
LocationMower County, MN
Initial Operation DateNovember 2025
Last Update Dec 2025
Annual Generation 425.0 MWh
Annual Consumption 1.5 k MMBtu
Ranked #12,301 out of 13,094 Power Plants Nationwide
Ranked #6,878 out of 7,027 Solar Power Plants Nationwide
Ranked #733 out of 781 Minnesota Power Plants
Ranked #529 out of 534 Minnesota Solar Power Plants
Fuel Types Solar

Map of Grand Meadow (PV)

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grand Meadow (PV).

Create Your Account Today

Monthly Net Generation for Grand Meadow (PV)

Monthly Plant Fuel Consumption for Grand Meadow (PV)

Grand Meadow (PV) Details

Summary Information
Plant NameGrand Meadow (PV) (69489)
Plant Address73635 210th St, Grand Meadow, MN 55936
UtilityOneEnergy, Inc. (66783)
Latitude, Longitude43.65942, -92.57697
Generation Dates on FileNov 2025 to Dec 2025
Initial Operation DateNovember 2025
Annual Generation 425.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number25-743-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerFreeborn Mower Electric Cooperative (6782) MN
Grid Voltage 12.47 kV
Energy StorageNo

Generator GRNDM Details Operating November 2025

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2025
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
BifacialYes
Azimuth Angle180
DC Net Capacity3.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Grand Meadow (PV) Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6868Edison 0203 Community Solar - SLNNJ203Edison, NJ469.0 MWh
#6869Lime Bluff 2Hughesville, PA465.0 MWh
#6870CFW Solar X LLC - VaughnSan Fernando, CA465.0 MWh
#6871SR TrentonTrenton, TN455.0 MWh
#6872West Boylston Community Shared SolarWest Boylston, MA447.0 MWh
#6873Airport Commons 7-slbal210Hanover, MD443.0 MWh
#6874Cummins, IncLakewood, NY440.0 MWh
#6875Walgreens Woodland Distribution CenterWoodland, CA432.0 MWh
#6876Valparaiso Solar, LLCValparaiso, IN427.0 MWh
#6877Lake Region Community Hybrid, LLCRothsay, MN8.5 GWh
#6879Chambers 4 - Eastvale DCA2Eastvale, CA424.0 MWh
#6880Open Sky DairyRiverdale, CA418.8 MWh
#6881Pilot Rock Solar 1Pilot Rock, OR410.0 MWh
#6882La Grange Solar Partners, LLCElkhorn, WI405.0 MWh
#6883Prologis Meadowlands 9305 - SLNNJ305Moonachie, NJ389.0 MWh
#6884Zonneveld Oak GroveLaton, CA388.0 MWh
#6885Water Lily Solar LLCMinooka, IL388.0 MWh
#6886Tazewell County IL S1Delavan, IL386.0 MWh
#6887South Belleville Solar, LLCSmithton Township, IL385.0 MWh
#6888Triple S Solar I LLC CSGKansas, IL381.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Grand Meadow (PV).

Plant NamePlant LocationAnnual GenerationDistance
Adams Wind FarmAdams, MN10.2 GWh10.3 mi
Buffalo Center Wind LLCLittle Cedar, IA4.0 GWh21 mi
Crane Creek Wind Energy CenterRiceville, IA284.0 GWh18.8 mi
Douglas (IA)Riceville, IA804.0 MWh20.9 mi
Fillmore County Solar ProjectSpring Valley, MN81.8 GWh13.3 mi
FountainFountain, MN6.2 GWh23.1 mi
Grand MeadowDexter, MN378.7 GWh7.6 mi
Hayfield Solar I LLC CSGHayfield, MN1.8 GWh21.7 mi
Hayfield Solar III LLC CSGHayfield, MN2.0 GWh22.9 mi
Little CedarLittle Cedar, IA65.0 MWh20.7 mi
Louise SolarTaopi, MN91.7 GWh8.6 mi
Mower County Wind Energy CenterGrand Meadow, MN334.0 GWh3.3 mi
Pioneer Prairie Wind FarmMcIntire, IA841.7 GWh12.3 mi
Pleasant Valley (MN)Dexter, MN156.8 GWh11 mi
Pleasant Valley Wind FarmDexter, MN463.6 GWh13.9 mi
Prairie Star Wind FarmGrand Meadow, MN303.3 GWh3.1 mi
Saratoga Wind FarmLime Springs, IA258.4 GWh20.8 mi
Spring ValleySpring Valley, MN227.4 MWh9.6 mi
Turtle Creek Wind Farm LLCSt. Ansgar, IA703.1 GWh20.6 mi
Wapsipinicon Wind ProjectDexter, MN268.1 GWh11.1 mi