Turtle Creek Wind Farm LLC
1901 440th St., St. Ansgar, IA 50461Plant Summary Information
Turtle Creek Wind Farm LLC is ranked #34 out of 283 power plants in Iowa in terms of total annual net electricity generation.
Turtle Creek Wind Farm LLC generated 215.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Turtle Creek Wind Farm LLC |
|---|---|
| Utility Name | Turtle Creek Wind Farm LLC |
| Location | Mitchell County, IA |
| Initial Operation Date | December 2018 |
| Last Update | May 2026 |
| Annual Generation | 702.5 GWh |
| Annual Consumption | 2.6 M MMBtu |
| Ranked #1,008 out of 13,081 Power Plants Nationwide | |
| Ranked #205 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #34 out of 283 Iowa Power Plants | |
| Ranked #23 out of 123 Iowa Wind Power Plants | |
| Fuel Types | Wind |
Map of Turtle Creek Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Turtle Creek Wind Farm LLC.
Monthly Net Generation for Turtle Creek Wind Farm LLC
Monthly Plant Fuel Consumption for Turtle Creek Wind Farm LLC
Turtle Creek Wind Farm LLC Details
| Summary Information | |
|---|---|
| Plant Name | Turtle Creek Wind Farm LLC (61638) |
| Plant Address | 1901 440th St., St. Ansgar, IA 50461 |
| Utility | Turtle Creek Wind Farm LLC (61330) |
| Latitude, Longitude | 43.4296, -92.83951 |
| Generation Dates on File | Dec 2018 to May 2026 |
| Initial Operation Date | December 2018 |
| Annual Generation | 702.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Midwest LLC (56161) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator TC1 Details Operating December 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 199.2 MW |
| Summer Capacity | 199.2 MW |
| Winter Capacity | 199.2 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 50 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 50 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V136-3.45 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 269 |
Turtle Creek Wind Farm LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #195 | Whispering Willow North | Latimer, IA | 719.1 GWh |
| #196 | Spinning Spur Wind III | Adrian, TX | 718.6 GWh |
| #197 | South Plains Wind Phase I | Floydada, TX | 715.3 GWh |
| #198 | Aragonne Wind LLC | Santa Rosa, NM | 714.1 GWh |
| #199 | Bishop Hill Energy LLC | Cambridge, IL | 713.3 GWh |
| #200 | Upstream Wind Energy LLC | Neligh, NE | 709.1 GWh |
| #201 | King Plains Wind Project | Garber, OK | 708.7 GWh |
| #202 | Harvest Ridge Wind Farm | Newman, IL | 706.6 GWh |
| #203 | FPL Energy Crystal Lake Wind II LLC | Britt, IA | 705.8 GWh |
| #204 | Hart Wind | Hart, TX | 704.4 GWh |
| #206 | White Rock East Wind Project | Anadarko, OK | 701.9 GWh |
| #207 | Amadeus Wind Farm | Rotan, TX | 701.2 GWh |
| #208 | Waverly Wind Farm LLC | Waverly, KS | 701.2 GWh |
| #209 | Ida Grove II | Ida Grove, IA | 699.4 GWh |
| #210 | Lockett Windfarm | Vernon, TX | 695.9 GWh |
| #211 | California Ridge Wind Energy LLC | Fithian, IL | 692.0 GWh |
| #212 | Rattlesnake Den | Garden City, TX | 691.8 GWh |
| #213 | East Fork Wind Project, LLC | Colby, KS | 691.6 GWh |
| #214 | Coyote Wind LLC | Snyder, TX | 690.9 GWh |
| #215 | Osborn Wind Energy | Stewartsville, MO | 690.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Turtle Creek Wind Farm LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams Wind Farm | Adams, MN | 10.2 GWh | 10.4 mi |
| Barton Windpower LLC | Kensett, IA | 365.4 GWh | 12.9 mi |
| Buffalo Center Wind LLC | Little Cedar, IA | 4.0 GWh | 5 mi |
| CED Mason City Wind | Mason City, IA | 29.5 GWh | 23.8 mi |
| Crane Creek Wind Energy Center | Riceville, IA | 284.0 GWh | 18.5 mi |
| Douglas (IA) | Riceville, IA | 804.0 MWh | 13.3 mi |
| Freeborn Wind Farm | Glenville, MN | 772.4 GWh | 18.4 mi |
| Grand Meadow | Dexter, MN | 378.7 GWh | 21.1 mi |
| Grand Meadow (PV) | Grand Meadow, MN | 425.0 MWh | 20.6 mi |
| Lime Creek | Mason City, IA | 1.1 GWh | 22.2 mi |
| Little Cedar | Little Cedar, IA | 65.0 MWh | 6.3 mi |
| Louise Solar | Taopi, MN | 90.6 GWh | 12.1 mi |
| Maple City | Osage Township, IA | 3.0 GWh | 10.6 mi |
| Mower County Wind Energy Center | Grand Meadow, MN | 334.0 GWh | 17.5 mi |
| Northern Iowa Windpower II | Kensett, IA | 134.3 GWh | 23.5 mi |
| Osage (IA) | Osage, IA | 5.5 GWh | 10.5 mi |
| Pioneer Prairie Wind Farm | McIntire, IA | 845.3 GWh | 12 mi |
| Prairie Star Wind Farm | Grand Meadow, MN | 303.3 GWh | 20.7 mi |
| Roeder Family Wind Farm LLC | Manly, IA | 4.9 GWh | 24.1 mi |
| Windwalkers LLC | Kensett, IA | 2.5 GWh | 19.4 mi |