Fenton Wind Farm
729 21 St. Street, Chandler, MN 56122Plant Summary Information
Fenton Wind Farm is ranked #33 out of 759 power plants in Minnesota in terms of total annual net electricity generation.
Fenton Wind Farm generated 72.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Fenton Wind Farm |
|---|---|
| Utility Name | EDF Renewable Asset Holdings, Inc. |
| Location | Murray County, MN |
| Initial Operation Date | September 2007 |
| Last Update | Sep 2025 |
| Annual Generation | 340.2 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,803 out of 12,539 Power Plants Nationwide | |
| Ranked #539 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #33 out of 759 Minnesota Power Plants | |
| Ranked #19 out of 125 Minnesota Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2024) |
Map of Fenton Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fenton Wind Farm.
Monthly Net Generation for Fenton Wind Farm
Fenton Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Fenton Wind Farm (56617) |
| Plant Address | 729 21 St. Street, Chandler, MN 56122 |
| Utility | EDF Renewable Asset Holdings, Inc. (57170) |
| Latitude, Longitude | 43.85278, -96.01833 |
| Generation Dates on File | Nov 2007 to Sep 2025 |
| Initial Operation Date | September 2007 |
| Annual Generation | 340.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator 1 Details Operating September 2007
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 205.5 MW |
| Summer Capacity | 205.5 MW |
| Winter Capacity | 205.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2007 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 137 |
| Turbine Details | |
| Number Of Turbines | 137 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Fenton Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #529 | Spring Valley Wind Project | Ely, NV | 348.7 GWh |
| #530 | Redbed Plains Wind Farm | Tuttle, OK | 346.6 GWh |
| #531 | Garden Wind LLC | Zearing, IA | 345.4 GWh |
| #532 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #533 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
| #534 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
| #535 | Drift Sand Wind Project LLC | Rush Springs, OK | 341.7 GWh |
| #536 | Midland Wind | Kewane, IL | 341.2 GWh |
| #537 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 340.8 GWh |
| #538 | Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh |
| #540 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
| #541 | Mesquite Wind Power LLC | Abilene, TX | 339.8 GWh |
| #542 | Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh |
| #543 | Shady Oaks Wind 2 | Compton, IL | 338.1 GWh |
| #544 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh |
| #545 | Papalote Creek I LLC | Taft, TX | 335.8 GWh |
| #546 | Penascal Wind Power LLC | Sarita, TX | 335.6 GWh |
| #547 | Rugby Wind Power Project | Barton, ND | 335.4 GWh |
| #548 | Cloud County Wind Farm | Concordia, KS | 334.8 GWh |
| #549 | Spinning Spur Wind LLC | Vegas, TX | 334.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fenton Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antlia Community Solar | Edgerton, MN | 3.5 GWh | 7 mi |
| Bisson Windfarm LLC | Pipestone, MN | 288.0 MWh | 13.5 mi |
| Eastridge Wind Project | Porter, MN | 18.6 GWh | 7.5 mi |
| Fey Windfarm LLC | Woodstock, MN | 5.1 GWh | 13 mi |
| Hilltop Power | Edgerton, MN | 4.1 GWh | 9.6 mi |
| Johnson Solar CSG | Edgerton, MN | 8.9 GWh | 9.3 mi |
| K-Brink Windfarm LLC | Woodstock, MN | 3.3 GWh | 12.6 mi |
| Kas Brothers Windfarm | Woodstock, MN | 1.8 GWh | 12 mi |
| Leo Community Solar | Hadley, MN | 1.8 GWh | 12 mi |
| Noble Ridge LLC | Wilmont, MN | 61.0 MWh | 10.7 mi |
| Nobles 2 Wind Project | Wilmont, MN | 946.0 GWh | 9.3 mi |
| Northern Wind | Lake Wilson, MN | 369.5 GWh | 11 mi |
| Platt Solar | Hadley, MN | 2.1 GWh | 11.5 mi |
| Ridgewind | Woodstock, MN | 81.4 GWh | 11.7 mi |
| Rock Aetna Power Partners | Woodstock, MN | 82.3 GWh | 11.9 mi |
| Tofteland Windfarm LLC | Pipestone, MN | 288.0 MWh | 13.5 mi |
| Valley View Transmission LLC | Chandler, MN | 8.3 GWh | 3.5 mi |
| Windcurrent Farms LLC | Woodstock, MN | 5.1 GWh | 12.2 mi |
| Windshare LLC | Chandler, MN | 11.4 GWh | 7.7 mi |
| Woodstock Windfarm | Woodstock, MN | 28.5 GWh | 9.7 mi |