Horseshoe Solar, LLC
TBD, Tooele, UT 84029Plant Summary Information
Horseshoe Solar, LLC is ranked #35 out of 121 power plants in Utah in terms of total annual net electricity generation.
Horseshoe Solar, LLC generated 65.9 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Horseshoe Solar, LLC |
|---|---|
| Utility Name | Horseshoe Solar, LLC |
| Location | Tooele County, UT |
| Initial Operation Date | May 2024 |
| Last Update | Aug 2026 |
| Annual Generation | 192.1 GWh |
| Annual Consumption | 728.4 k MMBtu |
| Ranked #2,647 out of 13,301 Power Plants Nationwide | |
| Ranked #530 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #35 out of 121 Utah Power Plants | |
| Ranked #21 out of 57 Utah Solar Power Plants | |
| Fuel Types | Solar |
Map of Horseshoe Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Horseshoe Solar, LLC.
Monthly Net Generation for Horseshoe Solar, LLC
Monthly Plant Fuel Consumption for Horseshoe Solar, LLC
Horseshoe Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Horseshoe Solar, LLC (63984) |
| Plant Address | TBD, Tooele, UT 84029 |
| Utility | Horseshoe Solar, LLC (63638) |
| Latitude, Longitude | 40.71828, -112.6658 |
| Generation Dates on File | May 2024 to Aug 2026 |
| Initial Operation Date | May 2024 |
| Annual Generation | 192.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator HSS Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 75 MW |
| Summer Capacity | 75 MW |
| Winter Capacity | 75 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 97.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Horseshoe Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #520 | Spring Grove I | Spring Grove, VA | 197.8 GWh |
| #521 | Kelso 2 Solar | Benton, MO | 197.3 GWh |
| #522 | Point Beach Solar | Two Creeks, WI | 197.3 GWh |
| #523 | Desert Harvest II LLC | Desert Center, CA | 192.7 GWh |
| #524 | Crossett Solar | Crossett, AR | 196.4 GWh |
| #525 | Clover Creek Solar Community Solar | Mona, UT | 195.2 GWh |
| #526 | Solverde 1 | Lancaster, CA | 195.0 GWh |
| #527 | Barrett Solar Project | Point, TX | 193.3 GWh |
| #528 | Second Division Solar | West Columbia, TX | 193.2 GWh |
| #529 | San Pablo Raceway | Lancaster, CA | 192.5 GWh |
| #531 | Blackwater Solar | Bickley, GA | 191.5 GWh |
| #532 | Gilchrist County Solar | Newberry, FL | 191.3 GWh |
| #533 | Wautoma Solar | Wautoma, WI | 191.0 GWh |
| #534 | Arche Energy Project, LLC | Fayette, OH | 190.3 GWh |
| #535 | Mule Creek Renewable Energy Center | Panama City, FL | 190.3 GWh |
| #536 | Wildwood Solar Plant | Tutwiler, MS | 190.1 GWh |
| #537 | Three Creeks | Parrish, FL | 190.1 GWh |
| #538 | RE Astoria 2 | Rosamond, CA | 189.7 GWh |
| #539 | OETN1 | Obion, TN | 189.5 GWh |
| #540 | Three Corners Solar | Unity, ME | 189.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Horseshoe Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bountiful City | Bountiful, UT | 31.3 GWh | 42.4 mi |
| Copperton Solar Plant No. 1 | Bingham Canyon, UT | 7.3 GWh | 32 mi |
| Elektron Solar, LLC | Grantsville, UT | 209.7 GWh | 10.5 mi |
| Gadsby | Salt Lake City, UT | 194.6 GWh | 38.7 mi |
| Gateway | Mountain Green, UT | 8.0 GWh | 52.3 mi |
| Granite | Salt lake City, UT | 4.2 GWh | 46.8 mi |
| Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 8.2 GWh | 46.3 mi |
| HTW Plant 303 COGEN | Salt Lake City, UT | 46.0 GWh | 43.3 mi |
| Kennecott Power Plant | Magna, UT | 127.9 GWh | 28.5 mi |
| Little Cottonwood | Sandy, UT | 8.6 GWh | 46.3 mi |
| Murray Turbine | Murray, UT | 220.0 MWh | 40.8 mi |
| Pioneer | Ogden, UT | 10.4 GWh | 52.2 mi |
| Salt Lake Energy Systems | Salt Lake City, UT | 12.7 GWh | 33.1 mi |
| Salt Palace Solar Gen Plant | Salt Lake City, UT | 1.1 GWh | 40.5 mi |
| SF Auto O1 | Ogden, UT | 6.8 GWh | 48.3 mi |
| Stairs | Salt Lake City, UT | 4.1 GWh | 48.3 mi |
| Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 201.4 GWh | 40.2 mi |
| Trans-Jordan Generating Station | South Jordan, UT | 35.2 GWh | 33.7 mi |
| Weber State University - Davis Campus PV | Layton, UT | 1.9 GWh | 44.3 mi |
| West Valley Generation Project | West Valley City, UT | 343.8 GWh | 33.4 mi |