Blackwater Solar
TBD, Bickley, GA 31554Plant Summary Information
Blackwater Solar is ranked #31 out of 151 solar farms in Georgia in terms of total annual net electricity generation.
Blackwater Solar generated 57.9 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Blackwater Solar |
---|---|
Utility Name | Blackwater Solar, LLC |
Location | Ware County, GA |
Initial Operation Date | April 2024 |
Last Update | Jun 2025 |
Annual Generation | 148.5 GWh |
Annual Consumption | 581.1 k MMBtu |
Ranked #2,821 out of 12,513 Power Plants Nationwide | |
Ranked #524 out of 6,366 Solar Power Plants Nationwide | |
Ranked #72 out of 250 Georgia Power Plants | |
Ranked #31 out of 151 Georgia Solar Power Plants | |
Fuel Types | Solar |
Map of Blackwater Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blackwater Solar.
Monthly Net Generation for Blackwater Solar
Blackwater Solar Details
Summary Information | |
---|---|
Plant Name | Blackwater Solar (66025) |
Plant Address | TBD, Bickley, GA 31554 |
Utility | Blackwater Solar, LLC (65211) |
Latitude, Longitude | 31.39402, -82.62505 |
Generation Dates on File | Apr 2024 to Jun 2025 |
Initial Operation Date | April 2024 |
Annual Generation | 148.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF19-347-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GA-02 Details Operating April 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
DC Net Capacity | 112 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blackwater Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#514 | Blue Heron Solar | Clewiston, FL | 149.7 GWh |
#515 | Big Juniper Solar | TBD, FL | 149.6 GWh |
#516 | Roswell Solar, LLC | Roswell, NM | 149.6 GWh |
#517 | RE Astoria 2 | Rosamond, CA | 149.5 GWh |
#518 | Columbia Solar Power Plant | Fort White, FL | 149.5 GWh |
#519 | Hobnail Solar | Hephzibah, GA | 149.4 GWh |
#520 | Eastern Shore Solar, LLC | Oak Hall, VA | 149.2 GWh |
#521 | Echo River Solar | Live Oak, FL | 147.0 GWh |
#522 | Allora Solar, LLC | Gilbert, SC | 148.6 GWh |
#523 | Bay Tree | Harrells, NC | 148.6 GWh |
#525 | Okeechobee Solar | Vero Beach, FL | 148.5 GWh |
#526 | Chestnut Solar | Enfield, NC | 148.4 GWh |
#527 | SR DeSoto II | DeSoto, GA | 148.0 GWh |
#528 | Foxhound | Clover, VA | 148.0 GWh |
#529 | Hibiscus Solar Energy Center | Westlake, FL | 147.8 GWh |
#530 | Ghost Orchid Solar Energy Center | Clewiston, FL | 147.8 GWh |
#531 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 147.4 GWh |
#532 | High River Energy Center, LLC | Florida, NY | 147.2 GWh |
#533 | River Bend Solar, LLC (AL) | Florence, AL | 146.5 GWh |
#534 | Sundew | Port St Lucie, FL | 146.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blackwater Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baxley | Baxley, GA | 56.6 GWh | 37.6 mi |
Edwin I Hatch | Baxley, GA | 14.0 TWh | 40.8 mi |
Fountain Folkston | Folkston, GA | 4.3 GWh | 51.3 mi |
Hazlehurst II | Hazlehurst, GA | 79.3 GWh | 29.4 mi |
Hazlehurst III | Hazlehurst, GA | 81.7 GWh | 30.3 mi |
Jesup Plant | Jesup, GA | 466.5 GWh | 49.5 mi |
Lakeland Solar Energy LLC | Lakeland, GA | 3.4 GWh | 35.9 mi |
Moody Air Force Base Solar | Valdosta, GA | 85.2 GWh | 46.5 mi |
Pierce Eunice | Blackshear, GA | 4.3 GWh | 21.4 mi |
Snipesville | Denton, GA | 193.1 GWh | 23.4 mi |
SR Hazlehurst | Hazlehurst, GA | 31.8 GWh | 28.9 mi |
SR Snipesville II | Denton, GA | 240.1 GWh | 22.4 mi |
SR Snipesville III | Denton, GA | 244.7 GWh | 22.5 mi |
Telfair Thompson | McRae-Helena, GA | 4.3 GWh | 48.2 mi |
Tift Fletcher | Tifton, GA | 6.6 GWh | 51.8 mi |
Valdosta Water Treatment Plant | Valdosta, GA | 52.0 MWh | 49.8 mi |
Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh | 51.3 mi |
Ware Avra I | Waycross, GA | 6.4 GWh | 22.5 mi |
Ware Avra II | Waycross, GA | 3.8 GWh | 22.5 mi |
Westberry Jesup | Jesup, GA | 5.5 GWh | 43.3 mi |