Glaciers Edge Wind Project
808 450th St., Cleghorn, IA 51035Plant Summary Information
Glaciers Edge Wind Project is ranked #25 out of 284 power plants in Iowa in terms of total annual net electricity generation.
Glaciers Edge Wind Project generated 136.2 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Glaciers Edge Wind Project |
|---|---|
| Utility Name | EDF Renewable Asset Holdings, Inc. |
| Location | Cherokee County, IA |
| Initial Operation Date | December 2019 |
| Last Update | Aug 2026 |
| Annual Generation | 819.2 GWh |
| Annual Consumption | 2.9 M MMBtu |
| Ranked #888 out of 13,301 Power Plants Nationwide | |
| Ranked #140 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #25 out of 284 Iowa Power Plants | |
| Ranked #15 out of 123 Iowa Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Glaciers Edge Wind Project LLC (2018 to 2018) EDF Renewable Asset Holdings, Inc. (2019 to 2025) |
Map of Glaciers Edge Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Glaciers Edge Wind Project.
Monthly Net Generation for Glaciers Edge Wind Project
Monthly Plant Fuel Consumption for Glaciers Edge Wind Project
Glaciers Edge Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Glaciers Edge Wind Project (62035) |
| Plant Address | 808 450th St., Cleghorn, IA 51035 |
| Utility | EDF Renewable Asset Holdings, Inc. (57170) |
| Latitude, Longitude | 42.862, -95.772 |
| Generation Dates on File | Dec 2019 to Aug 2026 |
| Initial Operation Date | December 2019 |
| Annual Generation | 819.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG19-69 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator GEW Details Operating December 2019
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 211.7 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 82 |
| Turbine Details | |
| Number Of Turbines | 82 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.5-127 |
| Design Wind Speed | 18.6 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 292 |
Glaciers Edge Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #130 | Isabella Wind Park | Rosebush, MI | 831.7 GWh |
| #131 | Live Oak Wind Project | Eldorado, TX | 827.7 GWh |
| #132 | Big Sampson Wind | TBD, TX | 826.9 GWh |
| #133 | Wake Wind Energy Center | Floydada, TX | 825.7 GWh |
| #134 | Eclipse Wind Farm | Adair, IA | 821.7 GWh |
| #135 | Monte Cristo 1 | Monte Alto, TX | 821.5 GWh |
| #136 | Prevailing Wind Park | Lesterville, SD | 821.5 GWh |
| #137 | Horse Creek Wind Farm | Weinert, TX | 820.0 GWh |
| #138 | Blue Summit III Wind | Chilicothe, TX | 819.9 GWh |
| #139 | Oliver Wind IV | Hannover, ND | 819.2 GWh |
| #141 | Trinity Hills | Olney, TX | 817.7 GWh |
| #142 | Big Sky Wind LLC | Ohio, IL | 816.6 GWh |
| #143 | Blue Creek Wind Project | Paulding, OH | 814.8 GWh |
| #144 | Flat Top Wind I | Mullin, TX | 812.3 GWh |
| #145 | Electra Wind Farm | Oklaunion, TX | 812.1 GWh |
| #146 | Frontier Windpower II | Blackwell, OK | 810.6 GWh |
| #147 | Hidalgo Wind Farm LLC | McCook, TX | 810.4 GWh |
| #148 | Sunflower Energy Center, LLC | Peabody, KS | 809.1 GWh |
| #149 | Helena Wind | Pawnee, TX | 808.5 GWh |
| #150 | Kingman Wind | Cunningham, KS | 808.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Glaciers Edge Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Municipal Utilities | Alta, IA | 54.0 MWh | 27.1 mi |
| Earl F Wisdom | Spencer, IA | 4.1 GWh | 33.2 mi |
| Flying Cloud Power Partners LLC | Lake Park, IA | 98.1 GWh | 43.6 mi |
| Highland Wind Project (IA) | Primghar, IA | 951.2 GWh | 16.2 mi |
| Ida Grove II | Ida Grove, IA | 685.2 GWh | 40.3 mi |
| Ida Grove Wind | Ida Grove, IA | 1.1 TWh | 39.3 mi |
| Intrepid | Schaller, IA | 546.4 GWh | 31 mi |
| Lost Lakes Wind Farm LLC | Lake Park, IA | 270.1 GWh | 40.4 mi |
| O'Brien Wind | Primghar, IA | 851.2 GWh | 24.5 mi |
| Osceola Windpower II | Harris, IA | 191.6 GWh | 43.2 mi |
| Osceola Windpower LLC | Harris, IA | 386.2 GWh | 43.2 mi |
| Otter Creek Ethanol Poet - Ashton | Ashton, IA | 44.7 GWh | 28.6 mi |
| Plymouth Wind | Remsen, IA | 759.2 GWh | 8.7 mi |
| POET Biorefining - Hudson | Hudson, SD | 10.9 GWh | 39.2 mi |
| Sibley No Two | Sibley, IA | 37.0 MWh | 37 mi |
| Sibley One | Sibley, IA | 174.0 MWh | 37.6 mi |
| Spencer Gas Turbine | Spencer, IA | 86.0 MWh | 37.2 mi |
| Storm Lake 1 | Alta, IA | 86.9 GWh | 22.2 mi |
| Storm Lake II | Alta, IA | 114.6 GWh | 18.6 mi |
| Upland Prairie | Spencer, IA | 1.1 TWh | 32 mi |