Route 66 Wind Plant
Farm To Market Road 2161, Panhandle, TX 79068Plant Summary Information
Route 66 Wind Plant is ranked #82 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Route 66 Wind Plant generated 136.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Route 66 Wind Plant |
---|---|
Utility Name | Onward Energy |
Location | Carson County, TX |
Initial Operation Date | August 2015 |
Last Update | Dec 2024 |
Annual Generation | 608.2 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,116 out of 12,299 Power Plants Nationwide | |
Ranked #265 out of 1,353 Wind Power Plants Nationwide | |
Ranked #208 out of 792 Texas Power Plants | |
Ranked #82 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
First Wind O&M, LLC (2013 to 2015) Novatus Energy (2016 to 2019) Onward Energy (2020 to 2024) |
Map of Route 66 Wind Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Route 66 Wind Plant.
Monthly Net Generation for Route 66 Wind Plant
Route 66 Wind Plant Details
Summary Information | |
---|---|
Plant Name | Route 66 Wind Plant (58681) |
Plant Address | Farm To Market Road 2161, Panhandle, TX 79068 |
Utility | Onward Energy (60453) |
Latitude, Longitude | 35.20528, -101.43417 |
Generation Dates on File | Aug 2015 to Dec 2024 |
Initial Operation Date | August 2015 |
Annual Generation | 608.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 15-97 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Sharyland Utilities LP (17008) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator RT661 Details Operating August 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ROUTE66_RN |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ROUTE66_RN |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 75 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 75 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V110-2.0 |
Design Wind Speed | 16.7 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Route 66 Wind Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#255 | Cedar Springs II | Douglas, WY | 618.5 GWh |
#256 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
#257 | Pioneer Hutt Wind Energy | Midland, TX | 615.1 GWh |
#258 | Chevelon Butte Wind Farm | Winslow, AZ | 614.6 GWh |
#259 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
#260 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
#261 | Wild Horse | Ellensburg, WA | 612.8 GWh |
#262 | Castle Gap Wind | Goldthwaite, TX | 611.6 GWh |
#263 | FPL Energy Crystal Lake Wind LLC | Britt, IA | 610.9 GWh |
#264 | Moraine Sands Wind Power | Mason City, IL | 608.6 GWh |
#266 | Prairie Wind Farm | Montezuma, IA | 605.0 GWh |
#267 | Jumbo Hill Wind Project | Andrews, TX | 604.6 GWh |
#268 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 604.1 GWh |
#269 | Heart of Texas Wind Project | Brady, TX | 603.6 GWh |
#270 | Mountain Breeze Wind, LLC | Grover, CO | 603.2 GWh |
#271 | Weatherford Wind Energy Center | Weatherford, OK | 602.5 GWh |
#272 | Boiling Springs Wind Farm | Woodward, OK | 602.0 GWh |
#273 | Golden Hill Wind | Wasco, OR | 601.0 GWh |
#274 | English Farms | Montezuma, IA | 599.3 GWh |
#275 | Prairie Breeze | Elgin, NE | 595.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Route 66 Wind Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Astra Wind Farm | Happy, TX | 567.0 GWh | 46.2 mi |
Black Hawk Station | Borger, TX | 1.3 TWh | 34.1 mi |
Borger Plant | Borger, TX | 46.6 GWh | 31.7 mi |
Colbeck's Corner, LLC | Groom, TX | 818.3 GWh | 14.4 mi |
Engineered Carbons Borger Cogen | Borger, TX | 80.2 GWh | 31.9 mi |
Golden Spread Panhandle Wnd Rch | Wilderado, TX | 181.7 GWh | 43.9 mi |
Goodnight | Claude, TX | 809.0 GWh | 9.8 mi |
Grandview Wind Farm, LLC | Panhandle, TX | 892.5 GWh | 7.3 mi |
Harrington | Amarillo, TX | 2.3 TWh | 18.8 mi |
Llano Estacado Wind Ranch | White Deer, TX | 94.8 GWh | 20.8 mi |
Majestic 1 Wind Farm | Panhandle, TX | 365.1 GWh | 14 mi |
Majestic II Wind | Panhandle, TX | 157.4 GWh | 14.9 mi |
Nichols | Amarillo, TX | 1.7 TWh | 18.4 mi |
Pantex | Amarillo, TX | 24.3 GWh | 9.8 mi |
Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh | 16.8 mi |
Pattern Panhandle Wind LLC | Panhandle, TX | 519.7 GWh | 18.4 mi |
Salt Fork Wind Project, LLC | Clarendon, TX | 705.4 GWh | 28.3 mi |
Spinning Spur Wind LLC | Vegas, TX | 334.2 GWh | 43.5 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 8.8 GWh | 25.8 mi |
Wildorado Wind LLC | Vega, TX | 692.1 GWh | 49.4 mi |