Old Settler Wind
1904 FM 786, Floydada, TX 79235Plant Summary Information
Old Settler Wind is ranked #104 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Old Settler Wind generated 157.8 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Old Settler Wind |
|---|---|
| Utility Name | Old Settler Wind, LLC |
| Location | Floyd County, TX |
| Initial Operation Date | April 2017 |
| Last Update | Feb 2026 |
| Annual Generation | 555.0 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,245 out of 12,637 Power Plants Nationwide | |
| Ranked #324 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #243 out of 820 Texas Power Plants | |
| Ranked #104 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Old Settler Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Old Settler Wind.
Monthly Net Generation for Old Settler Wind
Monthly Plant Fuel Consumption for Old Settler Wind
Old Settler Wind Details
| Summary Information | |
|---|---|
| Plant Name | Old Settler Wind (60366) |
| Plant Address | 1904 FM 786, Floydada, TX 79235 |
| Utility | Old Settler Wind, LLC (60155) |
| Latitude, Longitude | 34.06033, -101.18763 |
| Generation Dates on File | Apr 2017 to Feb 2026 |
| Initial Operation Date | April 2017 |
| Annual Generation | 555.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | EG17-43-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Sharyland Utilities LP (17008) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator OSWF Details Operating April 2017
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | COTPLNS_RN |
| Nameplate Capacity | 151.2 MW |
| Summer Capacity | 151.2 MW |
| Winter Capacity | 151.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 63 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 63 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.4-107 |
| Design Wind Speed | 18.2 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
Old Settler Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #314 | Blackjack Creek Wind Farm | Skidmore, TX | 560.9 GWh |
| #315 | English Farms | Montezuma, IA | 559.6 GWh |
| #316 | Headwaters Wind Farm II LLC | Losanville, IN | 558.9 GWh |
| #317 | Old Trail Wind Farm | Ellsworth, IL | 558.3 GWh |
| #318 | Caney River Wind Project | Howard, KS | 558.2 GWh |
| #319 | Limon Wind I | Limon, CO | 558.0 GWh |
| #320 | Northern Colorado Wind LLC | Peetz, CO | 557.5 GWh |
| #321 | Maryneal Windpower | Maryneal, TX | 557.3 GWh |
| #322 | Desert Wind Farm, LLC | Hertford, NC | 556.9 GWh |
| #323 | Merricourt Wind Energy Center | Kulm, ND | 555.1 GWh |
| #325 | Adair Wind Farm | Adair, IA | 554.8 GWh |
| #326 | Moraine Sands Wind Power | Mason City, IL | 553.5 GWh |
| #327 | NaturEner Rim Rock Energy | Kevin, MT | 551.0 GWh |
| #328 | Pattern Panhandle Wind LLC | Panhandle, TX | 550.1 GWh |
| #329 | Intrepid | Schaller, IA | 549.4 GWh |
| #330 | Osage Wind, LLC | Burbank, OK | 549.0 GWh |
| #331 | Elk City LLC | Sweetwater, OK | 547.2 GWh |
| #332 | Wagon Wheel Wind | OK | 544.7 GWh |
| #333 | Manzana Wind LLC | Rosamond, CA | 543.7 GWh |
| #334 | Blue Canyon Windpower II | Carnegie, OK | 543.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Old Settler Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Station | Abernathy, TX | 267.1 GWh | 39.9 mi |
| BESSP1, LLC. | Shallowater, TX | 9.5 GWh | 51.5 mi |
| Brandon Station | Lubbock, TX | 21.7 GWh | 51.8 mi |
| Briscoe Wind Farm | Silverton, TX | 451.1 GWh | 25.9 mi |
| Cotton Plains Wind Farm | Floydada, TX | 187.5 GWh | 0 mi |
| Elk Station | Abernathy, TX | 1.3 TWh | 39.9 mi |
| Hale Community Wind Farm | Plainview, TX | 2.0 TWh | 33.1 mi |
| Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh | 33.4 mi |
| Jones | Lubbock, TX | 3.2 TWh | 48.8 mi |
| Longhorn Wind | Silverton, TX | 707.7 GWh | 17.7 mi |
| Lorenzo Wind | Lorenzo, TX | 353.7 GWh | 31.6 mi |
| McAdoo Wind Energy LLC | McAdoo, TX | 363.6 GWh | 24.8 mi |
| Pleasant Hill Wind Energy Project | Lorenzo, TX | 39.9 GWh | 28 mi |
| Ralls Wind Farm | Ralls, TX | 10.6 GWh | 29.9 mi |
| Roaring Springs, LLC | Motley, TX | 176.3 GWh | 21.2 mi |
| South Plains II | Lockney, TX | 1.0 TWh | 14.6 mi |
| South Plains Wind Phase I | Floydada, TX | 689.2 GWh | 7.9 mi |
| Ty Cooke | Lubbock, TX | 3.7 GWh | 50.9 mi |
| Wake Wind Energy Center | Floydada, TX | 883.8 GWh | 17 mi |
| Whirlwind Energy Center | Floydada, TX | 101.5 GWh | 6 mi |