Tenaska Frontier Generation Station
17500 Hwy 30, Shiro, TX 77876Plant Summary Information
Tenaska Frontier Generation Station is ranked #40 out of 814 power plants in Texas in terms of total annual net electricity generation.
Tenaska Frontier Generation Station is comprised of 4 generators and generated 548.4 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Tenaska Frontier Generation Station |
|---|---|
| Utility Name | Tenaska Frontier Partners Ltd |
| Location | Grimes County, TX |
| Initial Operation Date | May 2000 |
| Last Update | Mar 2026 |
| Annual Generation | 3.4 TWh |
| Annual Consumption | 24.8 M MMBtu |
| Ranked #344 out of 12,332 Power Plants Nationwide | |
| Ranked #191 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #40 out of 814 Texas Power Plants | |
| Ranked #30 out of 308 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Tenaska Frontier Generation Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tenaska Frontier Generation Station.
Monthly Net Generation for Tenaska Frontier Generation Station
Monthly Plant Fuel Consumption for Tenaska Frontier Generation Station
Tenaska Frontier Generation Station Details
| Summary Information | |
|---|---|
| Plant Name | Tenaska Frontier Generation Station (55062) |
| Plant Address | 17500 Hwy 30, Shiro, TX 77876 |
| Utility | Tenaska Frontier Partners Ltd (18611) |
| Latitude, Longitude | 30.5924, -95.9178 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | May 2000 |
| Annual Generation | 3.4 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 00-91-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 356.00 kV / 352.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
| Natural Gas Storage | No |
Generator GTG1 Details Operating May 2000
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | STG1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | FTR_CC1 (ERCOT) |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | FTRCC1 |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 155 MW |
| Winter Capacity | 177 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2000 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GTG2 Details Operating May 2000
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | STG1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | FTR_CC1 (ERCOT) |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | FTRCC1 |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 155 MW |
| Winter Capacity | 177 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2000 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GTG3 Details Operating May 2000
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | STG1 |
| Ownership | Jointly Owned |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | FTR_CC1 (ERCOT) |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | FRTCC1 |
| Nameplate Capacity | 183.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 155 MW |
| Winter Capacity | 177 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2000 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating May 2000
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | STG1 |
| Ownership | Jointly Owned |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | FTR_CC1 (ERCOT) |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | FTRCC1 |
| Nameplate Capacity | 390.1 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 395 MW |
| Winter Capacity | 395 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2000 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Tenaska Frontier Generation Station Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Tenaska VI Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.47% |
| Montana Grimes County LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.25% |
| Montana Grimes Frontier LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 24.75% |
| Tanaska Grimes Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 74.25% |
| Diamond Frontier LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG1 | 0.28% |
| Tenaska VI Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.47% |
| Montana Grimes County LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.25% |
| Montana Grimes Frontier LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 24.75% |
| Tanaska Grimes Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 74.25% |
| Diamond Frontier LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG2 | 0.28% |
| Tenaska VI Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.47% |
| Montana Grimes County LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.25% |
| Montana Grimes Frontier LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 24.75% |
| Tanaska Grimes Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 74.25% |
| Diamond Frontier LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator GTG3 | 0.28% |
| Tenaska VI Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 0.47% |
| Montana Grimes County LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 0.25% |
| Montana Grimes Frontier LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 24.75% |
| Tanaska Grimes Partners LP | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 74.25% |
| Diamond Frontier LLC | 14302 FNB Parkway, Omaha, NE 68154 | Generator STG1 | 0.28% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #181 | Long Ridge Energy Generation | Hannibal, OH | 3.5 TWh |
| #182 | Kings Mountain Energy Center | Kings Mountain, NC | 3.5 TWh |
| #183 | Westbrook Energy Center Power Plant | Westbrook, ME | 3.5 TWh |
| #184 | Bear Garden | New Canton, VA | 3.5 TWh |
| #185 | Riverside Energy Center | Beloit, WI | 3.5 TWh |
| #186 | McWilliams | Gantt, AL | 3.5 TWh |
| #187 | Curtis H Stanton Energy Center | Orlando, FL | 3.5 TWh |
| #188 | Bethlehem Energy Center | Glenmont, NY | 3.4 TWh |
| #189 | Bobby C Smith Jr Energy Facility | Rincon, GA | 3.4 TWh |
| #190 | Wildcat Point Generation Facility | Conowingo, MD | 3.4 TWh |
| #192 | High Desert Power Plant | Victorville, CA | 3.4 TWh |
| #193 | Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.4 TWh |
| #194 | Magnet Cove | Malvern, AR | 3.4 TWh |
| #195 | Bergen Generating Station | Ridgefield, NJ | 3.5 TWh |
| #196 | High Bridge | St. Paul, MN | 3.4 TWh |
| #197 | J Lamar Stall Unit | Shreveport, LA | 3.4 TWh |
| #198 | Lagoon Creek | Brownsville, TN | 3.3 TWh |
| #199 | Marshall (NC) | Terrell, NC | 7.1 TWh |
| #200 | ANP Bellingham Energy Project | Bellingham, MA | 3.3 TWh |
| #201 | Carty Generating Station | Boardman, OR | 3.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tenaska Frontier Generation Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Jay Solar I, LLC | Iola, TX | 437.0 GWh | 11.9 mi |
| Bryan (TX) | Bryan, TX | 1.5 GWh | 27.3 mi |
| Central Utility Plant - Texas A&M | College Station, TX | 138.7 GWh | 25.4 mi |
| Dansby | Bryan, TX | 149.9 GWh | 33.5 mi |
| Grimes County Solar | Lola, TX | 102.7 GWh | 11.1 mi |
| HEB00020 | Cypress, TX | 254.0 MWh | 42.7 mi |
| HEB00099 | Houston, TX | 345.0 MWh | 46 mi |
| HEB00594 | The Woodlands, TX | 279.0 MWh | 36.4 mi |
| HEB00767 | Magnolia, TX | 165.0 MWh | 29.2 mi |
| Lewis Creek | Willis, TX | 2.0 TWh | 26 mi |
| Montgomery County | Willis, TX | 5.9 TWh | 25.5 mi |
| OTHERTexasA&M | Bryan, TX | 1.3 GWh | 32.5 mi |
| Parliament Solar | TX | 281.0 GWh | 42.4 mi |
| Security | Cleveland, TX | 6.2 GWh | 43 mi |
| WAL3390 | The Woodlands, TX | 282.0 MWh | 34 mi |
| WAL5045 | Tomball, TX | 314.0 MWh | 44.3 mi |
| WAL5091 | Cypress, TX | 288.0 MWh | 44.6 mi |
| WAL5287 | Spring, TX | 226.0 MWh | 43 mi |
| WAL602 | Spring, TX | 223.0 MWh | 42.4 mi |
| WAL849 | Spring, TX | 254.0 MWh | 46.7 mi |