Central Utility Plant - Texas A&M
496 Asbury, College Station, TX 77843Plant Summary Information
Central Utility Plant - Texas A&M is ranked #128 out of 291 natural gas power plants in Texas in terms of total annual net electricity generation.
Central Utility Plant - Texas A&M is comprised of 2 generators and generated 14.5 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Central Utility Plant - Texas A&M |
---|---|
Utility Name | Texas A&M, Utilities & Energy Services |
Location | Brazos County, TX |
Initial Operation Date | December 1956 |
Last Update | Feb 2024 |
Annual Generation | 128.1 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #2,875 out of 11,455 Power Plants Nationwide | |
Ranked #854 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #407 out of 726 Texas Power Plants | |
Ranked #128 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Central Utility Plant - Texas A&M
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Central Utility Plant - Texas A&M.
Monthly Net Generation for Central Utility Plant - Texas A&M
Central Utility Plant - Texas A&M Details
Summary Information | |
---|---|
Plant Name | Central Utility Plant - Texas A&M (58151) |
Plant Address | 496 Asbury College Station, TX 77843 |
Utility | Texas A&M, Utilities & Energy Services (58113) |
Latitude, Longitude | 30.61778, -96.34333 |
Generation Dates on File | Jan 2012 to Feb 2024 |
Initial Operation Date | December 1956 |
Annual Generation | 128.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Bryan - (TX) (2442) TX |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
Natural Gas Storage | No |
Generator GTG01 Details Operating August 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | UES1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | North Load Zone |
RTO ISO Location Designation For Reporting Wholesale Sales Data | North Load Zone |
Nameplate Capacity | 34.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 32.4 MW |
Winter Capacity | 34.1 MW |
Minimum Load | 27 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2011 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG02 Details Operating August 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | UES1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | North Load Zone |
RTO ISO Location Designation For Reporting Wholesale Sales Data | North Load Zone |
Nameplate Capacity | 11 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 11 MW |
Winter Capacity | 11 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2011 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 11 MW |
Net Winter Capacity With Natural Gas | 11 MW |
Net Summer Capacity With Oil | 11 MW |
Net Winter Capacity With Oil | 11 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Central Utility Plant - Texas A&M Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#844 | Lieberman | Mooringsport, LA | 134.7 GWh |
#845 | West Marinette | Peshtigo, WI | 133.0 GWh |
#846 | Energy Shelby County | Neoga, IL | 132.1 GWh |
#847 | UCONN Cogen Facility | Storrs, CT | 132.5 GWh |
#848 | Enterprise Products Operating | Mont Belvieu, TX | 130.4 GWh |
#849 | South Plant | Colorado Springs, CO | 135.3 GWh |
#850 | Pratt & Whitney | East Hartford, CT | 130.4 GWh |
#851 | Vernon Boulevard | Long Island City, NY | 129.9 GWh |
#852 | Permian Basin | Monahans, TX | 131.1 GWh |
#853 | D G Hunter | Alexandria, LA | 128.1 GWh |
#855 | Indiana Harbor West | East Chicago, IN | 155.2 GWh |
#856 | West Marinette 34 | Peshtigo, WI | 126.1 GWh |
#857 | Hardin County Peaking Facility | Kountze, TX | 125.3 GWh |
#858 | Pittsburgh Airport Gas Plant | Coraopolis, PA | 125.2 GWh |
#859 | Algonquin Windsor Locks | Windsor Locks, CT | 125.1 GWh |
#860 | BYU Central Heating Plant | Provo, UT | 124.6 GWh |
#861 | Meramec | St. Louis, MO | 177.3 GWh |
#862 | Purdue University | West Lafayette, IN | 153.2 GWh |
#863 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 288.1 GWh |
#864 | Harlem River Yard | Bronx, NY | 121.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Central Utility Plant - Texas A&M.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Jay Solar I, LLC | Iola, TX | 300.6 GWh | 17.8 mi |
Bryan (TX) | Bryan, TX | 1.9 GWh | 2.7 mi |
Dansby | Bryan, TX | 228.2 GWh | 10 mi |
E-Volve Energy Holdings LLC | Sealy, TX | 1.7 GWh | 61.6 mi |
Fayette Power Project | La Grange, TX | 8.1 TWh | 54.2 mi |
Five Wells Solar Center - Hybrid | Rogers, TX | 91.3 GWh | 60.4 mi |
HEB00020 | Cypress, TX | 262.5 MWh | 56.1 mi |
HEB00594 | The Woodlands, TX | 290.0 MWh | 56.8 mi |
Lewis Creek | Willis, TX | 2.1 TWh | 50.5 mi |
Limestone | Jewett, TX | 6.4 TWh | 55.8 mi |
Major Oak Power | Bremond, TX | 2.4 TWh | 38.8 mi |
Marlin Solar | Marlin, TX | 11.1 GWh | 56 mi |
Montgomery County | Willis, TX | 6.0 TWh | 50.1 mi |
Oak Grove (TX) | Franklin, TX | 12.9 TWh | 39.8 mi |
Tenaska Frontier Generation Station | Shiro, TX | 4.4 TWh | 25.4 mi |
WAL3390 | The Woodlands, TX | 336.0 MWh | 53.8 mi |
WAL5045 | Tomball, TX | 464.6 MWh | 61.1 mi |
WAL5091 | Cypress, TX | 444.6 MWh | 58.7 mi |
WAL5287 | Spring, TX | 343.8 MWh | 62 mi |
Winchester Power Park | Winchester, TX | 89.4 GWh | 56.4 mi |