Central Utility Plant - Texas A&M
496 Asbury, College Station, TX 77843Plant Summary Information
Central Utility Plant - Texas A&M is ranked #135 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
Central Utility Plant - Texas A&M is comprised of 2 generators and generated 26.2 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Central Utility Plant - Texas A&M |
|---|---|
| Utility Name | Texas A&M, Utilities & Energy Services |
| Location | Brazos County, TX |
| Initial Operation Date | December 1956 |
| Last Update | Feb 2026 |
| Annual Generation | 138.5 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #3,039 out of 12,637 Power Plants Nationwide | |
| Ranked #828 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #482 out of 820 Texas Power Plants | |
| Ranked #135 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Central Utility Plant - Texas A&M
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Central Utility Plant - Texas A&M.
Monthly Net Generation for Central Utility Plant - Texas A&M
Monthly Plant Fuel Consumption for Central Utility Plant - Texas A&M
Central Utility Plant - Texas A&M Details
| Summary Information | |
|---|---|
| Plant Name | Central Utility Plant - Texas A&M (58151) |
| Plant Address | 496 Asbury, College Station, TX 77843 |
| Utility | Texas A&M, Utilities & Energy Services (58113) |
| Latitude, Longitude | 30.61778, -96.34333 |
| Generation Dates on File | Jan 2012 to Feb 2026 |
| Initial Operation Date | December 1956 |
| Annual Generation | 138.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial CHP (5) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Bryan - (TX) (2442) TX |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
| Natural Gas Storage | No |
Generator GTG01 Details Operating August 2011
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | UES1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | North Load Zone |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | North Load Zone |
| Nameplate Capacity | 34.1 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 32.4 MW |
| Winter Capacity | 34.1 MW |
| Minimum Load | 27 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2011 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG02 Details Operating August 2011
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | UES1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | North Load Zone |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | North Load Zone |
| Nameplate Capacity | 11 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 11 MW |
| Winter Capacity | 11 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2011 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 11 MW |
| Net Winter Capacity With Natural Gas | 11 MW |
| Net Summer Capacity With Oil | 11 MW |
| Net Winter Capacity With Oil | 11 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Central Utility Plant - Texas A&M Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #818 | Wasson CO2 Removal Plant | Denver City, TX | 145.6 GWh |
| #819 | Escanaba Mill | Escanaba, MI | 462.4 GWh |
| #820 | LEPA Unit No. 1 | Morgan City, LA | 144.7 GWh |
| #821 | NIH Cogeneration Facility | Bethesda, MD | 142.9 GWh |
| #822 | Hamlet Generating Facility | Hamlet, NC | 144.9 GWh |
| #823 | PSEG Kearny Generating Station | Kearny, NJ | 141.1 GWh |
| #824 | San Jacinto County Peaking Facility | Shepherd, TX | 139.6 GWh |
| #825 | Berry Cogen Tanne Hills 18 | Maricopa, CA | 139.4 GWh |
| #826 | Stillwater Energy Center | Stillwater, OK | 138.8 GWh |
| #827 | Seminole Mill | Jacksonville, FL | 138.7 GWh |
| #829 | Bayou Cove Peaking Power | Jennings, LA | 138.3 GWh |
| #830 | Algonquin Windsor Locks | Windsor Locks, CT | 147.0 GWh |
| #831 | Sentinel Energy Center, LLC | Desert Hot Springs, CA | 135.4 GWh |
| #832 | Saguaro | Red Rock, AZ | 135.2 GWh |
| #833 | Basin Creek Plant | Butte, MT | 134.5 GWh |
| #834 | C R Wing Cogen Plant | Big Spring, TX | 133.7 GWh |
| #835 | Domtar Kingsport Mill | Kingsport, TN | 181.4 GWh |
| #836 | Elk River | Elk River, MN | 147.3 GWh |
| #837 | Rand Whitney CHP Plant | Montville, CT | 132.6 GWh |
| #838 | Cleary Flood Hybrid | Taunton, MA | 132.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Central Utility Plant - Texas A&M.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Jay Solar I, LLC | Iola, TX | 442.0 GWh | 17.3 mi |
| Bryan (TX) | Bryan, TX | 1.5 GWh | 2.7 mi |
| BT Jungmann | Buckholts, TX | 87.4 GWh | 46.8 mi |
| Dansby | Bryan, TX | 149.9 GWh | 10 mi |
| Diver Solar, LLC | Thornton, TX | 228.4 GWh | 43.8 mi |
| Gransolar Texas One, LLC | Thorndale, TX | 115.3 GWh | 48.3 mi |
| Grimes County Solar | Lola, TX | 60.2 GWh | 15.2 mi |
| HEB00767 | Magnolia, TX | 165.0 MWh | 48 mi |
| Lewis Creek | Willis, TX | 1.9 TWh | 50.5 mi |
| Major Oak Power | Bremond, TX | 2.2 TWh | 38.8 mi |
| Montgomery County | Willis, TX | 5.9 TWh | 50.1 mi |
| Oak Grove (TX) | Franklin, TX | 11.2 TWh | 39.8 mi |
| Orion I Solar Project | Burlington, TX | 449.7 GWh | 47 mi |
| Orion II Solar Project | Rosebud, TX | 557.0 GWh | 45.2 mi |
| Orion III Solar Project | Buckholts, TX | 553.8 GWh | 52.1 mi |
| OTHERTexasA&M | Bryan, TX | 1.3 GWh | 7.2 mi |
| Parliament Solar | TX | 184.5 GWh | 50.2 mi |
| Stoneridge Solar, LLC | Thorndale, TX | 92.0 GWh | 45.7 mi |
| Tenaska Frontier Generation Station | Shiro, TX | 3.4 TWh | 25.4 mi |
| WAL3390 | The Woodlands, TX | 282.0 MWh | 53.8 mi |