Directory of Power Plants in New York
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Malone Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Nov 2018 | Dec 2024 | Solar |
Sweden 1 | Helios Energy New York 3 LLC | Sweden, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Aug 2021 | Dec 2024 | Solar |
Hamlin 1 | Helios Energy New York 2 LLC | Hamlin, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2021 | Dec 2024 | Solar |
Geneseo Solar | Helios Energy New York 15 LLC | Geneseo, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Nov 2021 | Dec 2024 | Solar |
Guilderland Solar | Helios Energy New York 13 LLC | Altamont, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2023 | Dec 2024 | Solar |
Hawkeye Energy Greenport LLC | Hawkeye Energy Greenport LLC | Greenport, NY | New York Independent System Operator (NYIS) | 24.8 GWh | Jun 2003 | Dec 2024 | Kerosene |
Harbec Energy | Harbec Energy | Ontario, NY | New York Independent System Operator (NYIS) | 598.0 MWh | Nov 2001 | Dec 2024 | Natural Gas : 97.3% Wind : 2.7% |
Hampshire Paper | Hampshire Paper Co Inc | Gouverneur, NY | New York Independent System Operator (NYIS) | 12.1 GWh | Apr 1987 | Dec 2024 | Water |
Hales Mills Solar, LLC | Hales Mills Solar, LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Sep 2020 | Dec 2024 | Solar |
Greenidge Generation LLC | Greenidge Generation Holdings LLC | Dresden, NY | New York Independent System Operator (NYIS) | 673.5 GWh | Nov 1953 | Dec 2024 | Natural Gas |
Greene Community Solar | Greene Community Solar LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 12.0 MWh | Nov 2024 | Dec 2024 | Solar |
Hecate Energy Albany 2 LLC | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 24.7 GWh | Mar 2024 | Dec 2024 | Solar |
Capital Hill Solar LLC | Greenbacker Renewable Energy Corporation | Albany, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Dec 2021 | Dec 2024 | Solar |
Millersport GM 1 | Greenbacker Renewable Energy Corporation | Amherst, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Feb 2023 | Dec 2024 | Solar |
Fredonia Solar LLC | Greenbacker Renewable Energy Corporation | Fredonia, NY | ISO New England (ISNE) | 1.5 GWh | Aug 2021 | Dec 2024 | Solar |
Bizer Creek | Greenbacker Renewable Energy Corporation | Getzville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Mar 2023 | Dec 2024 | Solar |
Hope Solar Farm LLC | Green Street Power Partners | Troy, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2019 | Dec 2024 | Solar |
Catlin Solar 1 LLC | Green Street Power Partners | Beaver Dams, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2024 | Solar |
Sunvestment Energy Group NY 63 LLC | Green Street Power Partners | East Syracuse, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Aug 2020 | Dec 2024 | Solar |
Riley Road LLC | Green Street Power Partners | New Windsor, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jul 2019 | Dec 2024 | Solar |
Saratoga Solar LLC | Green Street Power Partners | Milton, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2019 | Dec 2024 | Solar |
Washington Avenue Solar, LLC | Green Street Power Partners | Glenville, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Nov 2020 | Dec 2024 | Solar |
Saratoga Solar IV, LLC | Green Street Power Partners | Rock City Falls, NY | ISO New England (ISNE) | 4.2 GWh | Sep 2023 | Dec 2024 | Solar |
Swaggertown Solar II | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 1.3 GWh | Aug 2024 | Dec 2024 | Solar |
Swaggertown Solar I | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 122.0 MWh | Oct 2024 | Dec 2024 | Solar |
Randall Road Solar II | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 1.2 GWh | Jun 2024 | Dec 2024 | Solar |
Randall Road Solar I | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 2.0 GWh | Jun 2024 | Dec 2024 | Solar |
Saratoga Solar III, LLC | Green Street Power Partners | Middle Grove, NY | ISO New England (ISNE) | 5.7 GWh | Nov 2023 | Dec 2024 | Solar |
GSPP 126 Little Bow Rd S, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 4.2 GWh | Nov 2023 | Dec 2024 | Solar |
GSPP 126 Little Bow Rd N, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 3.2 GWh | Nov 2023 | Dec 2024 | Solar |
GSPP 4643 Twelve Corners Road, LLC | Green Street Power Partners | Auburn, NY | ISO New England (ISNE) | 8.0 GWh | May 2023 | Dec 2024 | Solar |
GSPP 7024 Fox Rd, LLC | Green Street Power Partners | Marcy, NY | ISO New England (ISNE) | 7.6 GWh | Apr 2023 | Dec 2024 | Solar |
Carver Falls | Green Mountain Power Corp | Hampton, NY | ISO New England (ISNE) | 5.8 GWh | Jan 1922 | Dec 2024 | Water |
DOCCS Greene | Green Correctional Coxsackie NY Solar LLC | Coxsackie, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Sep 2022 | Dec 2024 | Solar |
NY Grand Island 871 Whitehaven Rd Solar | Grand Island Sunrise LLC | Grand Island, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Feb 2024 | Dec 2024 | Solar |
Grabinski | Grabinski Solar LLC | Walden, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Jun 2019 | Aug 2024 | Solar |
Dahowa Hydro | GR Catalyst Two LLC | Greenwich, NY | New York Independent System Operator (NYIS) | 44.6 GWh | Nov 1987 | Dec 2023 | Water |
Stillwater Hydro Electric Project | GR Catalyst One, LLC | Stillwater, NY | New York Independent System Operator (NYIS) | 11.6 GWh | Mar 1993 | Dec 2023 | Water |
Gore Mountain Solar II | Gore Mountain Solar II, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Aug 2016 | Dec 2024 | Solar |
Good Samaritan Hospital | Good Samaritan Hospital | Suffern, NY | New York Independent System Operator (NYIS) | 46.0 MWh | Dec 1979 | Dec 2023 | Distillate Fuel Oil : 94.6% Natural Gas : 5.4% |
Gloversville Landfill Solar | Gloversville Community Solar LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Apr 2021 | Dec 2024 | Solar |
Kelly Bridge Road Community Solar Farm | Generate Capital | Liberty, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Dec 2019 | Dec 2024 | Solar |
Villa Roma Rd #1 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2020 | Dec 2024 | Solar |
State Highway 17B Solar | Generate Capital | Bethel, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2021 | Dec 2024 | Solar |
Villa Roma Rd #2 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jan 2020 | Dec 2024 | Solar |
Yellow Mills Rd #3 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
Yellow Mills Rd #2 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2022 | Dec 2024 | Solar |
Yellow Mills Rd #1 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
Route 19 #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 8.6 GWh | May 2022 | Dec 2024 | Solar |
Route 19 #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.9 GWh | May 2022 | Dec 2024 | Solar |
Telegraph Rd #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2024 | Solar |
Telegraph Rd #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Nov 2021 | Dec 2024 | Solar |
Burritt Rd Community Solar Farm | Generate Capital | Parma, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jan 2020 | Dec 2024 | Solar |
Boas Rd #4 Community Solar Farm | Generate Capital | Mooers, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2020 | Dec 2024 | Solar |
Big Tree Community Solar Farm | Generate Capital | Wales, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2021 | Dec 2024 | Solar |
Washington St Community Solar Farm #3 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Mar 2020 | Dec 2024 | Solar |
Washington St Community Solar Farm #1 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jan 2020 | Dec 2024 | Solar |
Washington St Community Solar Farm #4 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jan 2020 | Dec 2024 | Solar |
Sacket Lake Rd #1 Community Solar Farm | Generate Capital | Thompson, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Dec 2019 | Dec 2024 | Solar |
Pool Brook Rd Community Solar Farm | Generate Capital | Laurens, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Mar 2019 | Dec 2023 | Solar |
Reid Solar | Generate Capital | Rome, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Mar 2021 | Dec 2024 | Solar |
McCarthy Solar | Generate Capital | Blooming Grove, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 2021 | Dec 2024 | Solar |
Bantam Solar | Generate Capital | Saint Johnsville, NY | New York Independent System Operator (NYIS) | 9.5 GWh | Feb 2022 | Dec 2024 | Solar |
Salt Point Solar (Hybrid) | Generate Capital | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Dec 2020 | Dec 2024 | Solar : 99.9% |
Brickchurch Solar | Generate Capital | North Rose, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Feb 2020 | Dec 2024 | Solar |
Canoga Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Jun 2021 | Dec 2024 | Solar |
Costanza Solar | Generate Capital | Westerlo, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
County Route 84 Solar | Generate Capital | Troupsburg, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Nov 2021 | Dec 2024 | Solar |
Cafferty Hill Solar | Generate Capital | Owego, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Feb 2022 | Dec 2024 | Solar |
Donati Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Sep 2021 | Dec 2024 | Solar |
Reisender Solar | Generate Capital | Ellenville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2024 | Solar |
Bogart Solar | Generate Capital | Palenville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2023 | Solar |
Dubois Solar (Hybrid) | Generate Capital | Pine Bush, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2020 | Dec 2024 | Solar : 99.9% |
NY70 Solar | Generate Capital | Hunt, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Oct 2021 | Dec 2024 | Solar |
Dunkleman Solar | Generate Capital | Cattaraugus, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Dec 2022 | Dec 2024 | Solar |
Finney Solar | Generate Capital | Fort Johnson, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Nov 2021 | Dec 2024 | Solar |
Henrietta Solar | Generate Capital | West Henrietta, NY | New York Independent System Operator (NYIS) | 7.5 GWh | Nov 2021 | Dec 2024 | Solar |
Wildflower Way Solar | Generate Capital | Bath, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Jun 2021 | Dec 2024 | Solar |
Landau II Solar (Hybrid) | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2021 | Dec 2024 | Solar |
Lockenhurst Pond Solar | Generate Capital | Westtown, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Oct 2022 | Dec 2024 | Solar |
New Beginnings Solar | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2019 | Dec 2023 | Solar |
Wheatland 2B Solar | Generate Capital | Scottsville, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Nov 2021 | Dec 2024 | Solar |
Svenski Solar (Hybrid) | Generate Capital | Crawford, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Mar 2022 | Dec 2024 | Solar |
Sangolqui Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Aug 2021 | Dec 2024 | Solar |
Drinkwater Solar | Generate Capital | Saint Johnsville, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
West Creek Solar | Generate Capital | Newark Valley, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
Wheatland 2A Solar | Generate Capital | Scottsville, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2021 | Dec 2024 | Solar |
State Route 14A Solar | Generate Capital | Benton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
Bullitt Farm Solar | Generate Capital | Marcy, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Aug 2023 | Dec 2024 | Solar |
Genesee - CCR Solar | Generate Capital | Hilton, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Nov 2022 | Dec 2024 | Solar |
Davis Solar | Generate Capital | Goshen, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Apr 2023 | Dec 2024 | Solar |
Landau Solar | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2024 | Solar |
Catskill | Generate Capital | Triangle, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 2023 | Dec 2024 | Solar |
Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Dec 2023 | Dec 2024 | Solar |
Eddy | Generate Capital | Williamson, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Sep 2023 | Dec 2024 | Solar |
Janiak | Generate Capital | Port Jervis, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Oct 2023 | Dec 2024 | Solar |
Krumkill Road Solar South, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2024 | Dec 2024 | Solar |
Ridgeway 1 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Oct 2023 | Dec 2024 | Solar |
Rivard 2 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2023 | Dec 2024 | Solar |
County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Apr 2024 | Dec 2024 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Westchester County, NY | # 29 | 31 | 429.1 GWh |
Franklin County, NY | # 28 | 15 | 470.7 GWh |
Onondaga County, NY | # 27 | 36 | 477.1 GWh |
Bronx County, NY | # 26 | 15 | 477.8 GWh |
Jefferson County, NY | # 25 | 38 | 526.4 GWh |
Monroe County, NY | # 24 | 41 | 548.8 GWh |
Yates County, NY | # 23 | 6 | 713.2 GWh |
Chautauqua County, NY | # 22 | 24 | 858.5 GWh |
Wyoming County, NY | # 21 | 15 | 906.6 GWh |
Steuben County, NY | # 20 | 22 | 1.1 TWh |
Clinton County, NY | # 19 | 28 | 1.5 TWh |
Lewis County, NY | # 18 | 28 | 1.8 TWh |
Rockland County, NY | # 17 | 10 | 2.0 TWh |
Richmond County, NY | # 16 | 19 | 2.0 TWh |
Saratoga County, NY | # 15 | 37 | 2.0 TWh |
Kings County, NY | # 14 | 31 | 2.3 TWh |
Nassau County, NY | # 13 | 24 | 2.7 TWh |
New York County, NY | # 12 | 18 | 3.0 TWh |
Rensselaer County, NY | # 11 | 22 | 3.0 TWh |
Dutchess County, NY | # 10 | 21 | 3.9 TWh |
Albany County, NY | # 9 | 30 | 4.0 TWh |
Greene County, NY | # 8 | 13 | 4.1 TWh |
Wayne County, NY | # 7 | 11 | 4.8 TWh |
Orange County, NY | # 6 | 53 | 5.6 TWh |
Suffolk County, NY | # 5 | 67 | 8.2 TWh |
St. Lawrence County, NY | # 4 | 68 | 8.3 TWh |
Queens County, NY | # 3 | 22 | 15.1 TWh |
Niagara County, NY | # 2 | 25 | 15.3 TWh |
Oswego County, NY | # 1 | 33 | 29.2 TWh |