Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Equinix - Elmsford | Bloom Energy | Elmsford, NY | New York Independent System Operator (NYIS) | 14.0 GWh | Aug 2020 | Dec 2025 | Natural Gas |
| Apple Staten Island - Industrial Loop | Bloom Energy | Staten Island, NY | New York Independent System Operator (NYIS) | 40.0 GWh | May 2022 | Dec 2025 | Natural Gas |
| Apple Staten Island - Winant Place | Bloom Energy | Staten Island, NY | New York Independent System Operator (NYIS) | 39.7 GWh | Jul 2022 | Dec 2025 | Natural Gas |
| Dunn Paper | BiOrigin Specialty Products | Gouverneur, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Dec 1958 | Dec 2025 | Water |
| Bayswater Peaking Facility LLC | Bayswater Peaking Facility LLC | Far Rockaway, NY | New York Independent System Operator (NYIS) | 23.7 GWh | May 2002 | Dec 2025 | Natural Gas |
| Ball Hill Wind Energy, LLC | Ball Hill Wind Energy, LLC | Forestville, NY | New York Independent System Operator (NYIS) | 273.5 GWh | Nov 2023 | Aug 2026 | Wind |
| Oneida East | Azimuth 180 Solar Electric, LLC | Holland Patent, NY | New York Independent System Operator (NYIS) | 891.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Collins (NY) (CSG) | Azimuth 180 Solar Electric, LLC | Barneveld, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Orioles Community Solar | Azimuth 180 Solar Electric, LLC | Hannacroix, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Sep 2022 | Dec 2025 | Solar |
| Ontario Sun | Azimuth 180 Solar Electric, LLC | Sandy Creek, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Jan 2023 | Dec 2025 | Solar |
| Avon Solar Farm LLC | Avon Solar Farm LLC | Avon, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Hardscrabble Wind Power LLC | Avangrid Power LLC | Little Falls, NY | New York Independent System Operator (NYIS) | 172.0 GWh | Dec 2010 | Dec 2025 | Wind |
| Roaring Brook, LLC | Avangrid Power LLC | Lowville, NY | New York Independent System Operator (NYIS) | 192.5 GWh | Sep 2021 | Aug 2026 | Wind |
| Narrows Gas Turbines Generating | Astoria Generating Company, L.P. | Brooklyn, NY | New York Independent System Operator (NYIS) | 144.9 GWh | Apr 1972 | Dec 2025 | Natural Gas : 95.2% Distillate Fuel Oil : 4.8% |
| Astoria Generating Station | Astoria Generating Company, L.P. | Astoria, NY | New York Independent System Operator (NYIS) | 1.3 TWh | Feb 1954 | Dec 2025 | Natural Gas : 98.9% Residual Fuel Oil : 1.1% |
| Gowanus Gas Turbines Generating | Astoria Generating Company, L.P. | Brooklyn, NY | New York Independent System Operator (NYIS) | 61.0 GWh | May 1971 | Dec 2025 | Natural Gas : 86.8% Distillate Fuel Oil : 13.2% |
| Astoria Energy | Astoria Energy LLC | New York, NY | New York Independent System Operator (NYIS) | 4.0 TWh | Apr 2006 | Aug 2026 | Natural Gas : 95.5% Distillate Fuel Oil : 4.5% |
| Astoria Energy II | Astoria Energy II LLC | Astoria, NY | New York Independent System Operator (NYIS) | 3.3 TWh | Jun 2011 | Aug 2026 | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
| ASA Volney NY Solar I LLC | ASA Volney NY Solar I LLC | Fulton, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Jun 2023 | Dec 2025 | Solar |
| ASA Gouverneur NY Solar II LLC | ASA Gouverneur NY Solar II LLC | Gouverneur, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Apr 2024 | Dec 2025 | Solar |
| ASA Gouverneur NY Solar I LLC | ASA Gouverneur NY Solar I LLC | Richville, NY | New York Independent System Operator (NYIS) | 2.5 GWh | May 2024 | Dec 2025 | Solar |
| ASA DeKalb NY Solar III LLC | ASA DeKalb NY Solar III LLC | Richville, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Mar 2024 | Dec 2025 | Solar |
| ASA DeKalb NY Solar II LLC | ASA DeKalb NY Solar II LLC | DeKalb, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2023 | Dec 2025 | Solar |
| ASA DeKalb NY Solar I LLC | ASA DeKalb NY Solar I LLC | DeKalb, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Nov 2023 | Dec 2025 | Solar |
| ASA Clayton NY Solar I LLC | ASA Clayton NY Solar I LLC | Clayton, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jun 2024 | Dec 2025 | Solar |
| Arthur Kill Generating Station | Arthur Kill Power, LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 1.5 TWh | Aug 1959 | Aug 2026 | Natural Gas |
| Arkwright Summit Wind Farm LLC | Arkwright Summit Wind Farm LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 239.3 GWh | Jul 2018 | Aug 2026 | Wind |
| SCS Penfield One 010750 Penfield, LLC | Arevon Energy, Inc. | Penfield, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Aug 2022 | Dec 2025 | Solar |
| Fuel Cell 18B Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 32.3 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Fuel Cell 18A Sneden Avenue | Annadale Community Clean Energy Projects LLC | Staten Island, NY | New York Independent System Operator (NYIS) | 28.0 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| Ogdensburg | Ampersand Ogdensburg Hydro, LLC | Ogdensburg, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Nov 1987 | Dec 2025 | Water |
| Longfalls Facility | Ampersand Long Falls Hydro, LLC | West Carthage, NY | New York Independent System Operator (NYIS) | 5.4 GWh | Sep 1991 | Dec 2025 | Water |
| Hollow Dam Power Partnership | Ampersand Hollow Dam Hydro LLC | Gouveneur, NY | New York Independent System Operator (NYIS) | 1.0 GWh | Nov 1987 | Dec 2025 | Water |
| Chasm Hydro Partnership | Ampersand Chasm Hydro LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Feb 1982 | Nov 2025 | Water |
| Amherst Community Solar | Amherst Community Solar LLC | Amherst, NY | New York Independent System Operator (NYIS) | 7.3 GWh | Dec 2022 | Dec 2025 | Solar |
| ELP Saugerties CSG | Altus Power America Management, LLC | Saugerties, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jan 2020 | Dec 2025 | Solar |
| ELP Myer CSG | Altus Power America Management, LLC | Ulster, NY | New York Independent System Operator (NYIS) | 3.5 GWh | May 2021 | Dec 2025 | Solar |
| ELP Kinderhook CSG | Altus Power America Management, LLC | Valatie, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Oct 2020 | Dec 2025 | Solar |
| ELP Greenport CSG | Altus Power America Management, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.6 GWh | May 2020 | Dec 2025 | Solar |
| East Fishkill CSG | Altus Power America Management, LLC | East Fishkill, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Castleton | Altus Power America Management, LLC | Castleton on Hudson, NY | New York Independent System Operator (NYIS) | 8.1 GWh | May 2021 | Dec 2025 | Solar |
| 456 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Sep 2020 | Dec 2025 | Solar |
| Bizer Creek | Altus Power America Management, LLC | Getzville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Mar 2023 | Dec 2025 | Solar |
| Union Vale | Altus Power America Management, LLC | Lagrangeville, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Jul 2021 | Dec 2025 | Solar |
| Ghent (NY) | Altus Power America Management, LLC | Ghent, NY | New York Independent System Operator (NYIS) | 7.9 GWh | May 2021 | Dec 2025 | Solar |
| Stanford | Altus Power America Management, LLC | Stanfordville, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Jul 2021 | Dec 2025 | Solar |
| 100 Lower | Altus Power America Management, LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Apr 2020 | Dec 2025 | Solar |
| Capital Hill Solar LLC | Altus Power America Management, LLC | Albany, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Dec 2021 | Dec 2025 | Solar |
| Solean Solar Project | Altus Power America Management, LLC | Olean, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Mar 2016 | Dec 2025 | Solar |
| Fredonia Solar LLC | Altus Power America Management, LLC | Fredonia, NY | ISO New England (ISNE) | 1.5 GWh | Aug 2021 | Dec 2025 | Solar |
| Pasto Solar | Altus Power America Management, LLC | Spencer, NY | New York Independent System Operator (NYIS) | 25.1 GWh | Sep 2019 | Dec 2025 | Solar |
| Chambers Road Solar | Altus Power America Management, LLC | Big Flats, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Podunk Road CSG | Altus Power America Management, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2019 | Dec 2025 | Solar |
| Hickory Grove #2 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Hickory Grove #1 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Westtown CSG | Altus Power America Management, LLC | Westtown, NY | ISO New England (ISNE) | 3.3 GWh | Apr 2019 | Dec 2025 | Solar |
| Chester CSG | Altus Power America Management, LLC | Chester, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2019 | Dec 2025 | Solar |
| Greenville CSG | Altus Power America Management, LLC | Port Jervis, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2019 | Dec 2025 | Solar |
| Millersport GM 1 | Altus Power America Management, LLC | Amherst, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Feb 2023 | Dec 2025 | Solar |
| Boas Rd #3 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2025 | Solar |
| Boas Rd #2 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2025 | Solar |
| Boas Rd #1 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2019 | Dec 2025 | Solar |
| Ellis Solar | Altus Power America Management, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 27.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Daum Solar | Altus Power America Management, LLC | Rushville, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Dec 2019 | Dec 2025 | Solar |
| Breesport Road Community Solar Farm | Altus Power America Management, LLC | Baldwin, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Sep 2019 | Dec 2025 | Solar |
| Hillburn | Alliance NYGT, LLC | Hillburn, NY | New York Independent System Operator (NYIS) | 701.0 MWh | Jun 1972 | Dec 2025 | Natural Gas |
| Shoemaker | Alliance NYGT, LLC | Middletown, NY | New York Independent System Operator (NYIS) | 639.0 MWh | Jun 1972 | Dec 2025 | Natural Gas |
| Allegany Cogen | Allegany Generating Station, LLC | Fillmore, NY | New York Independent System Operator (NYIS) | 36.8 GWh | May 1994 | Dec 2025 | Natural Gas |
| Albert Einstein College of Medicine | Albert Einstein College of Medicine | Bronx, NY | New York Independent System Operator (NYIS) | 46.0 MWh | Dec 2000 | Dec 2025 | Distillate Fuel Oil |
| Albany Medical Ctr Cogen Plant | Albany Medical Center | Albany, NY | New York Independent System Operator (NYIS) | 29.5 GWh | Feb 2013 | Dec 2025 | Natural Gas |
| Fourth Branch Hydroelectric Facility | Albany Engineering Corporation | Waterford, NY | New York Independent System Operator (NYIS) | 13.0 GWh | Nov 1987 | Dec 2025 | Water |
| Stuyvesant Falls | Albany Engineering Corporation | Stuyvesant, NY | New York Independent System Operator (NYIS) | 13.0 GWh | Nov 2012 | Dec 2025 | Water |
| Green Island Hydroelectric Station | Albany Engineering Corporation | Green Island, NY | New York Independent System Operator (NYIS) | 38.2 GWh | Oct 1922 | Dec 2025 | Water |
| Valley Falls Hydroelectric Facility | Albany Engineering Corporation | Valley Falls, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Jul 1985 | Dec 2025 | Water |
| Fort Miller Hydroelectric Facility | Albany Engineering Corporation | Northumberland, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 1984 | Dec 2025 | Water |
| Mechanicville Hydroelectric Station | Albany Engineering Corporation | Mechanicville, NY | New York Independent System Operator (NYIS) | 18.0 GWh | Apr 2011 | Dec 2025 | Water |
| Calabro Airport North Solar Project | Agilitas Energy, Inc. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Calabro Airport South Solar Project | Agilitas Energy, Inc. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| Holtsville Solar Project | Agilitas Energy, Inc. | Holtsville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2017 | Dec 2025 | Solar |
| Blydenburgh Solar Project | Agilitas Energy, Inc. | Haupaugge, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Lincoln Ave Solar Project | Agilitas Energy, Inc. | Holbrook, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Afton Solar | Afton Solar LLC | Afton, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Jul 2025 | Dec 2025 | Solar |
| State Route 5 | AETS OpCo Holdings LLC | Vernon, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Oct 2023 | Dec 2025 | Solar |
| Richland North | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2024 | Dec 2025 | Solar |
| CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Independence East | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jun 2024 | Dec 2025 | Solar |
| Ellisburg | AETS OpCo Holdings LLC | Adams, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Independence Road (CSG) | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2024 | Dec 2025 | Solar |
| Richland South | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Dec 2025 | Solar |
| RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Allis Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Jun 2020 | Dec 2025 | Solar |
| Mattas Farms | AES Distributed Energy | Amsterdam, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Oct 2018 | Dec 2025 | Solar |
| Beals Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Apr 2020 | Dec 2025 | Solar |
| AES Tonawanda Solar LLC | AES Distributed Energy | Tonawanda, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Dec 2019 | Dec 2025 | Solar |
| South Goshen Community Solar | AES Distributed Energy | Goshen, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Aug 2021 | Dec 2025 | Solar |
| Cedar Creek PV | AES Distributed Energy | Seaford, NY | New York Independent System Operator (NYIS) | 3.0 GWh | May 2017 | Dec 2025 | Solar |
| Sutter Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Sep 2015 | Dec 2025 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Jefferson County, NY | # 29 | 38 | 404.0 GWh |
| Bronx County, NY | # 28 | 26 | 412.7 GWh |
| Franklin County, NY | # 27 | 17 | 426.7 GWh |
| Westchester County, NY | # 26 | 33 | 427.9 GWh |
| Monroe County, NY | # 25 | 42 | 589.4 GWh |
| Onondaga County, NY | # 24 | 47 | 629.6 GWh |
| Yates County, NY | # 23 | 6 | 663.1 GWh |
| Chautauqua County, NY | # 22 | 36 | 890.1 GWh |
| Wyoming County, NY | # 21 | 15 | 1.1 TWh |
| Steuben County, NY | # 20 | 23 | 1.2 TWh |
| Clinton County, NY | # 19 | 26 | 1.6 TWh |
| Lewis County, NY | # 18 | 30 | 1.6 TWh |
| Rockland County, NY | # 17 | 10 | 1.7 TWh |
| Saratoga County, NY | # 16 | 43 | 1.7 TWh |
| Richmond County, NY | # 15 | 21 | 1.7 TWh |
| Kings County, NY | # 14 | 36 | 2.5 TWh |
| Nassau County, NY | # 13 | 24 | 2.6 TWh |
| New York County, NY | # 12 | 19 | 2.8 TWh |
| Greene County, NY | # 11 | 14 | 2.8 TWh |
| Rensselaer County, NY | # 10 | 23 | 3.1 TWh |
| Albany County, NY | # 9 | 33 | 4.1 TWh |
| Wayne County, NY | # 8 | 13 | 4.7 TWh |
| Orange County, NY | # 7 | 60 | 5.5 TWh |
| Dutchess County, NY | # 6 | 22 | 6.9 TWh |
| St. Lawrence County, NY | # 5 | 70 | 8.0 TWh |
| Suffolk County, NY | # 4 | 72 | 9.0 TWh |
| Queens County, NY | # 3 | 27 | 14.8 TWh |
| Niagara County, NY | # 2 | 27 | 15.1 TWh |
| Oswego County, NY | # 1 | 36 | 30.2 TWh |