Directory of Power Plants in Missouri
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Kelso 2 Solar | Kelso 2 Solar, LLC | Scott County, MO | 32.0 GWh | - | Feb 2026 | Solar | |
| Kelso Solar | Kelso Solar, LLC | Scott County, MO | 52.1 GWh | - | Feb 2026 | Solar | |
| Vandalia Renewable Energy Center | Union Electric Co - (MO) | Audrain County, MO | 17.8 GWh | - | Feb 2026 | Solar | |
| New Madrid Solar, LLC | New Madrid Solar, LLC | New Madrid County, MO | 87.5 GWh | - | Feb 2026 | Solar | |
| Black Oak Power Producers | Cube District Energy, LLC | Hartville, MO | Associated Electric Cooperative, Inc. (AECI) | 11.2 GWh | Nov 2014 | Dec 2024 | Landfill Gas |
| Nodaway | Associated Electric Coop, Inc | Conception Junction, MO | Associated Electric Cooperative, Inc. (AECI) | 27.4 GWh | May 1999 | Nov 2024 | Natural Gas |
| Lost Creek Wind Energy Facility | Pattern Operators LP | King City, MO | Associated Electric Cooperative, Inc. (AECI) | 375.4 GWh | Apr 2010 | Feb 2026 | Wind |
| Unionville City of | City of Unionville - (MO) | Unionville, MO | Associated Electric Cooperative, Inc. (AECI) | 1.0 MWh | Dec 1934 | Dec 2024 | Distillate Fuel Oil |
| New Madrid | Associated Electric Coop, Inc | New Madrid, MO | Associated Electric Cooperative, Inc. (AECI) | 6.5 TWh | Sep 1972 | Feb 2026 | Subbituminous Coal : 99.9% |
| Thomas Hill | Associated Electric Coop, Inc | Clifton Hill, MO | Associated Electric Cooperative, Inc. (AECI) | 7.3 TWh | Nov 1966 | Feb 2026 | Subbituminous Coal : 99.9% |
| Clarence Cannon | USCE-St Louis District | Monroe City, MO | Associated Electric Cooperative, Inc. (AECI) | 94.1 GWh | Oct 1984 | Feb 2026 | Water |
| Bluegrass Ridge | Wind Capital Holdings, LLC | King City, MO | Associated Electric Cooperative, Inc. (AECI) | 194.9 GWh | May 2007 | Feb 2026 | Wind |
| Loess Hills | Loess Hills Wind Farm LLC | Rock Port, MO | Associated Electric Cooperative, Inc. (AECI) | 6.5 GWh | Jan 2008 | Feb 2026 | Wind |
| Conception | CR Clearing, LLC | Stanberry, MO | Associated Electric Cooperative, Inc. (AECI) | 179.4 GWh | Mar 2008 | Feb 2026 | Wind |
| Cow Branch | Cow Branch Wind Power, LLC | Tarkio, MO | Associated Electric Cooperative, Inc. (AECI) | 158.1 GWh | Mar 2008 | Feb 2026 | Wind |
| Macon Energy Center | City of Macon - (MO) | Macon, MO | Associated Electric Cooperative, Inc. (AECI) | 80.7 GWh | Apr 2003 | Dec 2024 | Natural Gas |
| Unionville | Associated Electric Coop, Inc | Unionville, MO | Associated Electric Cooperative, Inc. (AECI) | 479.0 MWh | May 1976 | Dec 2024 | Distillate Fuel Oil |
| Shelbina Power #3 | City of Shelbina - (MO) | Shelbina, MO | Associated Electric Cooperative, Inc. (AECI) | 36.0 MWh | Mar 2002 | Dec 2024 | Distillate Fuel Oil |
| Shelbina Power #1 | City of Shelbina - (MO) | Shelbina, MO | Associated Electric Cooperative, Inc. (AECI) | 14.0 MWh | Dec 1980 | Dec 2024 | Distillate Fuel Oil |
| Shelbina Power #2 | City of Shelbina - (MO) | Shelbina, MO | Associated Electric Cooperative, Inc. (AECI) | 58.0 MWh | Mar 1992 | Dec 2024 | Distillate Fuel Oil |
| Holden | Associated Electric Coop, Inc | Holden, MO | Associated Electric Cooperative, Inc. (AECI) | 282.4 GWh | May 2002 | Dec 2024 | Natural Gas : 95.4% Distillate Fuel Oil : 4.6% |
| St Francis Energy Facility | Associated Electric Coop, Inc | Campbell, MO | Associated Electric Cooperative, Inc. (AECI) | 1.7 TWh | Jun 1999 | Dec 2024 | Natural Gas |
| Essex | Associated Electric Coop, Inc | Essex, MO | Associated Electric Cooperative, Inc. (AECI) | 62.6 GWh | May 1999 | Dec 2024 | Natural Gas |
| Niangua | Sho-Me Power Electric Coop | Camdenton, MO | Associated Electric Cooperative, Inc. (AECI) | 542.0 MWh | Oct 1930 | Jul 2024 | Water |
| White Cloud Wind Project, LLC | White Cloud Wind Project, LLC | Tarkio, MO | Associated Electric Cooperative, Inc. (AECI) | 817.2 GWh | Nov 2020 | Feb 2026 | Wind |
| Clear Creek Wind | Clear Creek Wind, LLC | Maryville, MO | Associated Electric Cooperative, Inc. (AECI) | 496.2 GWh | Apr 2020 | Feb 2026 | Wind |
| Fulton (MO) | City of Fulton - (MO) | Fulton, MO | Associated Electric Cooperative, Inc. (AECI) | 161.0 MWh | Aug 1966 | Dec 2024 | Natural Gas |
| Blue Bird Solar, LLC | Blue Bird Solar, LLC | Warrenton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 299.0 GWh | Nov 2024 | Feb 2026 | Solar |
| Envoy Solar, LLC | Birch Creek Power, LLC | Mexico, MO | Midcontinent Independent System Operator, Inc. (MISO) | 107.9 GWh | - | Feb 2026 | Solar |
| Audrain Generating Station | Union Electric Co - (MO) | Vandalia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 146.4 GWh | Jan 2001 | Dec 2024 | Natural Gas |
| Southwestern Bell Telephone | AT&T | St. Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 105.0 MWh | Jan 1992 | Feb 2026 | Distillate Fuel Oil |
| MU Combined Heat and Power Plant | Curators of the University of Missouri | Columbia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 203.4 GWh | Jun 1961 | Feb 2026 | Natural Gas : 76.9% Wood/Wood Waste Solids : 20.5% Bituminous Coal : 2.6% |
| Anheuser-Busch St Louis | Anheuser-Busch Inc | St. Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 40.0 GWh | Dec 1938 | Feb 2026 | Natural Gas : 93.3% Other Biomass Gas : 6.7% |
| Peno Creek | Union Electric Co - (MO) | Bowling Green, MO | Midcontinent Independent System Operator, Inc. (MISO) | 118.5 GWh | Apr 2002 | Dec 2024 | Natural Gas : 97.4% Distillate Fuel Oil : 2.6% |
| Winfield Solar | Winfield Solar I, LLC | Winfield, MO | Midcontinent Independent System Operator, Inc. (MISO) | 218.7 GWh | - | Feb 2026 | Solar |
| Trigen St. Louis | Centerstream STL, LLC | St Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 86.1 GWh | May 1999 | Jul 2025 | Natural Gas |
| Morris Solar | AES Clean Energy | Kirksville, MO | Midcontinent Independent System Operator, Inc. (MISO) | 285.0 GWh | - | Feb 2026 | Solar |
| Huck Finn Renewable Energy Center | Union Electric Co - (MO) | Vandalia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 414.6 GWh | Nov 2024 | Feb 2026 | Solar |
| Adelite Solar, LLC | Birch Creek Development | Hamilton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | - | Feb 2026 | Solar |
| Columbia Energy Center | City of Columbia - (MO) | Columbia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | May 2001 | Dec 2024 | Natural Gas |
| Altona Solar, LLC | Birch Creek Power, LLC | Centralia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 65.4 GWh | Jul 2024 | Feb 2026 | Solar |
| IKEA St. Louis 410 | IKEA Property Inc | St. Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 328.0 MWh | Aug 2015 | Apr 2025 | Solar |
| Cape Girardeau Renewable Energy Center | Union Electric Co - (MO) | Cape Girardeau, MO | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2021 | Dec 2024 | Solar |
| Montgomery County Community Solar Center | Union Electric Co - (MO) | New Florence, MO | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Feb 2022 | Dec 2024 | Solar |
| Truman Solar | Truman Solar, LLC | Colombia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 22.6 GWh | May 2021 | Dec 2024 | Solar |
| Renewable Energy Center at BJH | Union Electric Co - (MO) | St Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 846.0 MWh | Sep 2019 | Dec 2024 | Solar |
| Elm Street Substation Generators | City of Farmington - (MO) | Farmington, MO | Midcontinent Independent System Operator, Inc. (MISO) | 22.0 MWh | Sep 2002 | Dec 2024 | Distillate Fuel Oil |
| Walton Street Substation | City of Farmington - (MO) | Farmington, MO | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Dec 2002 | Dec 2024 | Distillate Fuel Oil |
| Overall Road Station | City of Farmington - (MO) | Farmington, MO | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Feb 2003 | Dec 2024 | Distillate Fuel Oil |
| High Prairie Wind Farm | Union Electric Co - (MO) | Queen City, MO | Midcontinent Independent System Operator, Inc. (MISO) | 674.7 GWh | Nov 2020 | Feb 2026 | Wind |
| Farmers City Wind LLC | Avangrid Power LLC | Tarkio, MO | Midcontinent Independent System Operator, Inc. (MISO) | 246.4 GWh | Mar 2009 | Dec 2024 | Wind |
| Ameresco Jefferson City | AMERESCO Jefferson City LLC | Jefferson City, MO | Midcontinent Independent System Operator, Inc. (MISO) | 19.9 GWh | Feb 2009 | Dec 2024 | Landfill Gas |
| O'Fallon Renewable Energy Center | Union Electric Co - (MO) | O'Fallon, MO | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Nov 2014 | Dec 2024 | Solar |
| Sioux | Union Electric Co - (MO) | West Alton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 TWh | Apr 1967 | Feb 2026 | Subbituminous Coal : 77.4% Bituminous Coal : 22.5% |
| Jackson (MO) | City of Jackson - (MO) | Jackson, MO | Midcontinent Independent System Operator, Inc. (MISO) | 146.0 MWh | Dec 1935 | Dec 2024 | Distillate Fuel Oil : 58.6% Natural Gas : 41.4% |
| Kahoka | City of Kahoka | Kahoka, MO | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 MWh | Dec 1940 | Dec 2024 | Distillate Fuel Oil |
| Callaway | Union Electric Co - (MO) | Fulton, MO | Midcontinent Independent System Operator, Inc. (MISO) | 7.1 TWh | Nov 1984 | Feb 2026 | Nuclear |
| Rush Island | Union Electric Co - (MO) | Festus, MO | Midcontinent Independent System Operator, Inc. (MISO) | 603.1 GWh | Feb 1976 | Sep 2024 | Subbituminous Coal : 98.2% Distillate Fuel Oil : 1.8% |
| Columbia (MO) | City of Columbia - (MO) | Columbia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 21.6 GWh | Dec 1956 | Dec 2024 | Landfill Gas : 63.9% Natural Gas : 36.1% |
| Osage Dam | Union Electric Co - (MO) | Eldon, MO | Midcontinent Independent System Operator, Inc. (MISO) | 497.1 GWh | Sep 1931 | Dec 2024 | Water |
| Labadie | Union Electric Co - (MO) | Labadie, MO | Midcontinent Independent System Operator, Inc. (MISO) | 16.7 TWh | May 1970 | Feb 2026 | Subbituminous Coal |
| Mexico | Union Electric Co - (MO) | Mexico, MO | Midcontinent Independent System Operator, Inc. (MISO) | 767.0 MWh | Aug 1978 | Dec 2024 | Distillate Fuel Oil |
| Moberly | Union Electric Co - (MO) | Moberly, MO | Midcontinent Independent System Operator, Inc. (MISO) | 34.0 MWh | Jul 1978 | Dec 2024 | Distillate Fuel Oil |
| Moreau | Union Electric Co - (MO) | Moreau, MO | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 GWh | Jul 1978 | Dec 2024 | Distillate Fuel Oil |
| Marceline | City of Marceline - (MO) | Marceline, MO | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 MWh | Jul 1989 | Dec 2024 | Distillate Fuel Oil |
| Fairgrounds | Union Electric Co - (MO) | Jefferson City, MO | Midcontinent Independent System Operator, Inc. (MISO) | 136.0 MWh | Jul 1974 | Dec 2024 | Distillate Fuel Oil |
| Lebanon Solar Farm (MO) | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Lebanon, MO | Southwest Power Pool (SWPP) | 4.3 GWh | Aug 2017 | Dec 2024 | Solar |
| West Plains Solar I | Evergy Kansas Central, Inc | West Plains, MO | Southwest Power Pool (SWPP) | 15.6 GWh | Feb 2022 | Dec 2024 | Solar |
| Chillicothe Solar Farm | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Chillicothe, MO | Southwest Power Pool (SWPP) | 4.4 GWh | Jun 2017 | Dec 2024 | Solar |
| Higginsville Solar Farm | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Higginsville, MO | Southwest Power Pool (SWPP) | 4.4 GWh | Oct 2017 | Dec 2024 | Solar |
| Independence Solar Farm | MC Power Companies Inc | Independence, MO | Southwest Power Pool (SWPP) | 4.6 GWh | Feb 2017 | Feb 2026 | Solar |
| Farmington Solar Farm | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Farmington, MO | Southwest Power Pool (SWPP) | 3.3 GWh | Aug 2018 | Dec 2024 | Solar |
| El Dorado Springs Solar Farm | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | El Dorado Springs, MO | Southwest Power Pool (SWPP) | 4.2 GWh | May 2018 | Dec 2024 | Solar |
| Independence II Solar Farm | MC Power Companies Inc | Independence, MO | Southwest Power Pool (SWPP) | 14.4 GWh | May 2018 | Feb 2026 | Solar |
| Marshall Solar Farm (MO) | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Marshall, MO | Southwest Power Pool (SWPP) | 4.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Kings Point Wind Energy Center | Empire District Electric Co | Golden City, MO | Southwest Power Pool (SWPP) | 515.0 GWh | Mar 2021 | Feb 2026 | Wind |
| North Fork Ridge Wind Energy Center | Empire District Electric Co | Mindenmines, MO | Southwest Power Pool (SWPP) | 508.9 GWh | Nov 2020 | Feb 2026 | Wind |
| Waynesville Solar Farm (MO) | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Waynesville, MO | Southwest Power Pool (SWPP) | 4.5 GWh | Jul 2016 | Dec 2024 | Solar |
| Station I | City of Independence - (MO) | Independence, MO | Southwest Power Pool (SWPP) | 3.2 GWh | May 1972 | Dec 2024 | Distillate Fuel Oil |
| Station H | City of Independence - (MO) | Independence, MO | Southwest Power Pool (SWPP) | 15.1 GWh | May 1972 | Dec 2024 | Natural Gas : 93.3% Distillate Fuel Oil : 6.7% |
| Atchison County Wind | Union Electric Co - (MO) | Westboro, MO | Southwest Power Pool (SWPP) | 831.6 GWh | Feb 2021 | Feb 2026 | Wind |
| Prosperity Solar Farm CSG | Empire District Electric Co | Joplin, MO | Southwest Power Pool (SWPP) | 3.9 GWh | Feb 2021 | Dec 2024 | Solar |
| Jackson Square | City of Independence - (MO) | Independence, MO | Southwest Power Pool (SWPP) | 699.0 MWh | May 1969 | Dec 2024 | Distillate Fuel Oil |
| Nixa Solar, LLC | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Nixa, MO | Southwest Power Pool (SWPP) | 15.1 GWh | Oct 2017 | Dec 2024 | Solar |
| Higginsville | City of Higginsville - (MO) | Higginsville, MO | Southwest Power Pool (SWPP) | 6.4 GWh | Dec 1944 | Nov 2024 | Natural Gas : 95.3% Distillate Fuel Oil : 4.7% |
| Hawthorn Solar I | Evergy Metro | Kansas City, MO | Southwest Power Pool (SWPP) | 10.5 GWh | Dec 2022 | Dec 2024 | Solar |
| Chillicothe | Chillicothe Municipal Utils | Chillicothe, MO | Southwest Power Pool (SWPP) | 5.2 GWh | May 1986 | Nov 2024 | Natural Gas : 85.1% Distillate Fuel Oil : 14.9% |
| Butler Municipal Power Plant | City of Butler - (MO) | Butler, MO | Southwest Power Pool (SWPP) | 1.0 MWh | May 1946 | Dec 2024 | Distillate Fuel Oil |
| Lake Road (MO) | Evergy Missouri West | St Joseph, MO | Southwest Power Pool (SWPP) | 54.5 GWh | Jun 1950 | Feb 2026 | Natural Gas : 73.4% Subbituminous Coal : 15.5% Distillate Fuel Oil : 11.2% |
| Ralph Green | Evergy Missouri West | Pleasant Hill, MO | Southwest Power Pool (SWPP) | 49.9 GWh | May 1981 | Dec 2024 | Natural Gas |
| Nevada | Evergy Missouri West | Nevada, MO | Southwest Power Pool (SWPP) | 346.0 MWh | May 1974 | Dec 2024 | Distillate Fuel Oil |
| Northeast (MO) | Evergy Metro | Kansas City, MO | Southwest Power Pool (SWPP) | 27.2 GWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| Hawthorn | Evergy Metro | Kansas City, MO | Southwest Power Pool (SWPP) | 2.9 TWh | Apr 1969 | Feb 2026 | Subbituminous Coal : 79.2% Natural Gas : 20.8% |
| Iatan | Evergy Metro | Weston, MO | Southwest Power Pool (SWPP) | 5.4 TWh | Apr 1980 | Feb 2026 | Subbituminous Coal : 99.0% Distillate Fuel Oil : 1.0% |
| Poplar Bluff Generating Station | City of Poplar Bluff - (MO) | Poplar Bluff, MO | Southwest Power Pool (SWPP) | 560.0 MWh | Apr 1976 | Dec 2024 | Natural Gas : 86.1% Distillate Fuel Oil : 13.9% |
| McCartney | City Utilities of Springfield - (MO) | Strafford, MO | Southwest Power Pool (SWPP) | 111.7 GWh | Jun 2002 | Dec 2024 | Natural Gas |
| Trenton South | Trenton Municipal Utilities - (MO) | Trenton, MO | Southwest Power Pool (SWPP) | 140.0 MWh | Jun 2000 | Dec 2024 | Distillate Fuel Oil |
| State Line Combined Cycle | Empire District Electric Co | Joplin, MO | Southwest Power Pool (SWPP) | 2.5 TWh | Apr 1995 | Feb 2026 | Natural Gas |
| Dogwood Energy Facility | Dogwood Power Management, LLC | Pleasant Hill, MO | Southwest Power Pool (SWPP) | 1.9 TWh | May 2001 | Feb 2026 | Natural Gas |
| Trenton North | Trenton Municipal Utilities - (MO) | Trenton, MO | Southwest Power Pool (SWPP) | 157.0 MWh | May 1974 | Dec 2024 | Distillate Fuel Oil |