Peno Creek
16303 Pike 43, Bowling Green, MO 63334Plant Summary Information
Peno Creek is ranked #38 out of 127 power plants in Missouri in terms of total annual net electricity generation.
Peno Creek is comprised of 4 generators and generated 26.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Peno Creek |
|---|---|
| Utility Name | Union Electric Co - (MO) |
| Location | Pike County, MO |
| Initial Operation Date | May 2002 |
| Last Update | Dec 2025 |
| Annual Generation | 156.0 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #2,902 out of 13,081 Power Plants Nationwide | |
| Ranked #801 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #38 out of 127 Missouri Power Plants | |
| Ranked #8 out of 35 Missouri Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Map of Peno Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Peno Creek.
Monthly Net Generation for Peno Creek
Monthly Plant Fuel Consumption for Peno Creek
Peno Creek Details
| Summary Information | |
|---|---|
| Plant Name | Peno Creek (7964) |
| Plant Address | 16303 Pike 43, Bowling Green, MO 63334 |
| Utility | Union Electric Co - (MO) (19436) |
| Latitude, Longitude | 39.3531, -91.2295 |
| Generation Dates on File | May 2002 to Dec 2025 |
| Initial Operation Date | May 2002 |
| Annual Generation | 156.0 GWh |
| Fuel Types | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PANHANDLE EASTERN PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator GT1 Details Operating May 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | AMMO.PENOCTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PENOCTG1 |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 42 MW |
| Winter Capacity | 53 MW |
| Minimum Load | 38 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 42 MW |
| Net Winter Capacity With Natural Gas | 53 MW |
| Net Summer Capacity With Oil | 42 MW |
| Net Winter Capacity With Oil | 53 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator GT2 Details Operating May 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | AMMO.PENOCTG2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PENOCTG2 |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 42 MW |
| Winter Capacity | 53 MW |
| Minimum Load | 38 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 42 MW |
| Net Winter Capacity With Natural Gas | 53 MW |
| Net Summer Capacity With Oil | 42 MW |
| Net Winter Capacity With Oil | 53 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator GT3 Details Operating May 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | AMMO.PENOCTG3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PENOCTG3 |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 42 MW |
| Winter Capacity | 53 MW |
| Minimum Load | 38 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 42 MW |
| Net Winter Capacity With Natural Gas | 53 MW |
| Net Summer Capacity With Oil | 42 MW |
| Net Winter Capacity With Oil | 53 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Generator GT4 Details Operating May 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | AMMO.PENOCTG4 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMOCTG4 |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 42 MW |
| Winter Capacity | 53 MW |
| Minimum Load | 38 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 42 MW |
| Net Winter Capacity With Natural Gas | 53 MW |
| Net Summer Capacity With Oil | 42 MW |
| Net Winter Capacity With Oil | 53 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
Peno Creek Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #791 | Fernandina Beach Mill | Fernandina Beach, FL | 570.3 GWh |
| #792 | Mooreland | Mooreland, OK | 160.2 GWh |
| #793 | Ashtabula | Ashtabula, OH | 159.0 GWh |
| #794 | THUMS | Long Beach, CA | 158.2 GWh |
| #795 | Celanese Acetate LLC | Narrows, VA | 157.8 GWh |
| #796 | Big Cajun 1 | Jarreau, LA | 157.5 GWh |
| #797 | New Orleans Power | New Orleans, LA | 157.4 GWh |
| #798 | Larsen Memorial | Lakeland, FL | 159.2 GWh |
| #799 | Toray Plastic America's CHP Plant | North Kingstown, RI | 156.8 GWh |
| #800 | Pleasant Valley (MN) | Dexter, MN | 156.8 GWh |
| #802 | Cass County | Plattsmouth, NE | 154.7 GWh |
| #803 | MU Combined Heat and Power Plant | Columbia, MO | 200.1 GWh |
| #804 | AL Sandersville LLC | Warthen, GA | 154.3 GWh |
| #805 | PPS Power Plant No 1 | Paducah, KY | 153.5 GWh |
| #806 | Wheatland Generating Facility | Wheatland, IN | 153.3 GWh |
| #807 | Los Angeles Refinery Wilmington | Wilmington, CA | 365.4 GWh |
| #808 | University Park South | University Park, IL | 151.4 GWh |
| #809 | Oxnard Paper Mill | Oxnard, CA | 150.5 GWh |
| #810 | Enterprise Products Operating | Mont Belvieu, TX | 150.1 GWh |
| #811 | Seminole Mill | Jacksonville, FL | 150.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Peno Creek.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alsey | Alsey, IL | 34.7 GWh | 44.9 mi |
| Audrain Generating Station | Vandalia, MO | 402.8 GWh | 16.7 mi |
| Blue Bird Solar, LLC | Warrenton, MO | 320.2 GWh | 32 mi |
| Bowling Green Renewable Energy Center | MO | 10.6 GWh | 0.5 mi |
| Clarence Cannon | Monroe City, MO | 118.9 GWh | 25.1 mi |
| Envoy Solar, LLC | Mexico, MO | 108.9 GWh | 35.8 mi |
| Huck Finn Renewable Energy Center | Vandalia, MO | 427.6 GWh | 17 mi |
| JM Huber at Quincy | Quincy, IL | 2.1 GWh | 36.1 mi |
| Mexico | Mexico, MO | 2.5 GWh | 35.1 mi |
| MJMEUC Generating Station #1 | Laddonia, MO | 90.1 GWh | 23.1 mi |
| Montgomery County Community Solar Center | New Florence, MO | 6.6 GWh | 33.6 mi |
| Morgan Solar 1 CSG | Meredosia, IL | 4.0 GWh | 48.4 mi |
| Morgan Solar 1b CSG | Meredosia, IL | 3.5 GWh | 48.4 mi |
| O'Fallon Renewable Energy Center | O'Fallon, MO | 1.1 GWh | 46.9 mi |
| Panther Creek Wind Project | Pittsfield, IL | 149.8 GWh | 26.4 mi |
| Pearl Station | Pearl, IL | 64.0 MWh | 33.5 mi |
| Pike County Wind Power | Pittsfield, IL | 334.0 MWh | 27.5 mi |
| Split Rail Solar Energy LLC | Warrenton, MO | 102.2 GWh | 31.2 mi |
| Vandalia Renewable Energy Center | Vandalia, MO | 46.5 GWh | 15.9 mi |
| Winfield Solar | Winfield, MO | 281.2 GWh | 30.5 mi |