Trigen St. Louis
One Ashley Place, St Louis, MO 63102Plant Summary Information
Trigen St. Louis is ranked #43 out of 122 power plants in Missouri in terms of total annual net electricity generation.
Trigen St. Louis is comprised of 6 generators and generated 20.2 GWh during the 3-month period between April 2025 to July 2025.
| Plant Name | Trigen St. Louis |
|---|---|
| Utility Name | Centerstream STL, LLC |
| Location | St. Louis County, MO |
| Initial Operation Date | June 1999 |
| Last Update | Jul 2025 |
| Annual Generation | 86.1 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #3,550 out of 12,539 Power Plants Nationwide | |
| Ranked #939 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #43 out of 122 Missouri Power Plants | |
| Ranked #14 out of 35 Missouri Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operators |
Trigen St Louis Energy Corporation (2013 to 2015) Ashley Energy LLC (2016 to 2023) Centerstream STL, LLC (2024 to 2024) |
Map of Trigen St. Louis
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trigen St. Louis.
Monthly Net Generation for Trigen St. Louis
Trigen St. Louis Details
| Summary Information | |
|---|---|
| Plant Name | Trigen St. Louis (56309) |
| Plant Address | One Ashley Place, St Louis, MO 63102 |
| Utility | Centerstream STL, LLC (50130) |
| Latitude, Longitude | 38.6359, -90.1809 |
| Generation Dates on File | Jan 2004 to Jul 2025 |
| Initial Operation Date | June 1999 |
| Annual Generation | 86.1 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 99-83-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP CHP (3) |
| Water Source | Mississippi River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | MISSISSIPPI RIVER TRANSMISSION CORP |
| Natural Gas Storage | No |
Generator IC-1 Details Operating June 1999
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP CHP (3) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator ST-4 Details Operating June 1999
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | AMMO.TRIGCTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.TRIGCTG1 |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST-5 Details Operating June 1999
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | AMMO.TRIGCTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.TRIGCTG1 |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CT-1 Details Operating July 1999
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Single Shaft |
| Unit Code | G401 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | AMMO.TRIGCTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.TRIGCTG1 |
| Nameplate Capacity | 5.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 5.5 MW |
| Winter Capacity | 6.2 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1999 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator CT-2 Details Operating July 1999
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Single Shaft |
| Unit Code | G401 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | AMMO.TRIGCTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.TRIGCTG1 |
| Nameplate Capacity | 5.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 5.5 MW |
| Winter Capacity | 6.2 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1999 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator ST-3 Details Operating June 2000
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | G401 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | AMMO.TRIGCTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.TRIGCTG1 |
| Nameplate Capacity | 18.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18.2 MW |
| Winter Capacity | 18.2 MW |
| Minimum Load | 1.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2000 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Trigen St. Louis Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #929 | Delray | Detroit, MI | 91.1 GWh |
| #930 | Tenaska Georgia Generation Facility | Franklin, GA | 94.0 GWh |
| #931 | Pea Ridge | Pace, FL | 88.2 GWh |
| #932 | University of Notre Dame | Notre Dame, IN | 88.5 GWh |
| #933 | Wallingford Energy | Wallingford, CT | 87.8 GWh |
| #934 | Centrahoma East | Centrahoma, OK | 87.0 GWh |
| #935 | Castleton Energy Center | Castleton, NY | 87.1 GWh |
| #936 | MJMEUC Generating Station #1 | Laddonia, MO | 86.7 GWh |
| #937 | John Twitty Energy Center | Springfield, MO | 2.1 TWh |
| #938 | Black Mountain Generating Station | Golden Valley, AZ | 86.4 GWh |
| #940 | Weston RICE | Kronenwetter, WI | 85.5 GWh |
| #941 | Pleasant Valley (MN) | Dexter, MN | 85.9 GWh |
| #942 | Dan E Karn | Essexville, MI | 91.0 GWh |
| #943 | Handsome Lake Energy LLC | Kennerdell, PA | 84.2 GWh |
| #944 | Lawrence Energy Center | Lawrence, KS | 909.0 GWh |
| #945 | WFEC GenCo LLC | Anadarko, OK | 83.7 GWh |
| #946 | Ashdown | Ashdown, AR | 571.8 GWh |
| #947 | NASA Johnson Space Center CHP | Houston, TX | 82.7 GWh |
| #948 | Packaging Corp. of America Jackson Mill | Jackson, AL | 223.3 GWh |
| #949 | Pratt & Whitney | East Hartford, CT | 81.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Trigen St. Louis.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Belleville Solar LLC | Belleville, IL | 12.9 GWh | 13.7 mi |
| Anheuser-Busch St Louis | St. Louis, MO | 42.3 GWh | 3.1 mi |
| Edwardsville Solar II | Edwardsville, IL | 4.2 GWh | 15.8 mi |
| Freeburg | Freeburg, IL | 122.0 MWh | 20.5 mi |
| Granite City Works | Granite City, IL | 437.8 GWh | 5.1 mi |
| Highland | Highland, IL | 187.0 MWh | 27.7 mi |
| IKEA St. Louis 410 | St. Louis, MO | 328.0 MWh | 3.5 mi |
| Milam Gas Recovery | East St. Lois, IL | 19.4 GWh | 3.1 mi |
| Mulberry Solar, LLC | Granite City, IL | 2.1 GWh | 6.9 mi |
| O'Fallon Renewable Energy Center | O'Fallon, MO | 2.3 GWh | 29.9 mi |
| Red Bud | Red Bud, IL | 121.0 MWh | 30.6 mi |
| Renewable Energy Center at BJH | St Louis, MO | 846.0 MWh | 4.2 mi |
| SCS American Bottoms 009885 Sauget, LLC | Sauget, IL | 2.5 GWh | 3.1 mi |
| Sioux | West Alton, MO | 4.1 TWh | 20.2 mi |
| Southwestern Bell Telephone | St. Louis, MO | 116.0 MWh | 0.9 mi |
| St. Clair Solar 3 | Washington Park, IL | 158.0 MWh | 5.1 mi |
| Trenton East | Trenton, IL | 1.7 GWh | 26.7 mi |
| Trenton West | Trenton, IL | 2.2 GWh | 26.2 mi |
| Venice | Venice, IL | 26.8 GWh | 2 mi |
| Waterloo | Waterloo, IL | 491.0 MWh | 20.8 mi |