Lake Road (MO)
1413 Lower Lake Rd, St Joseph, MO 64504Plant Summary Information
Lake Road (MO) is ranked #20 out of 35 natural gas power plants in Missouri in terms of total annual net electricity generation.
Lake Road (MO) is comprised of 7 generators and generated 28.4 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Lake Road (MO) |
|---|---|
| Utility Name | Evergy Missouri West |
| Location | Buchanan County, MO |
| Initial Operation Date | July 1950 |
| Last Update | Sep 2025 |
| Annual Generation | 53.1 GWh |
| Annual Consumption | 5.0 M MMBtu |
| Ranked #4,021 out of 12,539 Power Plants Nationwide | |
| Ranked #1,130 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #51 out of 122 Missouri Power Plants | |
| Ranked #20 out of 35 Missouri Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 81.0% Subbituminous Coal : 15.2% Distillate Fuel Oil : 3.8% |
| Previous Operator |
KCP&L Greater Missouri Operations Co (2013 to 2018) Evergy Missouri West (2019 to 2024) |
Map of Lake Road (MO)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lake Road (MO).
Monthly Net Generation for Lake Road (MO)
Lake Road (MO) Details
| Summary Information | |
|---|---|
| Plant Name | Lake Road (MO) (2098) |
| Plant Address | 1413 Lower Lake Rd, St Joseph, MO 64504 |
| Utility | Evergy Missouri West (12698) |
| Latitude, Longitude | 39.7246, -94.8773 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | July 1950 |
| Annual Generation | 53.1 GWh |
| Fuel Types | Natural Gas : 81.0% Subbituminous Coal : 15.2% Distillate Fuel Oil : 3.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Missouri River |
| Ash Impoundment | Yes Lined Operating |
| Transmission / Distribution Owner | Kansas City Power & Light Co (10000) MO |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | MISSOURI GAS ENERGY |
| Natural Gas Storage | No |
Generator 1 Details Operating July 1950
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN1 |
| Nameplate Capacity | 23 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 18.35 MW |
| Winter Capacity | 18.35 MW |
| Minimum Load | 6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1950 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Subbituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating August 1958
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN2 |
| Nameplate Capacity | 25 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 22.9 MW |
| Winter Capacity | 22.9 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1958 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Subbituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating June 1962
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN3 |
| Nameplate Capacity | 12.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 7.34 MW |
| Winter Capacity | 7.34 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1962 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Subbituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating August 1966
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN4 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN4 |
| Nameplate Capacity | 90 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 94.6 MW |
| Winter Capacity | 94.6 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1966 |
|---|---|
| Planned Retirement | December 2030 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating March 1974
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN5 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN5 |
| Nameplate Capacity | 85 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 65 MW |
| Winter Capacity | 68.3 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating May 1989
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN6 |
| Nameplate Capacity | 24 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 20 MW |
| Winter Capacity | 22.6 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 1989 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating December 1990
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MPSLAKE-RDUN7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MPSLAKE-RDUN7 |
| Nameplate Capacity | 18.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 21.1 MW |
| Winter Capacity | 21.1 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 1990 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Lake Road (MO) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1120 | Barrow | Barrow, AK | 45.9 GWh |
| #1121 | NYU LANGONE HEALTH | New York, NY | 46.1 GWh |
| #1122 | Feather River Energy Center | Yuba City, CA | 45.7 GWh |
| #1123 | St Francisville Mill | St. Francisville, LA | 110.3 GWh |
| #1124 | Orbit Bloom Fuel Cell | Medford, NY | 45.6 GWh |
| #1125 | Mariposa Energy Project | Byron, CA | 45.4 GWh |
| #1126 | Warrick | Newburgh, IN | 3.1 TWh |
| #1127 | Wolf Run Energy | Wilmot Township, PA | 44.9 GWh |
| #1128 | Gilroy Power Plant | Gilroy, CA | 44.2 GWh |
| #1129 | DeBary | DeBary, FL | 50.1 GWh |
| #1131 | Fort Dodge | Dodge City, KS | 44.1 GWh |
| #1132 | Florida's Natural Growers | Lake Wales, FL | 44.0 GWh |
| #1133 | Bristol Myers Squibb Lawrenceville | Lawrenceville, NJ | 44.2 GWh |
| #1134 | Waterbury Generation | Waterbury, CT | 43.8 GWh |
| #1135 | West Marinette 34 | Peshtigo, WI | 43.6 GWh |
| #1136 | Naval Sub Base New London Fuel Cell | Groton, CT | 43.6 GWh |
| #1137 | Otter Creek Ethanol Poet - Ashton | Ashton, IA | 43.5 GWh |
| #1138 | Taft 26C Cogen | Taft, CA | 43.4 GWh |
| #1139 | Port Allen (LA) | Port Allen, LA | 43.4 GWh |
| #1140 | Ormond Beach | Oxnard, CA | 43.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lake Road (MO).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bluegrass Ridge | King City, MO | 179.8 GWh | 33.2 mi |
| BPU Solar Farm | Kansas City, KS | 1.8 GWh | 39.7 mi |
| Clear Creek Wind | Maryville, MO | 437.6 GWh | 44.6 mi |
| Conception | Stanberry, MO | 182.7 GWh | 38.4 mi |
| Falls City | Falls City, NE | 456.0 MWh | 45 mi |
| Grand Ave Plant | Kansas City, MO | 39.5 GWh | 45.2 mi |
| Hawthorn | Kansas City, MO | 2.8 TWh | 46.2 mi |
| Hawthorn Solar I | Kansas City, MO | 10.5 GWh | 45.8 mi |
| Holton | City of Holton, KS | 816.0 MWh | 48.7 mi |
| Iatan | Weston, MO | 5.3 TWh | 19.9 mi |
| Lost Creek Wind Energy Facility | King City, MO | 385.8 GWh | 26 mi |
| Nearman Creek | Kansas, KS | 1.3 TWh | 39.6 mi |
| Nodaway | Conception Junction, MO | 27.4 GWh | 39.2 mi |
| Northeast (MO) | Kansas City, MO | 27.2 GWh | 44.9 mi |
| Osborn Wind Energy | Stewartsville, MO | 680.9 GWh | 21.5 mi |
| Oskaloosa | Oskaloosa, KS | 2.4 GWh | 46.6 mi |
| Quindaro | Kansas, KS | 10.4 GWh | 41.8 mi |
| Rock Creek Wind Project | Tarkio, MO | 1.0 TWh | 49.7 mi |
| St Joseph Landfill Generating Station | St Joseph, MO | 9.6 GWh | 6.4 mi |
| White Cloud Wind Project, LLC | Tarkio, MO | 832.2 GWh | 37 mi |