Directory of Power Plants in Florida
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Cedar Trail | Florida Power & Light Co | Glen St Mary, FL | Florida Power & Light Co. (FPL) | 160.1 GWh | Oct 2024 | Sep 2025 | Solar |
| Egret Solar Center | Florida Power & Light Co | Glen St. Mary, FL | Florida Power & Light Co. (FPL) | 127.1 GWh | Nov 2020 | Sep 2025 | Solar |
| Northern Preserve Solar | Florida Power & Light Co | Glen St. Mary, FL | Florida Power & Light Co. (FPL) | 116.5 GWh | Dec 2019 | Sep 2025 | Solar |
| Anhinga Solar Energy Center | Florida Power & Light Co | Green Cove Springs, FL | Florida Power & Light Co. (FPL) | 128.2 GWh | Dec 2022 | Sep 2025 | Solar |
| Terrill Creek | Florida Power & Light Co | Green Cove Springs, FL | Florida Power & Light Co. (FPL) | 162.5 GWh | Dec 2023 | Sep 2025 | Solar |
| Magnolia Springs Solar Center | Florida Power & Light Co | Green Cove Springs, FL | Florida Power & Light Co. (FPL) | 118.6 GWh | Feb 2021 | Sep 2025 | Solar |
| Horizon Solar Energy Center | Florida Power & Light Co | Hawthorne, FL | Florida Power & Light Co. (FPL) | 125.7 GWh | Dec 2017 | Sep 2025 | Solar |
| High Springs Solar Power Plant | Duke Energy Florida, LLC | High Springs, FL | Duke Energy Florida, Inc. (FPC) | 162.5 GWh | Mar 2023 | Sep 2025 | Solar |
| County Line Renewable Energy Center | Duke Energy Florida, LLC | High Springs, FL | Duke Energy Florida, Inc. (FPC) | 186.9 GWh | Jul 2024 | Sep 2025 | Solar |
| Anclote | Duke Energy Florida, LLC | Holiday, FL | Duke Energy Florida, Inc. (FPC) | 2.1 TWh | Sep 1974 | Sep 2025 | Natural Gas |
| Canoe | Florida Power & Light Co | Holt, FL | Florida Power & Light Co. (FPL) | 145.6 GWh | Dec 2023 | Sep 2025 | Solar |
| Turkey Point | Florida Power & Light Co | Homestead, FL | Florida Power & Light Co. (FPL) | 19.7 TWh | Mar 1967 | Sep 2025 | Nuclear : 67.7% Natural Gas : 32.3% |
| Everglades Solar Energy Center | Florida Power & Light Co | Homestead, FL | Florida Power & Light Co. (FPL) | 139.8 GWh | Dec 2022 | Sep 2025 | Solar |
| Immokalee | Florida Power & Light Co | Immokalee, FL | Florida Power & Light Co. (FPL) | 153.7 GWh | Dec 2021 | Sep 2025 | Solar |
| Martin | Florida Power & Light Co | Indiantown, FL | Florida Power & Light Co. (FPL) | 8.2 TWh | Nov 1980 | Sep 2025 | Natural Gas |
| Cane Island | Kissimmee Utility Authority | Intercession City, FL | Florida Municipal Power Pool (FMPP) | 4.0 TWh | Oct 1994 | Sep 2025 | Natural Gas |
| Intercession City | Duke Energy Florida, LLC | Intercession City, FL | Duke Energy Florida, Inc. (FPC) | 239.2 GWh | Apr 1974 | Sep 2025 | Natural Gas : 93.2% Distillate Fuel Oil : 6.8% |
| Twin Lakes | Florida Power & Light Co | Interlachen, FL | Florida Power & Light Co. (FPL) | 117.8 GWh | Dec 2019 | Sep 2025 | Solar |
| Baptist Medical Center | Baptist Memorial Hospital | Jacksonville, FL | JEA (JEA) | 19.1 GWh | Nov 1983 | Sep 2025 | Natural Gas |
| J D Kennedy | JEA | Jacksonville, FL | JEA (JEA) | 179.8 GWh | May 2000 | Dec 2024 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Northside Generating Station | JEA | Jacksonville, FL | JEA (JEA) | 2.6 TWh | Feb 1966 | Sep 2025 | Natural Gas : 50.1% Petroleum Coke : 36.6% Bituminous Coal : 11.7% Wood/Wood Waste Solids : 1.2% |
| Starratt Solar | C2 Starratt Solar LLC | Jacksonville, FL | JEA (JEA) | 7.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Hecate Energy Blair Road LLC | Hecate Energy Blair Road LLC | Jacksonville, FL | JEA (JEA) | 5.8 GWh | Dec 2017 | Dec 2024 | Solar |
| Seminole Mill | WestRock Seminole | Jacksonville, FL | JEA (JEA) | 138.7 GWh | Jan 1957 | Dec 2024 | Natural Gas |
| Greenland Energy Center | JEA | Jacksonville, FL | JEA (JEA) | 770.9 GWh | May 2011 | Dec 2024 | Natural Gas : 99.9% |
| Old Plank Road Solar Farm, LLC | Southeastern Solar Farm Fund, LLC | Jacksonville, FL | JEA (JEA) | 5.5 GWh | Sep 2017 | Dec 2024 | Solar |
| Anheuser-Busch Jacksonville | Anheuser-Busch Inc | Jacksonville, FL | JEA (JEA) | 73.4 GWh | Oct 1987 | Dec 2024 | Natural Gas |
| IKEA Jacksonville Rooftop PV System | IKEA Property Inc | Jacksonville, FL | JEA (JEA) | 2.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Jax LNG | Jax LNG | Jacksonville, FL | JEA (JEA) | 36.6 GWh | Sep 2018 | Dec 2024 | Natural Gas |
| Jacksonville Solar | Jacksonville Solar LLC | Jacksonville, FL | JEA (JEA) | 11.8 GWh | Mar 2010 | Dec 2024 | Solar |
| Hamilton Solar Power Plant | Duke Energy Florida, LLC | Jasper, FL | Duke Energy Florida, Inc. (FPC) | 180.2 GWh | Nov 2018 | Sep 2025 | Solar |
| Twin Rivers Solar Power Plant | Duke Energy Florida, LLC | Jasper, FL | Duke Energy Florida, Inc. (FPC) | 166.2 GWh | Feb 2021 | Sep 2025 | Solar |
| St Lucie | Florida Power & Light Co | Jensen Beach, FL | Florida Power & Light Co. (FPL) | 16.6 TWh | Apr 1976 | Sep 2025 | Nuclear |
| Imeson Solar | Imeson Solar Farm LLC | Jscksonville, FL | JEA (JEA) | 8.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Osceola Solar Facility | Duke Energy Florida, LLC | Kenansville, FL | Duke Energy Florida, Inc. (FPC) | 4.1 GWh | Feb 2016 | Dec 2024 | Solar |
| Harmony Florida Solar II | Harmony Florida Solar II, LLC | Kissimmee, FL | Duke Energy Florida, Inc. (FPC) | 158.0 GWh | Nov 2024 | Sep 2025 | Solar |
| Hammock Solar | Florida Power & Light Co | Labelle, FL | Florida Power & Light Co. (FPL) | 137.1 GWh | Feb 2018 | Sep 2025 | Solar |
| Union Springs Solar Center | Florida Power & Light Co | Lake Butler, FL | Florida Power & Light Co. (FPL) | 146.3 GWh | Nov 2020 | Sep 2025 | Solar |
| Sunshine Gateway Solar Energy Center | Florida Power & Light Co | Lake City, FL | Florida Power & Light Co. (FPL) | 136.0 GWh | Dec 2018 | Sep 2025 | Solar |
| Lake Placid Solar Power Plant | Duke Energy Florida, LLC | Lake Placid, FL | Duke Energy Florida, Inc. (FPC) | 57.7 GWh | Nov 2019 | Sep 2025 | Solar |
| Lake Mabel Solar and Battery Storage | Tampa Electric Co | Lake Wales, FL | Tampa Electric Company (TEC) | 126.0 GWh | Nov 2023 | Sep 2025 | Solar |
| Florida's Natural Growers | Citrus World Inc | Lake Wales, FL | Duke Energy Florida, Inc. (FPC) | 44.0 GWh | Nov 1989 | Dec 2024 | Natural Gas |
| Winston | City of Lakeland - (FL) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 39.0 MWh | Nov 2001 | Dec 2024 | Distillate Fuel Oil |
| C D McIntosh Jr | City of Lakeland - (FL) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 1.7 TWh | Dec 1969 | Sep 2025 | Natural Gas : 99.9% |
| Larsen Memorial | City of Lakeland - (FL) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 298.1 GWh | Mar 1956 | Dec 2024 | Natural Gas |
| Goldfinch | Goldfinch (Lakeland) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 4.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Lakeland Electric Co. (FL) - Airport II | Sun E N7 Holdings LLC | Lakeland, FL | Tampa Electric Company (TEC) | 2.2 GWh | Aug 2012 | Dec 2024 | Solar |
| LKL BLBD, LLC | LKL BLBD, LLC | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 8.9 GWh | Jul 2015 | Dec 2024 | Solar |
| Lakeland Electric Co. (FL)-Airport 1 | SunE W12DG-B, LLC | Lakeland, FL | Tampa Electric Company (TEC) | 2.4 GWh | Nov 2011 | Dec 2024 | Solar |
| Sundance Renewable Energy Center | Duke Energy Florida, LLC | Lee, FL | Duke Energy Florida, Inc. (FPC) | 50.1 GWh | - | Sep 2025 | Solar |
| Winquepin Renewable Energy Center | Duke Energy Florida, LLC | Lee, FL | Duke Energy Florida, Inc. (FPC) | 157.6 GWh | Feb 2024 | Sep 2025 | Solar |
| Cutrale Citrus Juices USA I | Cutrale Citrus Juices USA Inc | Leesburg, FL | Duke Energy Florida, Inc. (FPC) | 10.9 GWh | Nov 2010 | Dec 2024 | Natural Gas |
| Lithia Solar | Tampa Electric Co | Lithia, FL | Tampa Electric Company (TEC) | 136.9 GWh | Dec 2018 | Sep 2025 | Solar |
| Echo River Solar | Florida Power & Light Co | Live Oak, FL | Florida Power & Light Co. (FPL) | 153.5 GWh | Mar 2020 | Sep 2025 | Solar |
| Suwannee River | Duke Energy Florida, LLC | Live Oak, FL | Duke Energy Florida, Inc. (FPC) | 76.0 GWh | Oct 1953 | Dec 2024 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Suwannee Solar Facility | Duke Energy Florida, LLC | Live Oak, FL | Duke Energy Florida, Inc. (FPC) | 16.2 GWh | Oct 2017 | Dec 2024 | Solar |
| Falmouth Renewable Energy Center | Duke Energy Florida, LLC | Live Oak, FL | Duke Energy Florida, Inc. (FPC) | 179.7 GWh | May 2024 | Sep 2025 | Solar |
| Sabal Palm Solar Center | Florida Power & Light Co | Loxahatchee, FL | Florida Power & Light Co. (FPL) | 154.2 GWh | Mar 2021 | Sep 2025 | Solar |
| West County Energy Center | Florida Power & Light Co | Loxahatchee, FL | Florida Power & Light Co. (FPL) | 18.1 TWh | Jul 2009 | Sep 2025 | Natural Gas : 99.9% |
| Marathon Generating Plant | Florida Keys El Coop Assn, Inc | Marathon, FL | Florida Power & Light Co. (FPL) | 46.1 MWh | Dec 1957 | Dec 2024 | Distillate Fuel Oil |
| Blue Springs | Florida Power & Light Co | Marianna, FL | Florida Power & Light Co. (FPL) | 129.7 GWh | Nov 2021 | Sep 2025 | Solar |
| Apalachee | Florida Power & Light Co | Marianna, FL | Florida Power & Light Co. (FPL) | 143.8 GWh | Dec 2022 | Sep 2025 | Solar |
| Cotton Creek Solar Energy Center | Florida Power & Light Co | McDavid, FL | Florida Power & Light Co. (FPL) | 126.1 GWh | Nov 2021 | Sep 2025 | Solar |
| First City Solar Energy Center | Florida Power & Light Co | McDavid, FL | Florida Power & Light Co. (FPL) | 129.2 GWh | Dec 2022 | Sep 2025 | Solar |
| Discovery Solar Center | Florida Power & Light Co | Merrit Island, FL | Florida Power & Light Co. (FPL) | 137.0 GWh | Apr 2021 | Sep 2025 | Solar |
| Space Coast Next Gen Solar Energy | Florida Power & Light Co | Merritt Island, FL | Florida Power & Light Co. (FPL) | 8.6 GWh | Mar 2010 | Dec 2024 | Solar |
| South District Wastewater Treatment Plt | Miami Dade Water & Sewer Dept | Miami, FL | Florida Power & Light Co. (FPL) | 20.6 GWh | Feb 1991 | Sep 2025 | Natural Gas : 57.3% Other Biomass Gas : 42.7% |
| FIU Solar | Florida Power & Light Co | Miami, FL | Florida Power & Light Co. (FPL) | 771.0 MWh | Apr 2016 | Dec 2024 | Solar |
| Miami Dade Solar Energy Center | Florida Power & Light Co | Miami, FL | Florida Power & Light Co. (FPL) | 129.9 GWh | Dec 2018 | Sep 2025 | Solar |
| IKEA Miami 327 | IKEA Property Inc | Miami, FL | Florida Power & Light Co. (FPL) | 1.6 GWh | Aug 2015 | Dec 2024 | Solar |
| Blackwater River Solar Energy Center | Florida Power & Light Co | Milton, FL | Florida Power & Light Co. (FPL) | 143.4 GWh | Dec 2022 | Sep 2025 | Solar |
| Sparkleberry | Florida Power & Light Co | Molino, FL | Florida Power & Light Co. (FPL) | 165.7 GWh | Feb 2024 | Sep 2025 | Solar |
| Mount Dora Solar Farm F | Green Street Power Partners | Mount Dora, FL | Duke Energy Florida, Inc. (FPC) | 4.6 GWh | Feb 2023 | Dec 2024 | Solar |
| Mount Dora Solar Farm W | Green Street Power Partners | Mount Dora, FL | Duke Energy Florida, Inc. (FPC) | 3.6 GWh | Feb 2023 | Dec 2024 | Solar |
| Polk | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 5.5 TWh | Aug 1996 | Sep 2025 | Natural Gas : 99.7% |
| Mosaic New Wales Operations | Mosaic Fertilizer LLC | Mulberry, FL | Tampa Electric Company (TEC) | 345.8 GWh | Jul 1981 | Sep 2025 | Waste Heat |
| Alafia Solar | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 110.9 GWh | Nov 2023 | Sep 2025 | Solar |
| Durrance | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 29.8 GWh | Dec 2020 | Sep 2025 | Solar |
| Mosaic South Pierce Operations | Mosaic Fertilizer LLC | Mulberry, FL | Tampa Electric Company (TEC) | 87.1 GWh | Dec 1977 | Sep 2025 | Waste Heat |
| Magnolia Solar | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 141.1 GWh | Nov 2021 | Sep 2025 | Solar |
| Jamison Solar (FL) | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 137.5 GWh | Mar 2022 | Sep 2025 | Solar |
| Sambucus | Florida Power & Light Co | Myakka City, FL | Florida Power & Light Co. (FPL) | 164.1 GWh | Feb 2024 | Sep 2025 | Solar |
| Willow Solar Energy Center | Florida Power & Light Co | Myakka City, FL | Florida Power & Light Co. (FPL) | 152.7 GWh | Apr 2021 | Sep 2025 | Solar |
| Waste Management Naples LFGTE Project | WM Renewable Energy LLC | Naples, FL | Florida Power & Light Co. (FPL) | 23.4 GWh | Apr 2011 | Dec 2024 | Landfill Gas |
| Gulf Coast Solar Center II | Arevon Energy, Inc. | Navarre, FL | Southern Company Services, Inc. - Trans (SOCO) | 79.1 GWh | Oct 2017 | Sep 2025 | Solar |
| Pioneer Trail Solar Energy Center | Florida Power & Light Co | New Smyrna Beach, FL | Florida Power & Light Co. (FPL) | 120.3 GWh | Dec 2018 | Sep 2025 | Solar |
| Gilchrist County Solar | FRP Gilchrist County Solar, LLC | Newberry, FL | Duke Energy Florida, Inc. (FPC) | 181.8 GWh | Oct 2024 | Sep 2025 | Solar |
| Sarasota County LFGTE Facility | Landfill Energy Systems Florida | Nokomis, FL | Florida Power & Light Co. (FPL) | 30.0 GWh | Jan 2015 | Dec 2024 | Landfill Gas |
| Sweetbay Solar Center | Florida Power & Light Co | North of Indiantown, FL | Florida Power & Light Co. (FPL) | 126.1 GWh | Dec 2019 | Sep 2025 | Solar |
| Hildreth Solar Power Plant | Duke Energy Florida, LLC | O'Brien, FL | Duke Energy Florida, Inc. (FPC) | 184.1 GWh | Feb 2023 | Sep 2025 | Solar |
| G2 Energy Marion LLC | G2 Energy LLC | Ocala, FL | Duke Energy Florida, Inc. (FPC) | 129.0 MWh | Dec 2008 | Dec 2024 | Landfill Gas |
| Covanta Lake County Energy | Covanta Lake Inc | Okahumpka, FL | Duke Energy Florida, Inc. (FPC) | 86.5 GWh | Aug 1990 | Sep 2025 | Non-biogenic Municipal Solid Waste : 54.7% Biogenic Municipal Solid Waste : 44.8% Natural Gas : 0.6% |
| Lakeside Solar Center | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 144.5 GWh | Nov 2020 | Sep 2025 | Solar |
| Okeechobee Clean Energy Center | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 11.7 TWh | Feb 2019 | Sep 2025 | Natural Gas |
| FPL Cavendish Solar Energy Center | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 106.5 GWh | Dec 2022 | Sep 2025 | Solar |
| Bluefield Preserve Solar | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 143.4 GWh | Dec 2022 | Sep 2025 | Solar |
| Lockheed Martin Solar System | Lockheed Martin Solar System | Oldsmar, FL | Duke Energy Florida, Inc. (FPC) | 2.9 GWh | Aug 2015 | Dec 2024 | Solar |
| ACE-Stanton A PV | ACE-Stanton A, LLC | Orlando, FL | Florida Municipal Power Pool (FMPP) | 7.8 GWh | Aug 2017 | Dec 2024 | Solar |
| ACE-Stanton PV | ACE-Stanton, LLC | Orlando, FL | Florida Municipal Power Pool (FMPP) | 9.2 GWh | Aug 2017 | Dec 2024 | Solar |
| Orlando Cogen LP | Florida Municipal Power Agency | Orlando, FL | Duke Energy Florida, Inc. (FPC) | 704.8 GWh | Aug 1993 | Dec 2024 | Natural Gas |
Browse Power Plants By Florida Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Polk County, FL | # 1 | 37 | 26.6 TWh |
| Palm Beach County, FL | # 2 | 11 | 26.5 TWh |
| Miami-Dade County, FL | # 3 | 12 | 20.1 TWh |
| St. Lucie County, FL | # 4 | 16 | 19.6 TWh |
| Citrus County, FL | # 5 | 3 | 15.2 TWh |
| Hillsborough County, FL | # 6 | 34 | 13.4 TWh |
| Broward County, FL | # 7 | 7 | 13.0 TWh |
| Okeechobee County, FL | # 8 | 10 | 12.7 TWh |
| Putnam County, FL | # 9 | 10 | 11.3 TWh |
| Orange County, FL | # 10 | 13 | 9.9 TWh |
| Lee County, FL | # 11 | 2 | 9.6 TWh |
| Duval County, FL | # 12 | 22 | 9.0 TWh |
| Martin County, FL | # 13 | 6 | 8.8 TWh |
| Volusia County, FL | # 14 | 11 | 8.4 TWh |
| Brevard County, FL | # 15 | 12 | 8.1 TWh |
| Manatee County, FL | # 16 | 13 | 7.5 TWh |
| Pinellas County, FL | # 17 | 6 | 6.4 TWh |
| Hardee County, FL | # 18 | 7 | 5.5 TWh |
| Osceola County, FL | # 19 | 10 | 4.8 TWh |
| Bay County, FL | # 20 | 7 | 4.5 TWh |
| Escambia County, FL | # 21 | 10 | 3.8 TWh |
| Pasco County, FL | # 22 | 7 | 3.1 TWh |
| Alachua County, FL | # 23 | 13 | 2.7 TWh |
| Leon County, FL | # 24 | 5 | 1.9 TWh |
| Santa Rosa County, FL | # 25 | 6 | 1.6 TWh |
| Hendry County, FL | # 26 | 13 | 1.5 TWh |
| Nassau County, FL | # 27 | 5 | 1.2 TWh |
| Wakulla County, FL | # 28 | 1 | 1.2 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| DeSoto County, FL | # 29 | 11 | 1.1 TWh |
| Calhoun County, FL | # 30 | 9 | 801.0 GWh |
| Indian River County, FL | # 31 | 8 | 720.1 GWh |
| Columbia County, FL | # 32 | 5 | 651.0 GWh |
| Walton County, FL | # 33 | 6 | 622.4 GWh |
| Suwannee County, FL | # 34 | 5 | 609.5 GWh |
| Baker County, FL | # 35 | 5 | 589.5 GWh |
| Gilchrist County, FL | # 36 | 4 | 555.5 GWh |
| Gadsden County, FL | # 37 | 3 | 526.7 GWh |
| Jackson County, FL | # 38 | 6 | 438.1 GWh |
| Hamilton County, FL | # 39 | 5 | 431.1 GWh |
| Charlotte County, FL | # 40 | 5 | 417.2 GWh |
| Clay County, FL | # 41 | 3 | 409.3 GWh |
| Madison County, FL | # 42 | 4 | 368.9 GWh |
| Okaloosa County, FL | # 43 | 3 | 365.2 GWh |
| Collier County, FL | # 44 | 4 | 177.2 GWh |
| Levy County, FL | # 45 | 4 | 172.5 GWh |
| Washington County, FL | # 46 | 1 | 167.5 GWh |
| Union County, FL | # 47 | 1 | 146.3 GWh |
| St. Johns County, FL | # 48 | 1 | 133.9 GWh |
| Lake County, FL | # 49 | 6 | 105.6 GWh |
| Highlands County, FL | # 50 | 6 | 57.7 GWh |
| Sarasota County, FL | # 51 | 1 | 30.0 GWh |
| Seminole County, FL | # 52 | 3 | 14.3 GWh |
| Taylor County, FL | # 53 | 3 | 7.7 GWh |
| Hernando County, FL | # 54 | 2 | 4.7 GWh |
| Monroe County, FL | # 55 | 4 | 3.4 GWh |
| Marion County, FL | # 56 | 1 | 129.0 MWh |