Polk
9995 State Road 37 South, Mulberry, FL 33860Plant Summary Information
Polk is ranked #26 out of 332 power plants in Florida in terms of total annual net electricity generation.
Polk is comprised of 6 generators and generated 1.1 TWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Polk |
|---|---|
| Utility Name | Tampa Electric Co |
| Location | Polk County, FL |
| Initial Operation Date | September 1996 |
| Last Update | May 2026 |
| Annual Generation | 3.3 TWh |
| Annual Consumption | 29.7 M MMBtu |
| Ranked #357 out of 13,081 Power Plants Nationwide | |
| Ranked #204 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #26 out of 332 Florida Power Plants | |
| Ranked #24 out of 82 Florida Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
Map of Polk
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Polk.
Monthly Net Generation for Polk
Monthly Plant Fuel Consumption for Polk
Polk Details
| Summary Information | |
|---|---|
| Plant Name | Polk (7242) |
| Plant Address | 9995 State Road 37 South, Mulberry, FL 33860 |
| Utility | Tampa Electric Co (18454) |
| Latitude, Longitude | 27.7286, -81.9897 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | September 1996 |
| Annual Generation | 3.3 TWh |
| Fuel Types | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tampa Electric Company (TEC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Polk Power Cooling Reservoir |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
FLORIDA GAS TRANSMISSION COMPANY GULFSTREAM NATURAL GAS SYSTEM LLC |
| Natural Gas Storage | No |
Generator 1CT Details Operating September 1996
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 195 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 177 MW |
| Winter Capacity | 206 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | Yes |
| Uprate Or Derate Completed | June 2025 |
| Status | Operating |
|---|---|
| First Operation Date | September 1996 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | Yes |
| Time From Cold Shutdown To Full Load | OVER |
| Fluidized Bed Technology | No |
| Pulverized Coal Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 2000
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 175.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 150 MW |
| Winter Capacity | 180 MW |
| Minimum Load | 89 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2000 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 21 MW |
| Planned Net Winter Capacity Uprate | 28 MW |
| Planned Uprate | June 2027 |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 150 MW |
| Net Winter Capacity With Natural Gas | 180 MW |
| Net Summer Capacity With Oil | 150 MW |
| Net Winter Capacity With Oil | 180 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 3 Details Operating April 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 175.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 150 MW |
| Winter Capacity | 180 MW |
| Minimum Load | 89 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2002 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 21 MW |
| Planned Net Winter Capacity Uprate | 28 MW |
| Planned Uprate | June 2027 |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 150 MW |
| Net Winter Capacity With Natural Gas | 180 MW |
| Net Summer Capacity With Oil | 150 MW |
| Net Winter Capacity With Oil | 180 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 4 Details Operating March 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 199.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 150 MW |
| Winter Capacity | 180 MW |
| Minimum Load | 89 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2007 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 21 MW |
| Planned Net Winter Capacity Uprate | 28 MW |
| Planned Uprate | December 2026 |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 5 Details Operating April 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 199.3 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 150 MW |
| Winter Capacity | 180 MW |
| Minimum Load | 89 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2007 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 21 MW |
| Planned Net Winter Capacity Uprate | 28 MW |
| Planned Uprate | December 2026 |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 2CC Details Operating January 2017
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 513 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 461 MW |
| Winter Capacity | 480 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2017 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 1H |
| Planned Net Summer Capacity Uprate | 18 MW |
| Planned Net Winter Capacity Uprate | 22 MW |
| Planned Uprate | December 2026 |
| Other Planned Modifications | Yes |
| Other Modifications | June 2027 |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Polk Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #194 | Red Oak Power LLC | Sayreville, NJ | 3.3 TWh |
| #195 | Bobby C Smith Jr Energy Facility | Rincon, GA | 3.3 TWh |
| #196 | Bethlehem Energy Center | Glenmont, NY | 3.3 TWh |
| #197 | Carty Generating Station | Boardman, OR | 3.3 TWh |
| #198 | Pastoria Energy Facility, LLC | Lebec, CA | 3.3 TWh |
| #199 | Klamath Cogeneration Plant | Klamath Falls, OR | 3.3 TWh |
| #200 | Dell Power Station | Dell, AR | 3.3 TWh |
| #201 | High Bridge | St. Paul, MN | 3.3 TWh |
| #202 | Midulla Generating Station | Bowling Green, FL | 3.3 TWh |
| #203 | Hobbs Generating Station | Hobbs, NM | 3.3 TWh |
| #205 | J Lamar Stall Unit | Shreveport, LA | 3.2 TWh |
| #206 | Marshall (NC) | Terrell, NC | 7.5 TWh |
| #207 | Bergen Generating Station | Ridgefield, NJ | 3.3 TWh |
| #208 | Wildcat Point Generation Facility | Conowingo, MD | 3.2 TWh |
| #209 | Milford Power Project | Milford, CT | 3.2 TWh |
| #210 | Jones | Lubbock, TX | 3.2 TWh |
| #211 | Arlington Valley Energy Facility | Arlington, AZ | 3.2 TWh |
| #212 | Wise County Power LLC | Poolville, TX | 3.1 TWh |
| #213 | Rocky Mountain Energy Center | Keenesburg, CO | 3.1 TWh |
| #214 | Gila River Power Block 3 | Gila Bend, AZ | 3.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Polk.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alafia Solar | Mulberry, FL | 123.2 GWh | 2.2 mi |
| Bonnie Mine Solar | Bartow, FL | 66.5 GWh | 11.2 mi |
| Duette Solar Power Plant | Parrish, FL | 168.0 GWh | 10.8 mi |
| Durrance | Mulberry, FL | 93.3 GWh | 3.6 mi |
| Fort Green Solar Power Plant | Bowling Green, FL | 168.5 GWh | 6.7 mi |
| Grange Hall Solar | Wimauma, FL | 120.3 GWh | 11.2 mi |
| Hardee Power Station | Bowling Green, FL | 984.0 GWh | 6.6 mi |
| Hines Energy Complex | Bartow, FL | 11.3 TWh | 8.4 mi |
| Jamison Solar (FL) | Mulberry, FL | 137.5 GWh | 5.8 mi |
| Lake Hancock Solar | Bartow, FL | 92.2 GWh | 2.8 mi |
| Lithia Solar | Lithia, FL | 141.1 GWh | 10.8 mi |
| Long Branch Solar | Parrish, FL | 46.2 GWh | 13.2 mi |
| Magnolia Solar | Mulberry, FL | 143.3 GWh | 13.6 mi |
| Midulla Generating Station | Bowling Green, FL | 3.3 TWh | 6.2 mi |
| Mosaic Co Bartow Facility | Bartow, FL | 193.5 GWh | 13.1 mi |
| Mosaic New Wales Operations | Mulberry, FL | 356.3 GWh | 8.2 mi |
| Mosaic South Pierce Operations | Mulberry, FL | 80.6 GWh | 4 mi |
| Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh | 10.8 mi |
| Payne Creek Solar | Bowling Green, FL | 119.2 GWh | 4.7 mi |
| Tiger Bay | Ft. Meade, FL | 870.8 GWh | 8.7 mi |