Mosaic New Wales Operations
3095 CR 640 West, Mulberry, FL 33860Plant Summary Information
Mosaic New Wales Operations is ranked #2 out of 32 waste heat power plants nationwide in terms of total annual net electricity generation.
Mosaic New Wales Operations is comprised of 4 generators and generated 82.1 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Mosaic New Wales Operations |
|---|---|
| Utility Name | Mosaic Fertilizer LLC |
| Location | Polk County, FL |
| Initial Operation Date | August 1981 |
| Last Update | Feb 2026 |
| Annual Generation | 370.3 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,706 out of 12,637 Power Plants Nationwide | |
| Ranked #2 out of 32 Waste Heat Power Plants Nationwide | |
| Ranked #52 out of 327 Florida Power Plants | |
| Ranked #1 out of 3 Florida Waste Heat Power Plants | |
| Fuel Types | Waste Heat |
Map of Mosaic New Wales Operations
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mosaic New Wales Operations.
Monthly Net Generation for Mosaic New Wales Operations
Monthly Plant Fuel Consumption for Mosaic New Wales Operations
Mosaic New Wales Operations Details
| Summary Information | |
|---|---|
| Plant Name | Mosaic New Wales Operations (10434) |
| Plant Address | 3095 CR 640 West, Mulberry, FL 33860 |
| Utility | Mosaic Fertilizer LLC (9383) |
| Latitude, Longitude | 27.83364, -82.05194 |
| Generation Dates on File | Jan 2001 to Feb 2026 |
| Initial Operation Date | August 1981 |
| Annual Generation | 370.3 GWh |
| Fuel Types | Waste Heat |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 84-81-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tampa Electric Company (TEC) |
| NAICS Code | Nitrogenous Fertilizer Manufacturing (325311) |
| Sector | Industrial CHP (7) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator TG1 Details Out of Service August 1981
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 10 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 8 MW |
| Winter Capacity | 8 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | August 1981 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Waste Heat |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator TG3 Details Operating December 1982
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 32 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 32 MW |
| Winter Capacity | 32 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1982 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Waste Heat |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator TG2 Details Operating December 1984
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 58.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1984 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Waste Heat |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator TG4 Details Operating May 2014
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 35 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 24 MW |
| Winter Capacity | 24 MW |
| Minimum Load | 3.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2014 |
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Waste Heat |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Mosaic New Wales Operations Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Waste Heat.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Heat Recovery Coke Facility | East Chicago, IN | 414.3 GWh |
| #3 | PCS Phosphate | Aurora, NC | 221.6 GWh |
| #4 | St. Mary Clean Energy Center | Centerville, LA | 201.2 GWh |
| #5 | Mosaic Co Bartow Facility | Bartow, FL | 193.0 GWh |
| #6 | Wilmington Hydrogen Plant | Wilmington, CA | 164.4 GWh |
| #7 | OREG 1 Inc | Culbertson, MT | 130.7 GWh |
| #8 | OREG 2 Inc | Culbertson, MT | 128.1 GWh |
| #9 | Lake Charles Plant | Sulphur, LA | 114.8 GWh |
| #10 | Kennecott Power Plant | Magna, UT | 144.1 GWh |
| #11 | ADA Carbon Solutions Red River | Coushatta, LA | 105.6 GWh |
| #12 | Mosaic Phosphates Uncle Sam | Uncle Sam, LA | 88.9 GWh |
| #13 | Mosaic South Pierce Operations | Mulberry, FL | 84.0 GWh |
| #14 | Bayway Refinery | Linden, NJ | 71.4 GWh |
| #15 | Rentech Nitrogen Pasadena Cogeneration | Pasadena, TX | 70.8 GWh |
| #16 | Simplot Leasing Don Plant | Pocatello, ID | 66.1 GWh |
| #17 | Ivanhoe Generation Facility | Franklin, LA | 53.2 GWh |
| #18 | Houston Plant | Houston, TX | 52.7 GWh |
| #19 | Williams Ignacio Natural Gas Plant | Durango, CO | 46.7 GWh |
| #20 | OREG 3 Inc | Trimont, MN | 44.0 GWh |
| #21 | Veyo Heat Recovery Project | Gunlock, UT | 39.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mosaic New Wales Operations.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alafia Solar | Mulberry, FL | 121.9 GWh | 7.8 mi |
| Balm Solar | Wimauma, FL | 141.7 GWh | 12.2 mi |
| Bonnie Mine Solar | Bartow, FL | 67.9 GWh | 5.6 mi |
| Dover Solar and Battery Storage | Dover, FL | 49.2 GWh | 12.4 mi |
| Durrance | Mulberry, FL | 65.9 GWh | 5.7 mi |
| English Creek Solar | Plant City, FL | 791.0 MWh | 7.8 mi |
| Goldfinch | Lakeland, FL | 4.4 GWh | 10.3 mi |
| Grange Hall Solar | Wimauma, FL | 121.5 GWh | 12.6 mi |
| Hines Energy Complex | Bartow, FL | 11.6 TWh | 11.6 mi |
| Jamison Solar (FL) | Mulberry, FL | 140.2 GWh | 6.2 mi |
| Lake Hancock Solar | Bartow, FL | 94.4 GWh | 8 mi |
| Lakeland Electric Co. (FL) - Airport II | Lakeland, FL | 2.2 GWh | 10.9 mi |
| Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.4 GWh | 10.7 mi |
| Laurel Oaks Solar | Plant City, FL | 125.8 GWh | 6.5 mi |
| Lithia Solar | Lithia, FL | 143.7 GWh | 8.8 mi |
| Magnolia Solar | Mulberry, FL | 147.1 GWh | 5.8 mi |
| Mosaic Co Bartow Facility | Bartow, FL | 193.0 GWh | 9.6 mi |
| Mosaic South Pierce Operations | Mulberry, FL | 84.0 GWh | 8.4 mi |
| Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh | 10.7 mi |
| Polk | Mulberry, FL | 3.5 TWh | 8.2 mi |