Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Pecan PV1 | Strata Manager, LLC | Cordova, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Langley PV1 | Strata Manager, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Mariposa Solar Center LLC | Heelstone Energy Holdings, LLC | Stanley, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Aug 2016 | Dec 2025 | Solar |
| Highland Solar Center LLC | SRE Utility Solar 1, LLC | Grifton, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Elm City Solar Facility | Duke Energy Progress - (NC) | Elm City, NC | Duke Energy Progress East (CPLE) | 57.5 GWh | Feb 2016 | Dec 2025 | Solar |
| Bridgeport Disposal Solar Farm | Bridgeport Disposal LLC | Gloucester, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Mar 2011 | Dec 2025 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Avalon Solar | Arevon Energy, Inc. | Pima, AZ | Tucson Electric Power (TEPC) | 64.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Jakana Solar | Strata Manager, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 9.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Windsor Solar | Strata Manager, LLC | Windsor, NC | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Bethel Solar | Strata Manager, LLC | Bethel, NC | PJM Interconnection, LLC (PJM) | 7.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Lewiston Solar | Strata Manager, LLC | Lewiston, NC | PJM Interconnection, LLC (PJM) | 8.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Woodland Solar | Deriva Energy | Woodland, NC | PJM Interconnection, LLC (PJM) | 8.8 GWh | Mar 2016 | Dec 2025 | Solar |
| Williamston Solar | Strata Manager, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Winton Solar | Deriva Energy | Winton, NC | PJM Interconnection, LLC (PJM) | 8.3 GWh | Jan 2016 | Dec 2025 | Solar |
| Franklin 1 | CD US Solar MT 2 LLC | Wrentham, MA | ISO New England (ISNE) | 4.4 GWh | Oct 2013 | Dec 2025 | Solar |
| Franklin 2 | CD US Solar MT 2 LLC | Franklin, MA | ISO New England (ISNE) | 5.7 GWh | Nov 2013 | Dec 2025 | Solar |
| Marion Solar LNG | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2015 | Dec 2025 | Solar |
| Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.0 GWh | Jul 2014 | Dec 2025 | Solar |
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| Jacobstown | NJR Clean Energy Ventures Corporation | North Hanover, NJ | PJM Interconnection, LLC (PJM) | 7.5 GWh | Aug 2014 | Dec 2025 | Solar |
| West Pemberton | NJR Clean Energy Ventures Corporation | Pemberton Twp, NJ | PJM Interconnection, LLC (PJM) | 11.3 GWh | Jun 2014 | Dec 2025 | Solar |
| Beethoven Wind | NorthWestern Energy - (SD) | Tripp, SD | Southwest Power Pool (SWPP) | 282.3 GWh | Apr 2015 | Dec 2025 | Wind |
| East Wayne Solar LLC | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Feb 2014 | Dec 2025 | Solar |
| Vickers | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Jul 2014 | Dec 2025 | Solar |
| Soluga Farms 1 | Strata Manager, LLC | Newton Grove, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | May 2014 | Dec 2025 | Solar |
| Soluga Farms 2 LLC | Strata Manager, LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Aug 2014 | Dec 2025 | Solar |
| Univ Minnesota CHP Plant | University of Minnesota Central Utilities | Minneapolis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 172.0 GWh | Oct 2017 | Dec 2025 | Natural Gas : 99.7% |
| Sterling PV 3 | CleanCapital Holdings | Sterling, CO | Public Service Company of Colorado (PSCO) | 2.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Mesa PV1 | CleanCapital Holdings | Grand Junction, CO | Public Service Company of Colorado (PSCO) | 1.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Pleasant Valley Wind Farm | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 463.6 GWh | Jul 2015 | Dec 2025 | Wind |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 2014 | Dec 2025 | Solar |
| OCI Alamo 3 LLC | RWE Clean Energy | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 9.6 GWh | Nov 2014 | Dec 2025 | Solar |
| OCI Alamo 5 LLC | RWE Clean Energy | Uvalde, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 159.1 GWh | Nov 2015 | Dec 2025 | Solar |
| OCI Alamo 7 LLC | RWE Clean Energy | Haskell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 231.6 GWh | Jul 2016 | Dec 2025 | Solar |
| Clipperton Holdings LLC | Dominion Renewable Energy | Clinton, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Oct 2017 | Dec 2025 | Solar |
| Tiburon Holdings | Heelstone Energy Holdings, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 4.2 GWh | Jun 2014 | Dec 2025 | Solar |
| Pecan Row Landfill To Electric Facility | Energy Developments, Inc d/b/a EDL | Valdosta, GA | Southern Company Services, Inc. - Trans (SOCO) | 26.6 GWh | May 1977 | Dec 2025 | Landfill Gas |
| Optimum Wind 5 LLC | Novis Renewables, LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Feb 2017 | Dec 2025 | Wind |
| Optimum Wind 6 LLC | Novis Renewables, LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 GWh | Feb 2017 | Dec 2025 | Wind |
| Optimum Wind 7 LLC | Novis Renewables, LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.2 GWh | Feb 2017 | Dec 2025 | Wind |
| Optimum Wind 4 LLC | Novis Renewables, LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Feb 2017 | Dec 2025 | Wind |
| Optimum Wind 3 LLC | Novis Renewables, LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Feb 2017 | Dec 2025 | Wind |
| Leonardo Wind 1 LLC | Novis Renewables, LLC | Alden, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Nov 2016 | Dec 2025 | Wind |
| Venus Wind 3 LLC | Novis Renewables, LLC | Grinnell, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 GWh | Feb 2017 | Dec 2025 | Wind |
| Michelangelo Wind 1 LLC | Novis Renewables, LLC | Huxley, IA | Midcontinent Independent System Operator, Inc. (MISO) | 10.2 GWh | Feb 2017 | Dec 2025 | Wind |
| Michelangelo Wind 4 LLC | Novis Renewables, LLC | Ames, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | Nov 2016 | Dec 2025 | Wind |
| Arbuckle Mountain Wind Farm LLC | Arbuckle Mountain Wind Farm LLC | Davis, OK | Southwest Power Pool (SWPP) | 291.5 GWh | Oct 2015 | Dec 2025 | Wind |
| Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 53.7 GWh | Dec 2014 | Dec 2025 | Wind |
| Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 260.1 GWh | May 2015 | Dec 2025 | Wind |
| Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 53.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Eagle Springs Solar LLC | Eagle Springs Solar LLC | Silt, CO | Public Service Company of Colorado (PSCO) | 1.5 GWh | Jul 2013 | Dec 2025 | Solar |
| Brockelman | Integrys MA Solar, LLC | Lancaster, MA | ISO New England (ISNE) | 4.7 GWh | Oct 2013 | Dec 2025 | Solar |
| Beverly | Integrys MA Solar, LLC | Beverly, MA | ISO New England (ISNE) | 3.3 GWh | Apr 2014 | Dec 2025 | Solar |
| Rio Bravo Solar 1 LLC | Deriva Energy | McKittrick, CA | California Independent System Operator (CISO) | 52.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Rio Bravo Solar II LLC | Deriva Energy | McKittrick, CA | California Independent System Operator (CISO) | 51.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Wildwood Solar II | Deriva Energy | Wasco, CA | California Independent System Operator (CISO) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| Hidden View Dairy, LLC | Hidden View Dairy, LLC | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Jan 2007 | Dec 2025 | Natural Gas |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 24.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Sutter Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Sep 2015 | Dec 2025 | Solar |
| Sterlington Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Sep 2015 | Dec 2025 | Solar |
| Leavenworth Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 17.7 GWh | May 2016 | Dec 2025 | Solar |
| Medford WWTP | NJR Clean Energy Ventures Corporation | Medford, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Jul 2013 | Dec 2025 | Solar |
| Reeves South | NJR Clean Energy Ventures Corporation | Medford, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2013 | Dec 2025 | Solar |
| Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2013 | Dec 2025 | Natural Gas |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2013 | Dec 2025 | Natural Gas |
| California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Mammoth Plains | Mammoth Plains Wind Project | Oakwood, OK | Southwest Power Pool (SWPP) | 623.0 GWh | Nov 2014 | Dec 2025 | Wind |
| WED NK Green | WED NK Green LLC | North Kingstown, RI | ISO New England (ISNE) | 2.7 GWh | Feb 2012 | Dec 2025 | Wind |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 21.8 GWh | Apr 2017 | Dec 2025 | Landfill Gas |
| Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.2 GWh | Jul 2014 | Dec 2025 | Solar |
| WED Coventry 1 | WED Coventry One, LLC | Coventry, RI | ISO New England (ISNE) | 2.8 GWh | Sep 2016 | Dec 2025 | Wind |
| WED Coventry 3 | WED Coventry Three, LLC | Coventry, RI | ISO New England (ISNE) | 3.4 GWh | Jul 2016 | Dec 2025 | Wind |
| WED Coventry 4 | WED Coventry Four, LLC | Coventry, RI | ISO New England (ISNE) | 2.7 GWh | Jul 2016 | Dec 2025 | Wind |
| Black Oak Power Producers | Cube District Energy, LLC | Hartville, MO | Associated Electric Cooperative, Inc. (AECI) | 11.0 GWh | Nov 2014 | Dec 2025 | Landfill Gas |
| Seiling Wind I | NextEra Energy Seiling Wind | Seiling, OK | Southwest Power Pool (SWPP) | 454.1 GWh | Nov 2014 | Dec 2025 | Wind |
| Seiling Wind II | NextEra Energy Seiling Wind | Seiling, OK | Southwest Power Pool (SWPP) | 260.6 GWh | Nov 2014 | Dec 2025 | Wind |
| WED Coventry 5 | Greenbacker Renewable Energy Corporation | Coventry, RI | ISO New England (ISNE) | 3.3 GWh | Feb 2017 | Dec 2025 | Wind |
| North Run | NJR Clean Energy Ventures Corporation | Wrightstown, NJ | PJM Interconnection, LLC (PJM) | 7.3 GWh | Dec 2014 | Dec 2025 | Solar |
| Rock Solid | NJR Clean Energy Ventures Corporation | Howell, NJ | PJM Interconnection, LLC (PJM) | 11.9 GWh | Oct 2014 | Dec 2025 | Solar |
| Pumpjack Solar I | Deriva Energy | McKittrick, CA | California Independent System Operator (CISO) | 50.6 GWh | Dec 2014 | Dec 2025 | Solar |
| Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Jul 2014 | Dec 2025 | Solar |
| MCCo Solar Generating Facility | The Medical Center Company | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Marlboro Mushrooms Solar Field | Marlboro Mushroom | West Grove, PA | PJM Interconnection, LLC (PJM) | 1.3 GWh | Oct 2011 | Dec 2025 | Solar |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.2 GWh | Oct 2014 | Dec 2025 | Wind |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2025 | Wind |
| Faison Solar | USF Surry, LLC | Faison, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Jun 2015 | Dec 2025 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 55.4 GWh | Jul 2015 | Dec 2025 | Solar |
| MCLB Landfill Gas to Energy | Inst and Envir Div Marine Logistics Base | Albany, GA | Southern Company Services, Inc. - Trans (SOCO) | 53.0 MWh | Aug 2011 | Dec 2025 | Landfill Gas |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |