2101 Pelican Road, Shepherd, TX 77371Plant Summary Information
San Jacinto County Peaking Facility is ranked #134 out of 312 natural gas power plants in Texas in terms of total annual net electricity generation.
San Jacinto County Peaking Facility is comprised of 2 generators and generated 31.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | San Jacinto County Peaking Facility |
---|---|
Utility Name | East Texas Electric Coop, Inc |
Location | San Jacinto County, TX |
Initial Operation Date | July 2001 |
Last Update | Dec 2024 |
Annual Generation | 139.6 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #2,874 out of 12,299 Power Plants Nationwide | |
Ranked #831 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #453 out of 792 Texas Power Plants | |
Ranked #134 out of 312 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of San Jacinto County Peaking Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for San Jacinto County Peaking Facility.
Monthly Net Generation for San Jacinto County Peaking Facility
San Jacinto County Peaking Facility Details
Summary Information | |
---|---|
Plant Name | San Jacinto County Peaking Facility (56603) |
Plant Address | 2101 Pelican Road, Shepherd, TX 77371 |
Utility | East Texas Electric Coop, Inc (39347) |
Latitude, Longitude | 30.4193, -95.0118 |
Generation Dates on File | Jul 2009 to Dec 2024 |
Initial Operation Date | July 2001 |
Annual Generation | 139.6 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Texas Inc. (55937) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
TENNESSEE GAS PIPELINE COMPANY NATURAL GAS PL CO OF AMERICA LLC |
Natural Gas Storage | No |
Generator SJC1 Details Operating July 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ESS.SAN_JC1_CT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ESS.SAN_JC1_CT |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 73 MW |
Winter Capacity | 85 MW |
Minimum Load | 42 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator SJC2 Details Operating July 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ESS.SAN_JC2_CT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ESS.SAN_JC2_CT |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 73 MW |
Winter Capacity | 85 MW |
Minimum Load | 42 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
San Jacinto County Peaking Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#821 | MU Combined Heat and Power Plant | Columbia, MO | 198.4 GWh |
#822 | Wasson CO2 Removal Plant | Denver City, TX | 145.6 GWh |
#823 | LEPA Unit No. 1 | Morgan City, LA | 144.7 GWh |
#824 | Escanaba Mill | Escanaba, MI | 459.7 GWh |
#825 | Hamlet Generating Facility | Hamlet, NC | 144.9 GWh |
#826 | Cleveland Works | Cleveland, OH | 343.9 GWh |
#827 | El Segundo Energy Center LLC | El Segundo, CA | 141.2 GWh |
#828 | PSEG Kearny Generating Station | Kearny, NJ | 141.1 GWh |
#829 | John Twitty Energy Center | Springfield, MO | 2.3 TWh |
#830 | CF Industries Yazoo City Complex | Yazoo City, MS | 140.0 GWh |
#832 | Berry Cogen Tanne Hills 18 | Maricopa, CA | 138.9 GWh |
#833 | Stillwater Energy Center | Stillwater, OK | 138.8 GWh |
#834 | Seminole Mill | Jacksonville, FL | 138.7 GWh |
#835 | Fountain Valley Power Facility | Fountain, CO | 136.9 GWh |
#836 | Comanche (CO) | Pueblo, CO | 6.3 TWh |
#837 | International Paper Prattville Mill | Prattville, AL | 550.8 GWh |
#838 | Middletown | Middletown, CT | 169.8 GWh |
#839 | Colorado Energy Nations Company | Golden, CO | 135.5 GWh |
#840 | Saguaro | Red Rock, AZ | 135.2 GWh |
#841 | Terry Bundy Generating Station | Lincoln, NE | 161.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding San Jacinto County Peaking Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Chamon Power LLC | Houston, TX | 114.9 GWh | 37.5 mi |
Channelview Cogeneration Plant | Channelview, TX | 5.8 TWh | 40.8 mi |
HEB00798 | Humble, TX | 136.0 MWh | 34 mi |
Lewis Creek | Willis, TX | 2.0 TWh | 30.4 mi |
Liberty County Solar Project | Dayton, TX | 120.5 GWh | 33.2 mi |
Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 95.4 GWh | 40.7 mi |
Montgomery County | Willis, TX | 6.3 TWh | 30.8 mi |
RC Thomas Hydroelectric Project | Livingston, TX | 123.8 GWh | 14.7 mi |
Remy Jade Power Station | Crosby, TX | 515.8 GWh | 39.4 mi |
Security | Cleveland, TX | 6.2 GWh | 16.7 mi |
SJRR Power LLC | Houston, TX | 146.6 GWh | 37.6 mi |
Umbriel Solar | Livington, TX | 320.6 GWh | 21.9 mi |
WAL1103 | Houston, TX | 326.0 MWh | 40.6 mi |
WAL3390 | The Woodlands, TX | 282.0 MWh | 37.9 mi |
WAL4298 | Humble, TX | 303.0 MWh | 36.3 mi |
WAL522 | Crosby, TX | 316.0 MWh | 36.4 mi |
WAL5287 | Spring, TX | 226.0 MWh | 38.1 mi |
WAL602 | Spring, TX | 223.0 MWh | 33.5 mi |
WAL744 | Humble, TX | 286.0 MWh | 30.9 mi |
WAL849 | Spring, TX | 254.0 MWh | 34.9 mi |