| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Harrah's Atlantic City - POI 2 (Self Par | Distributed Solar Development, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Aug 2024 | Dec 2024 | Solar |
| Marathon Solar Farm II LLC North | Distributed Solar Development, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Delta's Edge Solar | Cubico USA, LLC | Greenwood, MS | Midcontinent Independent System Operator, Inc. (MISO) | 106.9 GWh | Oct 2023 | Feb 2026 | Solar |
| Lemonweir (Oak 1) | Greenbacker Renewable Energy Corporation | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Nov 2023 | Dec 2024 | Solar |
| SCH County - (1B) 10 Alice Wagner Way Ni | Distributed Solar Development, LLC | Niskayuna, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Sep 2020 | Dec 2024 | Solar |
| SCH County - (1E) 398 Anthony St Schenec | Distributed Solar Development, LLC | Schenectady, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Feb 2020 | Dec 2024 | Solar |
| SCH - (2A) 156 Barhydt Rd Glenville | Distributed Solar Development, LLC | Glenville, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Jun 2021 | Dec 2024 | Solar |
| SCH County - (2B) 4982 Rynex Corners Rd | Distributed Solar Development, LLC | Pattersonville, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2020 | Dec 2024 | Solar |
| SCH County - (2D) 98 Cheltingham Ave Sch | Distributed Solar Development, LLC | Schenectady, NY | New York Independent System Operator (NYIS) | 2.1 GWh | May 2020 | Dec 2024 | Solar |
| Source Power Company - Richland | Distributed Solar Development, LLC | Richland, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Oct 2021 | Dec 2024 | Solar |
| Source Power Company - Silver Creek | Distributed Solar Development, LLC | Silver Creek, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2021 | Dec 2024 | Solar |
| THD Baltimore DC - 5830 Project Tiger | Distributed Solar Development, LLC | Edgemere, MD | PJM Interconnection, LLC (PJM) | 1.6 GWh | Dec 2020 | Dec 2024 | Solar |
| Athens Ridge | Greenbacker Renewable Energy Corporation | Athens, ME | ISO New England (ISNE) | 3.6 GWh | Feb 2024 | Dec 2024 | Solar |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 153.3 GWh | Nov 2023 | Feb 2026 | Solar |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 362.3 GWh | Apr 2024 | Feb 2026 | Solar |
| Ash Creek Solar | Ash Creek | Abbott, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 532.2 GWh | - | Feb 2026 | Solar |
| Morrow Lake Solar | Leeward Asset Management, LLC | Pearsall, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 61.4 GWh | - | Feb 2026 | Solar |
| Brookdale CC BTM at Lincroft | Solar DG NJ Brookdale, LLC | Lincroft, NJ | PJM Interconnection, LLC (PJM) | 4.6 GWh | Nov 2022 | Dec 2024 | Solar |
| Geneseo Solar | Helios Energy New York 15 LLC | Geneseo, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Posey Solar | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 315.8 GWh | - | Feb 2026 | Solar |
| ADP Parsippany NJ | Distributed Solar Development, LLC | Parsippany, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2022 | Dec 2024 | Solar |
| Bayer - Whippany, NJ | Distributed Solar Development, LLC | Whippany, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2023 | Dec 2024 | Solar |
| Solops 371 Hoes LLC | Solops 371 Hoes LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Cenergy - Richards (CSG) | Luminace Sunbeam Development Holdings, LLC | Fairfield, ME | ISO New England (ISNE) | 1.8 GWh | Sep 2023 | Dec 2024 | Solar |
| Cenergy - Waterville (CSG) | Luminace Sunbeam Development Holdings, LLC | Waterville, ME | ISO New England (ISNE) | 9.1 GWh | Jun 2023 | Dec 2024 | Solar |
| Cenergy - Kiger | Luminace Sunbeam Development Holdings, LLC | Embden, ME | ISO New England (ISNE) | 2.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Cenergy - Wiscasset (CSG) | Luminace Sunbeam Development Holdings, LLC | Wiscasset, ME | ISO New England (ISNE) | 8.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Hayhurst Texas Solar | Hayhurst Texas Solar | Orla, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 64.0 GWh | Mar 2024 | Dec 2024 | Solar |
| FreeState Kiro Solar I | Evergy Kansas Central, Inc | Silver Lake, KS | Southwest Power Pool (SWPP) | 2.3 GWh | Jan 2023 | Dec 2024 | Solar |
| FreeState Crooked Post Solar I | Evergy Kansas Central, Inc | Topeka, KS | Southwest Power Pool (SWPP) | 3.6 GWh | Feb 2023 | Dec 2024 | Solar |
| FreeState Stull Solar I | Evergy Kansas Central, Inc | LeCompton, KS | Southwest Power Pool (SWPP) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Baldy Mesa 2_Silver Peak Hybrid | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 124.7 GWh | Nov 2024 | Feb 2026 | Solar |
| Houston Solar | Energy 49, LLC | Houston, AK | (NA) | 7.8 GWh | Aug 2023 | Dec 2024 | Solar |
| Escalante (NM) | Origis Energy USA, Inc | Grants, NM | Public Service Company of New Mexico (PNM) | 520.5 GWh | May 2024 | Feb 2026 | Solar |
| Gray Solar | Ecos Energy LLC | Rutland, VT | ISO New England (ISNE) | 3.5 GWh | Jul 2023 | Dec 2024 | Solar |
| SF Azalea, LLC | Idemitsu Renewables | Lost Hills, CA | California Independent System Operator (CISO) | 19.1 GWh | - | Feb 2026 | Solar |
| Fort Martin Solar | Monongahela Power Co | Maidsville, WV | PJM Interconnection, LLC (PJM) | 28.4 GWh | Dec 2023 | Dec 2024 | Solar |
| Rivesville Solar | Monongahela Power Co | Rivesville, WV | PJM Interconnection, LLC (PJM) | 1.6 GWh | Aug 2024 | Dec 2024 | Solar |
| BT Hickerson Solar, LLC | BT Hickerson Solar, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 304.5 GWh | - | Feb 2026 | Solar |
| Hammonton-High School Solar | Madison Energy Investments LLC | Atlantic, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2022 | Dec 2024 | Solar |
| Barefoot Solar | Madison Energy Investments LLC | Fairfiled, ME | ISO New England (ISNE) | 6.7 GWh | Nov 2022 | Dec 2024 | Solar |
| English Creek Solar | Tampa Electric Co | Plant City, FL | Tampa Electric Company (TEC) | 791.0 MWh | Nov 2024 | Dec 2024 | Solar |
| SR McNeal | SR McNeal, LLC | McNeal, AZ | Tucson Electric Power (TEPC) | 52.9 GWh | Nov 2023 | Feb 2026 | Solar |
| Bryan Floyd | Madison Energy Holdings LLC | Pembroke, GA | Southern Company Services, Inc. - Trans (SOCO) | 4.5 GWh | Aug 2023 | Dec 2024 | Solar |
| Halsey Valley | LSE Pegasus LLC | Barton, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Spring Grove Solar 2 | Urban Grid Solar | Spring Grove, VA | PJM Interconnection, LLC (PJM) | 14.9 GWh | - | Feb 2026 | Solar |
| ME Novel Lighthouse - Huggard Ave Solar | Luminace Sunbeam Development Holdings, LLC | Limestone, ME | (NA) | 2.5 GWh | Jan 2024 | Dec 2024 | Solar |
| ME Novel Lighthouse - Front St. Solar CS | Luminace Sunbeam Development Holdings, LLC | Skowhegan, ME | ISO New England (ISNE) | 3.9 GWh | Apr 2023 | Dec 2024 | Solar |
| Lightstar Renewables - Project 1004 | Distributed Solar Development, LLC | Saugerties, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Oct 2022 | Dec 2024 | Solar |
| Source Power II - Taft CSG | Distributed Solar Development, LLC | East Syracuse, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Sep 2023 | Dec 2024 | Solar |
| Alton Post Office Solar | Urban Grid Solar | Alton, VA | PJM Interconnection, LLC (PJM) | 136.8 GWh | Nov 2024 | Feb 2026 | Solar |
| Aspen Road Solar | Urban Grid Solar | Spring Run, PA | PJM Interconnection, LLC (PJM) | 178.0 GWh | - | Feb 2026 | Solar |
| Crystal Hill Solar | Urban Grid Solar | Crystal Hill, VA | PJM Interconnection, LLC (PJM) | 127.5 GWh | Nov 2023 | Feb 2026 | Solar |
| Egypt Road Solar | Urban Grid Solar | Cambridge, MD | PJM Interconnection, LLC (PJM) | 12.5 GWh | - | Feb 2026 | Solar |
| Foxglove Solar | Urban Grid Solar | Middletown, VA | PJM Interconnection, LLC (PJM) | 130.0 GWh | Sep 2024 | Feb 2026 | Solar |
| Jones Farm Solar | Urban Grid Solar | Millington, MD | PJM Interconnection, LLC (PJM) | 85.2 GWh | - | Feb 2026 | Solar |
| Genesee Solar Project | Genesee Solar Energy, LLC | Flint, MI | Midcontinent Independent System Operator, Inc. (MISO) | 6.7 GWh | - | Feb 2026 | Solar |
| Old Bridge Global Landfill CSG | NJR Clean Energy Ventures Corporation | Old Bridge, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Sep 2023 | Dec 2024 | Solar |
| Jogee Road Solar | DG New York CS, LLC | MIddleton, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Jun 2022 | Dec 2024 | Solar |
| Robin Hollow Solar | Robin Hollow Solar, LLC | West Greenwich, RI | ISO New England (ISNE) | 66.2 GWh | Nov 2023 | Feb 2026 | Solar |
| NY Sorrell Hill II CSG | DG Empire Lumen 2023, LLC | Baldwinsville, NY | New York Independent System Operator (NYIS) | 481.0 MWh | Apr 2024 | Dec 2024 | Solar |
| Orion I Solar Project | Ben Milam Solar 1 LLC | Burlington, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 449.7 GWh | Jul 2024 | Feb 2026 | Solar |
| Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 8.8 GWh | Nov 2020 | Dec 2024 | Solar |
| North Fork Solar Project | North Fork Solar Project, LLC | Snyder, OK | Southwest Power Pool (SWPP) | 305.9 GWh | Apr 2024 | Feb 2026 | Solar |
| Cannonball Solar (CSG) | AES Clean Energy | Thurmont, MD | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2024 | Dec 2024 | Solar |
| Big Spring Solar (CSG) | AES Clean Energy | Clear Spring, MD | PJM Interconnection, LLC (PJM) | 264.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Estonian Solar Project, LLC | Enel Green Power Estonian Solar Project, LLC | Cooper, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 462.3 GWh | - | Feb 2026 | Solar |
| Kiowa County Solar Project, LLC | Kiowa County Solar Project, LLC | Snyder, OK | Southwestern Power Administration (SPA) | 272.8 GWh | - | Feb 2026 | Solar |
| Altona Solar, LLC | Birch Creek Power, LLC | Centralia, MO | Midcontinent Independent System Operator, Inc. (MISO) | 65.4 GWh | Jul 2024 | Feb 2026 | Solar |
| Envoy Solar, LLC | Birch Creek Power, LLC | Mexico, MO | Midcontinent Independent System Operator, Inc. (MISO) | 107.9 GWh | - | Feb 2026 | Solar |
| Richland Township Solar, LLC | Birch Creek Power, LLC | Washburn, IL | Midcontinent Independent System Operator, Inc. (MISO) | 77.4 GWh | - | Feb 2026 | Solar |
| Earp Solar, LLC | Birch Creek Power, LLC | Monmouth, IL | Midcontinent Independent System Operator, Inc. (MISO) | 75.9 GWh | Mar 2024 | Feb 2026 | Solar |
| Kimmel Road Solar, LLC | Birch Creek Power, LLC | Du Quoin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 102.6 GWh | Sep 2024 | Feb 2026 | Solar |
| Salt Creek Township Solar, LLC | Birch Creek Power, LLC | Mason City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 105.8 GWh | - | Feb 2026 | Solar |
| Adams Solar LLC PA | Adams Solar LLC (PA) | Gettysburg, PA | PJM Interconnection, LLC (PJM) | 140.5 GWh | Nov 2023 | Feb 2026 | Solar |
| Caden Energix Axton LLC | Caden Energix Axton LLC | Axton, VA | PJM Interconnection, LLC (PJM) | 120.8 GWh | Nov 2023 | Feb 2026 | Solar |
| McFarland A Solar and Storage | AES Clean Energy | Dateland, AZ | California Independent System Operator (CISO) | 552.9 GWh | Nov 2023 | Feb 2026 | Solar |
| McFarland B Solar and Storage | AES Clean Energy | Dateland, AZ | California Independent System Operator (CISO) | 677.4 GWh | Nov 2024 | Feb 2026 | Solar |
| Falmouth Renewable Energy Center | Duke Energy Florida, LLC | Live Oak, FL | Duke Energy Florida, Inc. (FPC) | 179.8 GWh | May 2024 | Feb 2026 | Solar |
| Sonoran Solar Energy | Sonoran Solar Energy, LLC | Buckeye, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 1.1 TWh | Jun 2023 | Feb 2026 | Solar |
| Dunns Bridge I Solar | Dunns Bridge Solar Center LLC | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 506.8 GWh | May 2023 | Feb 2026 | Solar |
| ELP - Kipp | ELP Kipp Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Martin County Solar Project, LLC | Martin County Solar Project, LLC | Pilgrim, KY | PJM Interconnection, LLC (PJM) | 211.5 GWh | Nov 2024 | Feb 2026 | Solar |
| Long Lake Solar, LLC | Long Lake Solar, LLC | West Helena, AR | Midcontinent Independent System Operator, Inc. (MISO) | 433.1 GWh | - | Feb 2026 | Solar |
| KDC Solar CV Ascend One LLC | KDC Solar CV Ascend One LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.7 GWh | Apr 2023 | Dec 2024 | Solar |
| KDC Solar CV Cedar Lane Park LLC | KDC Solar CV Cedar Lane Park LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Oct 2023 | Dec 2024 | Solar |
| KDC Solar CV Central MD Regional Transit | KDC Solar CV Central MD Regional Transit LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 2.9 GWh | Apr 2023 | Dec 2024 | Solar |
| KDC Solar CV Animal Control LLC | KDC Solar CV Animal Control LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Oct 2023 | Dec 2024 | Solar |
| KDC Solar CV O'Donnell Property LLC | KDC Solar CV O'Donnell Property LLC | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.0 GWh | Jun 2023 | Dec 2024 | Solar |
| City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2023 | Dec 2024 | Solar |
| Arthur 2 Solar | Arthur Solar 2, LLC | Tabor City, NC | Duke Energy Progress East (CPLE) | 7.6 GWh | Feb 2023 | Sep 2024 | Solar |
| French King Solar LLC | French King Solar LLC | Erving, MA | ISO New England (ISNE) | 7.8 GWh | Oct 2022 | Dec 2024 | Solar |
| DOCCS Greene | Green Correctional Coxsackie NY Solar LLC | Coxsackie, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Sep 2022 | Dec 2024 | Solar |
| Americus | Today's Power, Inc. | Emporia, KS | Southwest Power Pool (SWPP) | 2.3 GWh | Jul 2021 | Dec 2024 | Solar |
| Ashley-Chicot Solar | Today's Power, Inc. | Hamburg, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2018 | Dec 2024 | Solar |
| Berryville School District Solar | Today's Power, Inc. | Berryville, AR | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2018 | Dec 2024 | Solar |
| C&L | Today's Power, Inc. | Star City, AR | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2020 | Dec 2024 | Solar |
| Cheney Solar | Today's Power, Inc. | Cheney, KS | Southwest Power Pool (SWPP) | 2.5 GWh | Mar 2021 | Dec 2024 | Solar |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 309.9 GWh | Apr 2024 | Feb 2026 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |