Broadway 2 - Tucson Phase II
14199 W Mile Wide Rd., Tucson, AZ 85714Plant Summary Information
Broadway 2 - Tucson Phase II is ranked #100 out of 113 solar farms in Arizona in terms of total annual net electricity generation.
Broadway 2 - Tucson Phase II generated 1.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Broadway 2 - Tucson Phase II |
---|---|
Utility Name | MN8 Energy LLC |
Location | Pima County, AZ |
Initial Operation Date | December 2013 |
Last Update | Dec 2024 |
Annual Generation | 2.0 GWh |
Annual Consumption | 6.9 k MMBtu |
Ranked #10,356 out of 12,312 Power Plants Nationwide | |
Ranked #5,140 out of 6,191 Solar Power Plants Nationwide | |
Ranked #153 out of 166 Arizona Power Plants | |
Ranked #100 out of 113 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Broadway 2 - Tucson Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broadway 2 - Tucson Phase II.
Monthly Net Generation for Broadway 2 - Tucson Phase II
Broadway 2 - Tucson Phase II Details
Summary Information | |
---|---|
Plant Name | Broadway 2 - Tucson Phase II (64580) |
Plant Address | 14199 W Mile Wide Rd., Tucson, AZ 85714 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 32.24817, -111.2611 |
Generation Dates on File | Jan 2020 to Dec 2024 |
Initial Operation Date | December 2013 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-187 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Tucson Electric Power Company (TEPC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Arizona Electric Pwr Coop Inc (796) |
Grid Voltage | 24.90 kV |
Energy Storage | No |
Generator GEN Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 3.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Broadway 2 - Tucson Phase II Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Solar Star Arizona IV LLC | 750 Park of Commerce Blvd, Boca Raton, FL 33487 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5130 | Studenski Community Solar LLC CSG | Sauk Rapids, MN | 2.0 GWh |
#5131 | Pierre Solar | Pierre, SD | 2.0 GWh |
#5132 | USS Dubhe Solar CSG | North Branch, MN | 2.0 GWh |
#5133 | Oak Leaf Solar XXIV LLC (CSG) | Watkins, CO | 2.0 GWh |
#5134 | Hertzberg Community (CSG) | Paynesville, MN | 2.0 GWh |
#5135 | Perdue Bridgeville Photovoltaic | Bridgeville, DE | 2.0 GWh |
#5136 | Westminster Renewables, LLC CSG | Westminster, MA | 2.0 GWh |
#5137 | Lowry CSG2, LLC | Glenwood, MN | 2.0 GWh |
#5138 | USS Franklin Solar LLC | Franklin, MN | 2.0 GWh |
#5139 | Andresen Solar | Clara City, MN | 2.0 GWh |
#5141 | Salt Palace Solar Gen Plant | Salt Lake City, UT | 2.0 GWh |
#5142 | Pivot Solar 15 LLC (CSG) | Brush, CO | 2.0 GWh |
#5143 | Homer Street East | Olean, NY | 2.0 GWh |
#5144 | 4 Applegate Solar LLC | Robbinsville, NJ | 2.0 GWh |
#5145 | Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh |
#5146 | Ace Solar | Piedmont, SC | 2.0 GWh |
#5147 | Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh |
#5148 | Bizer Creek | Getzville, NY | 2.0 GWh |
#5149 | USS Wells Creek Solar LLC | Goodhue, MN | 2.0 GWh |
#5150 | Silver City WWTP PV Project | Silver City, NM | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broadway 2 - Tucson Phase II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh | 23.7 mi |
Amphitheater High School Solar | Tucson, AZ | 1.8 GWh | 16.8 mi |
Avra Valley Solar | Marana, AZ | 62.5 GWh | 8.6 mi |
Broadway 3 - Tucson Phase I | Tucson, AZ | 1.6 GWh | 0 mi |
Canyon Del Oro High School Solar | Oro Valley, AZ | 2.4 GWh | 18.9 mi |
Cogeneration 1 | Tucson, AZ | 48.0 GWh | 18.1 mi |
Cogeneration 2 | Tucson, AZ | 40.6 GWh | 18.3 mi |
Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 30.2 GWh | 21.7 mi |
Demoss Petrie | Tucson, AZ | 2.5 GWh | 15.7 mi |
H Wilson Sundt Generating Station | Tucson, AZ | 1.9 TWh | 21.7 mi |
North Loop | Tucson, AZ | 2.5 GWh | 13.2 mi |
Picture Rocks Solar, LLC | Marana, AZ | 49.8 GWh | 8.5 mi |
Pima Community College - East Campus | Tucson, AZ | 2.8 GWh | 17.3 mi |
Pima Community College NW | Tucson, AZ | 3.1 GWh | 15.1 mi |
Raptor Ridge | Tucson, AZ | 33.8 GWh | 23.5 mi |
Red Rock | Red Rock, AZ | 84.1 GWh | 21 mi |
Roger Road WWTP | Tucson, AZ | 1.1 GWh | 13.6 mi |
Saguaro | Red Rock, AZ | 135.2 GWh | 21.1 mi |
Serrano | Marana, AZ | 73.7 GWh | 17.7 mi |
TJX Tucson | Tucson, AZ | 2.2 GWh | 22 mi |