Broadway 2 - Tucson Phase II
14199 W Mile Wide Rd., Tucson, AZ 85714Plant Summary Information
Broadway 2 - Tucson Phase II is ranked #71 out of 99 solar farms in Arizona in terms of total annual net electricity generation.
Broadway 2 - Tucson Phase II generated 1.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Broadway 2 - Tucson Phase II |
---|---|
Utility Name | MN8 Energy LLC |
Location | Pima County, AZ |
Initial Operation Date | December 2013 |
Last Update | Dec 2022 |
Annual Generation | 5.4 GWh |
Annual Consumption | 20.0 k MMBtu |
Ranked #7,477 out of 11,471 Power Plants Nationwide | |
Ranked #2,549 out of 5,188 Solar Power Plants Nationwide | |
Ranked #119 out of 151 Arizona Power Plants | |
Ranked #71 out of 99 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2022) |
Map of Broadway 2 - Tucson Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broadway 2 - Tucson Phase II.
Monthly Net Generation for Broadway 2 - Tucson Phase II
Broadway 2 - Tucson Phase II Details
Summary Information | |
---|---|
Plant Name | Broadway 2 - Tucson Phase II (64580) |
Plant Address | 14199 W Mile Wide Rd. Tucson, AZ 85714 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 32.24817, -111.2611 |
Generation Dates on File | Jan 2020 to Dec 2022 |
Initial Operation Date | December 2013 |
Annual Generation | 5.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-187 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Tucson Electric Power Company (TEPC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Arizona Electric Pwr Coop Inc (796) |
Grid Voltage | 24.90 kV |
Energy Storage | No |
Generator GEN Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 3.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Broadway 2 - Tucson Phase II Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Solar Star Arizona IV LLC | 750 Park of Commerce Blvd, Boca Raton, FL 33487 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2539 | Ware Palmer Road Solar LLC CSG | Ware, MA | 5.4 GWh |
#2540 | Porter Way Community Solar Garden | Waconia, MN | 5.4 GWh |
#2541 | Fort Indiantown Gap | Annville, PA | 5.4 GWh |
#2542 | TES Rowtier | Westminster, MA | 5.4 GWh |
#2543 | Hales Mills Solar, LLC | Johnstown, NY | 5.4 GWh |
#2544 | Westside Solar Power PV1 | Lemoore, CA | 5.4 GWh |
#2545 | SSI West Riverside Landfill LLC | Riverside, CA | 5.4 GWh |
#2546 | Lindstrom Solar CSG | Lindstrom, MN | 5.4 GWh |
#2547 | Montague Road Solar | Amherst, MA | 5.4 GWh |
#2548 | Beaver Run | Lafayette Township, NJ | 5.4 GWh |
#2550 | Antares Community Solar | Tracy, MN | 5.4 GWh |
#2551 | Greenfield Solar Park | Greenfield, IN | 5.4 GWh |
#2552 | Soul City Solar | Norlina, NC | 5.4 GWh |
#2553 | Ku'ia Solar | Lahaina, HI | 5.4 GWh |
#2554 | IVC Solar | Imperial, CA | 5.4 GWh |
#2555 | Kearsarge Bellingham PV | Bellingham, MA | 5.3 GWh |
#2556 | Turnipseed Solar, LLC | Douglasville, GA | 5.3 GWh |
#2557 | Black Eagle Solar, LLC | Black Eagle, MT | 5.3 GWh |
#2558 | Imboden Solar Garden | Watkins, CO | 5.3 GWh |
#2559 | North Palm Springs 1A | Palm Springs, CA | 5.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broadway 2 - Tucson Phase II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Actus Lend Lease DMAFB | Tucson, AZ | 4.1 GWh | 23.7 mi |
Amphitheater High School Solar | Tucson, AZ | 2.2 GWh | 16.8 mi |
Avalon Solar | Pima, AZ | 77.5 GWh | 24.5 mi |
Avra Valley Solar | Marana, AZ | 66.9 GWh | 8.6 mi |
Broadway 3 - Tucson Phase I | Tucson, AZ | 2.0 GWh | 0 mi |
Canyon Del Oro High School Solar | Oro Valley, AZ | 2.6 GWh | 18.9 mi |
Cogeneration 1 | Tucson, AZ | 60.4 GWh | 18.1 mi |
Cogeneration 2 | Tucson, AZ | 41.0 GWh | 18.3 mi |
Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 28.8 GWh | 21.7 mi |
Demoss Petrie | Tucson, AZ | 868.8 MWh | 15.7 mi |
H Wilson Sundt Generating Station | Tucson, AZ | 1.4 TWh | 21.7 mi |
North Loop | Tucson, AZ | 22.0 GWh | 13.2 mi |
Picture Rocks Solar, LLC | Marana, AZ | 55.0 GWh | 8.5 mi |
Pima Community College - East Campus | Tucson, AZ | 3.1 GWh | 17.3 mi |
Pima Community College NW | Tucson, AZ | 3.2 GWh | 15.1 mi |
Raptor Ridge | Tucson, AZ | 18.6 GWh | 23.5 mi |
Red Rock | Red Rock, AZ | 41.9 GWh | 21 mi |
Roger Road WWTP | Tucson, AZ | 1.2 GWh | 13.6 mi |
Saguaro | Red Rock, AZ | 89.1 GWh | 21.1 mi |
Valencia Solar | Tucson, AZ | 27.2 GWh | 24.1 mi |