Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| De Sabla | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 23.0 GWh | Jan 1963 | Dec 2024 | Water |
| Rock Creek | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 597.6 GWh | Feb 1950 | Dec 2025 | Water |
| Poe | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 361.2 GWh | Sep 1958 | Dec 2025 | Water |
| Pit 7 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 438.7 GWh | Aug 1965 | Dec 2025 | Water |
| Pit 6 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 242.3 GWh | Jul 1965 | Dec 2024 | Water |
| Cresta | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 338.1 GWh | Oct 1949 | Dec 2024 | Water |
| Coleman PH | Pacific Gas & Electric Co. | Anderson, CA | California Independent System Operator (CISO) | 26.6 GWh | May 1979 | Dec 2024 | Water |
| Pit 5 | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 541.0 GWh | Mar 1944 | Dec 2025 | Water |
| Caribou 1 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 221.0 GWh | May 1921 | Dec 2024 | Water |
| Phoenix | Pacific Gas & Electric Co. | Sonora, CA | California Independent System Operator (CISO) | 8.0 GWh | Jan 1940 | Oct 2024 | Water |
| Spaulding 1 | Pacific Gas & Electric Co. | Emigrant Gap, CA | California Independent System Operator (CISO) | 17.6 GWh | Apr 1928 | Dec 2024 | Water |
| South | Pacific Gas & Electric Co. | Manton, CA | California Independent System Operator (CISO) | 13.1 GWh | Nov 1979 | Dec 2024 | Water |
| Drum 1 | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 46.4 GWh | Oct 1913 | Oct 2024 | Water |
| Bucks Creek | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 96.0 GWh | Feb 1928 | Mar 2024 | Water |
| Butt Valley | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 149.3 GWh | Nov 1958 | Dec 2024 | Water |
| Salt Springs | Pacific Gas & Electric Co. | Pioneer, CA | California Independent System Operator (CISO) | 107.7 GWh | May 1931 | Dec 2024 | Water |
| Pit 4 | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 396.6 GWh | Jun 1955 | Dec 2025 | Water |
| Kerckhoff 2 | Pacific Gas & Electric Co. | Auberry, CA | California Independent System Operator (CISO) | 418.6 GWh | Apr 1983 | Dec 2025 | Water |
| Caribou 2 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 442.3 GWh | Oct 1958 | Dec 2025 | Water |
| Volta 2 | Pacific Gas & Electric Co. | Manton, CA | California Independent System Operator (CISO) | 3.1 GWh | Oct 1981 | Dec 2024 | Water |
| Diablo Canyon | Pacific Gas & Electric Co. | Avila Beach, CA | California Independent System Operator (CISO) | 17.6 TWh | Apr 1985 | Dec 2025 | Nuclear |
| Coffin Butte | Pacific Northwest Generating Coop | Corvallis, OR | Bonneville Power Administration (BPAT) | 38.4 GWh | Sep 1995 | Dec 2024 | Landfill Gas |
| Tipton 1 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tipton 2 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 83.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Foote Creek Rim | PacifiCorp | McFadden, WY | PacifiCorp East (PACE) | 636.2 GWh | Nov 2024 | Dec 2025 | Wind |
| Huntington | PacifiCorp | Huntington, UT | PacifiCorp East (PACE) | 4.3 TWh | Jun 1974 | Dec 2025 | Bituminous Coal |
| Jim Bridger | PacifiCorp | Point of Rocks, WY | PacifiCorp East (PACE) | 7.6 TWh | Oct 1974 | Dec 2025 | Subbituminous Coal : 64.2% Natural Gas : 35.7% |
| Naughton | PacifiCorp | Kemmerer, WY | PacifiCorp East (PACE) | 2.3 TWh | Apr 1963 | Dec 2025 | Subbituminous Coal : 73.9% Natural Gas : 26.1% |
| Wyodak | PacifiCorp | Gillette, WY | PacifiCorp East (PACE) | 2.1 TWh | Aug 1978 | Dec 2025 | Subbituminous Coal : 99.9% |
| John C Boyle | PacifiCorp | Keno, OR | PacifiCorp West (PACW) | 186.6 GWh | Sep 1958 | Jan 2024 | Water |
| Fish Creek | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 31.7 GWh | May 1952 | Dec 2024 | Water |
| Eagle Point | PacifiCorp | Eagle Point, OR | PacifiCorp West (PACW) | 14.6 GWh | Oct 1957 | Dec 2024 | Water |
| Bend | PacifiCorp | Bend, OR | PacifiCorp West (PACW) | 1.1 GWh | Jun 1913 | Dec 2024 | Water |
| Dave Johnston | PacifiCorp | Glen Rock, WY | PacifiCorp East (PACE) | 4.3 TWh | Jan 1959 | Dec 2025 | Subbituminous Coal : 99.8% |
| Clearwater 2 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 34.7 GWh | Oct 1953 | Dec 2024 | Water |
| Lemolo 1 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 105.2 GWh | Jun 1955 | Dec 2024 | Water |
| Clearwater 1 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 32.2 GWh | May 1953 | Dec 2024 | Water |
| Lemolo 2 | PacifiCorp | Toketee Falls, OR | PacifiCorp West (PACW) | 62.7 GWh | Oct 1956 | Dec 2024 | Water |
| Swift 1 | PacifiCorp | Cougar, WA | PacifiCorp West (PACW) | 534.7 GWh | Nov 1958 | Dec 2025 | Water |
| Cutler Hydro | PacifiCorp | Collinston, UT | PacifiCorp East (PACE) | 86.6 GWh | Jun 1927 | Dec 2024 | Water |
| Gadsby | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 229.9 GWh | Aug 1951 | Dec 2025 | Natural Gas |
| Hunter | PacifiCorp | Castle Dale, UT | PacifiCorp East (PACE) | 6.8 TWh | May 1978 | Dec 2025 | Bituminous Coal : 99.8% |
| Wallowa Falls | PacifiCorp | Joseph, OR | PacifiCorp West (PACW) | 2.5 GWh | Jun 1921 | Dec 2024 | Water |
| Toketee Falls | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 184.1 GWh | Nov 1949 | Dec 2024 | Water |
| Granite | PacifiCorp | Salt lake City, UT | PacifiCorp East (PACE) | 5.2 GWh | Jul 1896 | Dec 2024 | Water |
| Prospect 1 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 2.2 GWh | Dec 1911 | Jun 2024 | Water |
| Prospect 2 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 193.1 GWh | Dec 1927 | Dec 2024 | Water |
| Prospect 4 | PacifiCorp | Prospect, OR | PacifiCorp West (PACW) | 417.0 MWh | Oct 1944 | Dec 2024 | Water |
| Slide Creek | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 62.8 GWh | Jun 1951 | Dec 2024 | Water |
| Pioneer | PacifiCorp | Ogden, UT | PacifiCorp East (PACE) | 18.3 GWh | May 1910 | Dec 2024 | Water |
| Stairs | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 3.2 GWh | Jun 1912 | Dec 2024 | Water |
| Soda Springs | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 48.9 GWh | Feb 1952 | Dec 2024 | Water |
| Big Fork | PacifiCorp | Big Fork, MT | PacifiCorp East (PACE) | 21.3 GWh | Jun 1910 | Dec 2024 | Water |
| Merwin | PacifiCorp | Ariel, WA | PacifiCorp West (PACW) | 467.3 GWh | Jun 1931 | Dec 2024 | Water |
| Yale | PacifiCorp | Amboy, WA | PacifiCorp West (PACW) | 488.4 GWh | Aug 1953 | Dec 2024 | Water |
| Pryor Mountain Wind | PacifiCorp | Bridger, MT | PacifiCorp East (PACE) | 750.8 GWh | Mar 2021 | Dec 2025 | Wind |
| Foote Creek I | PacifiCorp | McFadden, WY | PacifiCorp East (PACE) | 215.5 GWh | Mar 1999 | Dec 2023 | Wind |
| Foote Creek III | PacifiCorp | McFadden, WY | PacifiCorp East (PACE) | 14.6 GWh | May 1999 | Dec 2023 | Wind |
| Foote Creek IV | PacifiCorp | Rock River, WY | PacifiCorp East (PACE) | 11.6 GWh | Jul 2000 | Dec 2023 | Wind |
| Chehalis Generating Facility | PacifiCorp | Chehalis, WA | Bonneville Power Administration (BPAT) | 2.3 TWh | Jul 2003 | Dec 2025 | Natural Gas |
| Currant Creek | PacifiCorp | Mona, UT | PacifiCorp East (PACE) | 2.8 TWh | May 2005 | Dec 2025 | Natural Gas |
| Marengo Wind Plant | PacifiCorp | Dayton, WA | PacifiCorp West (PACW) | 692.7 GWh | Jul 2007 | Dec 2024 | Wind |
| McFadden Ridge | PacifiCorp | Rock River, WY | PacifiCorp East (PACE) | 84.1 GWh | Sep 2009 | Dec 2024 | Wind |
| High Plains | PacifiCorp | Rock River, WY | PacifiCorp East (PACE) | 274.1 GWh | Aug 2009 | Dec 2024 | Wind |
| Leaning Juniper | PacifiCorp | Arlington, OR | Bonneville Power Administration (BPAT) | 275.2 GWh | Sep 2006 | Dec 2024 | Wind |
| Goodnoe Hills | PacifiCorp | Goldendale, WA | Bonneville Power Administration (BPAT) | 275.5 GWh | May 2008 | Dec 2024 | Wind |
| Glenrock | PacifiCorp | Glenrock, WY | PacifiCorp East (PACE) | 401.0 GWh | Nov 2008 | Dec 2024 | Wind |
| Rolling Hills | PacifiCorp | Glenrock, WY | PacifiCorp East (PACE) | 244.8 GWh | Dec 2008 | Dec 2024 | Wind |
| Seven Mile Hill | PacifiCorp | Medicine Bow, WY | PacifiCorp East (PACE) | 399.8 GWh | Nov 2008 | Dec 2024 | Wind |
| Lake Side Power Plant | PacifiCorp | Vineyard, UT | PacifiCorp East (PACE) | 6.0 TWh | Aug 2007 | Dec 2025 | Natural Gas |
| Cedar Springs II | PacifiCorp | Douglas, WY | PacifiCorp East (PACE) | 652.4 GWh | Nov 2020 | Dec 2025 | Wind |
| Blundell | PacifiCorp | Milford, UT | PacifiCorp East (PACE) | 272.5 GWh | Jun 1984 | Dec 2024 | Geothermal |
| Copco 1 | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 70.4 GWh | Dec 1917 | Jan 2024 | Water |
| Fall Creek | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 6.0 GWh | Aug 1903 | Dec 2024 | Water |
| Last Chance | PacifiCorp | Grace, ID | PacifiCorp East (PACE) | 4.5 GWh | Jan 1984 | Dec 2024 | Water |
| Iron Gate | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 76.4 GWh | Jan 1962 | Jan 2024 | Water |
| Soda | PacifiCorp | Soda Springs, ID | PacifiCorp East (PACE) | 19.1 GWh | Jun 1924 | Dec 2024 | Water |
| Oneida | PacifiCorp | Riverdale, ID | PacifiCorp East (PACE) | 42.0 GWh | Jun 1915 | Dec 2024 | Water |
| Grace | PacifiCorp | Grace, ID | PacifiCorp East (PACE) | 88.1 GWh | Jun 1923 | Dec 2024 | Water |
| Ashton | PacifiCorp | Ashton, ID | PacifiCorp East (PACE) | 32.6 GWh | Jun 1917 | Dec 2024 | Water |
| Dunlap | PacifiCorp | Medicine Bow, WY | PacifiCorp East (PACE) | 366.5 GWh | Sep 2010 | Dec 2024 | Wind |
| Black Cap Solar Plant | PacifiCorp | Lakeview, OR | PacifiCorp West (PACW) | 3.9 GWh | Sep 2012 | Dec 2024 | Solar |
| Ekola Flats | PacifiCorp | Hanna, WY | PacifiCorp East (PACE) | 736.1 GWh | Nov 2020 | Dec 2025 | Wind |
| TB Flats | PacifiCorp | Medicine Bow, WY | PacifiCorp East (PACE) | 1.4 TWh | Sep 2021 | Dec 2025 | Wind |
| Rock Creek Wind | PacifiCorp | McFadden, WY | PacifiCorp East (PACE) | 212.2 GWh | - | Dec 2025 | Wind |
| Packaging Corp of America | Packaging Corp of America | Counce, TN | Tennessee Valley Authority (TVA) | 430.1 GWh | Jan 1985 | Dec 2025 | Black Liquor : 59.3% Wood/Wood Waste Solids : 21.7% Natural Gas : 18.9% |
| DeRidder Mill | Packaging Corporation of America | DeRidder, LA | Midcontinent Independent System Operator, Inc. (MISO) | 402.4 GWh | Sep 1969 | Dec 2024 | Black Liquor : 46.7% Wood/Wood Waste Solids : 34.3% Natural Gas : 18.9% |
| PPS Power Plant No 1 | Paducah Power System | Paducah, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 109.4 GWh | May 2010 | Dec 2024 | Natural Gas |
| Page Solar | Page Solar Farm, LLC | Willow Spring, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Municipal Cogen Plant | Palm Springs City of | Palm Springs, CA | California Independent System Operator (CISO) | 6.2 GWh | Apr 1985 | Dec 2025 | Natural Gas |
| Palmer Community Solar LLC CSG | Palmer Community Solar LLC | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2021 | Dec 2024 | Solar |
| Curtis Palmer Hydroelectric | Palmer Hydroelectric | Corinth, NY | New York Independent System Operator (NYIS) | 326.5 GWh | Sep 1985 | Dec 2024 | Water |
| Palmer's Creek Wind Farm, LLC | Palmer's Creek Wind Farm, LLC | Granite Falls, MN | Southwest Power Pool (SWPP) | 135.3 GWh | Nov 2018 | Dec 2025 | Wind |
| Oakboro Farm | Palmetto Power Management LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 8.4 GWh | Aug 2014 | Dec 2024 | Solar |
| Market Farm | Palmetto Power Management LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 7.9 GWh | Sep 2014 | Dec 2024 | Solar |
| Dixon Dairy Road Solar | Palmetto Power Management LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Nov 2011 | Dec 2024 | Solar |
| Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Yanceyville Farm | Palmetto Power Management LLC | Blanch, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Mile Farm | Palmetto Power Management LLC | Rougemont, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | May 2014 | Dec 2024 | Solar |
| Watts Farm | Palmetto Power Management LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Jun 2012 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on December 2025 generation numbers.| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,766.12 GWh |
| Alaska | # 48 | 139 | 625.46 GWh |
| Arizona | # 16 | 183 | 8,962.31 GWh |
| Arkansas | # 29 | 114 | 5,525.50 GWh |
| California | # 5 | 1,683 | 14,393.99 GWh |
| Colorado | # 31 | 297 | 4,649.38 GWh |
| Connecticut | # 34 | 162 | 4,087.83 GWh |
| Delaware | # 49 | 33 | 469.96 GWh |
| District of Columbia | # 51 | 16 | 14.80 GWh |
| Florida | # 3 | 333 | 19,379.32 GWh |
| Georgia | # 8 | 248 | 12,492.24 GWh |
| Hawaii | # 46 | 70 | 814.97 GWh |
| Idaho | # 41 | 146 | 2,123.12 GWh |
| Illinois | # 4 | 379 | 17,546.79 GWh |
| Indiana | # 13 | 214 | 9,789.95 GWh |
| Iowa | # 20 | 293 | 7,310.28 GWh |
| Kansas | # 28 | 183 | 5,586.75 GWh |
| Kentucky | # 22 | 60 | 6,716.43 GWh |
| Louisiana | # 17 | 84 | 8,587.03 GWh |
| Maine | # 45 | 215 | 1,484.81 GWh |
| Maryland | # 37 | 203 | 3,225.85 GWh |
| Massachusetts | # 43 | 640 | 2,073.13 GWh |
| Michigan | # 11 | 269 | 11,734.82 GWh |
| Minnesota | # 27 | 764 | 5,712.30 GWh |
| Mississippi | # 24 | 56 | 6,090.79 GWh |
| Missouri | # 23 | 125 | 6,623.76 GWh |
| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,639.28 GWh |
| Nebraska | # 36 | 125 | 3,667.32 GWh |
| Nevada | # 38 | 114 | 3,217.22 GWh |
| New Hampshire | # 44 | 56 | 1,878.83 GWh |
| New Jersey | # 30 | 387 | 5,182.27 GWh |
| New Mexico | # 35 | 142 | 3,818.41 GWh |
| New York | # 10 | 950 | 11,800.05 GWh |
| North Carolina | # 9 | 904 | 12,153.04 GWh |
| North Dakota | # 33 | 58 | 4,218.72 GWh |
| Ohio | # 6 | 198 | 13,425.53 GWh |
| Oklahoma | # 18 | 141 | 7,637.23 GWh |
| Oregon | # 21 | 272 | 6,788.64 GWh |
| Pennsylvania | # 2 | 252 | 22,539.49 GWh |
| Rhode Island | # 47 | 100 | 775.70 GWh |
| South Carolina | # 15 | 207 | 8,967.44 GWh |
| South Dakota | # 42 | 52 | 2,122.20 GWh |
| Tennessee | # 19 | 88 | 7,328.17 GWh |
| Texas | # 1 | 947 | 46,150.81 GWh |
| Utah | # 39 | 125 | 2,845.12 GWh |
| Vermont | # 50 | 116 | 189.85 GWh |
| Virginia | # 14 | 237 | 9,421.16 GWh |
| Washington | # 12 | 135 | 10,635.09 GWh |
| West Virginia | # 26 | 39 | 5,763.55 GWh |
| Wisconsin | # 25 | 243 | 5,804.32 GWh |
| Wyoming | # 32 | 70 | 4,436.68 GWh |