Orchard Ranch Solar
E. Orchard Ranch Ln, Orchard, ID 83650Plant Summary Information
Orchard Ranch Solar is ranked #11 out of 13 solar farms in Idaho in terms of total annual net electricity generation.
Orchard Ranch Solar generated 9.6 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Orchard Ranch Solar |
---|---|
Utility Name | Orchard Ranch Solar, LLC |
Location | Ada County, ID |
Initial Operation Date | March 2017 |
Last Update | Apr 2025 |
Annual Generation | 43.5 GWh |
Annual Consumption | 161.7 k MMBtu |
Ranked #4,185 out of 12,299 Power Plants Nationwide | |
Ranked #990 out of 6,182 Solar Power Plants Nationwide | |
Ranked #71 out of 140 Idaho Power Plants | |
Ranked #11 out of 13 Idaho Solar Power Plants | |
Fuel Types | Solar |
Map of Orchard Ranch Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orchard Ranch Solar.
Monthly Net Generation for Orchard Ranch Solar
Orchard Ranch Solar Details
Summary Information | |
---|---|
Plant Name | Orchard Ranch Solar (60010) |
Plant Address | E. Orchard Ranch Ln, Orchard, ID 83650 |
Utility | Orchard Ranch Solar, LLC (59756) |
Latitude, Longitude | 43.467, -116.285 |
Generation Dates on File | Mar 2017 to Apr 2025 |
Initial Operation Date | March 2017 |
Annual Generation | 43.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 17-65-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Idaho Power Company (IPCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Idaho Power Co (9191) ID |
Grid Voltage | 34.50 kV / 138.00 kV |
Energy Storage | No |
Generator IPOR Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Orchard Ranch Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#980 | Chino Valley Solar | Chino Valley, AZ | 41.0 GWh |
#981 | American Falls Solar II | American Falls, ID | 44.2 GWh |
#982 | Arbor Hill Solar | Greenfield, IA | 44.1 GWh |
#983 | Kimmel Road Solar, LLC | Du Quoin, IL | 44.1 GWh |
#984 | Fort Gordon Solar Facility | Fort Gordon, GA | 44.0 GWh |
#985 | Gaston Solar Power Plant | Cherryville Township, NC | 43.9 GWh |
#986 | Avalon Solar II | Sahuarita, AZ | 43.8 GWh |
#987 | Rawhide Prairie Solar Hybrid | Wellington, CO | 43.7 GWh |
#988 | Calverton Solar Energy Center | Calverton, NY | 43.7 GWh |
#989 | Pavant Solar III | Filmore, UT | 43.6 GWh |
#991 | Baldwin Solar BESS | Baldwin, IL | 43.4 GWh |
#992 | SR Arlington I | Arlington, GA | 43.5 GWh |
#993 | Alton Post Office Solar | Alton, VA | 43.4 GWh |
#994 | Greater Sandhill I | Mosca, CO | 43.4 GWh |
#995 | Tinton Falls Solar Farm | Tinton Falls, NJ | 43.3 GWh |
#996 | Rice Creek | Putnam, FL | 43.1 GWh |
#997 | Adams Nielson Solar | Lind, WA | 43.1 GWh |
#998 | Creston Solar (50 MW) | Creston, IA | 42.9 GWh |
#999 | Energix Leatherwood, LLC | Axton, VA | 42.3 GWh |
#1000 | Cameron Solar | Cameron, SC | 42.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orchard Ranch Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amalgamated Sugar LLC Nampa | Nampa, ID | 49.3 GWh | 17.4 mi |
Arrowrock Hydroelectric Project | Boise, ID | 73.0 GWh | 20.2 mi |
Barber Dam | Boise, ID | 6.7 GWh | 10.5 mi |
Bennett Mountain | Mountain Home, ID | 919.1 GWh | 38.1 mi |
Black Canyon | Emmet, ID | 58.8 GWh | 32.9 mi |
Boise R Diversion | Boise, ID | 7.9 GWh | 10.8 mi |
Evander Andrews Power Complex | Mountain Home, ID | 1.1 TWh | 34.1 mi |
Fargo Drop | Wilder, ID | 3.8 GWh | 32.7 mi |
Grand View Solar Two | Grand View, ID | 182.0 GWh | 34.4 mi |
Hidden Hollow Energy | Boise, ID | 18.1 GWh | 15.9 mi |
Horseshoe Bend Hydroelectric Co | Horseshoe Bend, ID | 42.0 GWh | 30.3 mi |
ID Solar | Kuna, ID | 85.3 GWh | 2.9 mi |
Lucky Peak Power Plant Project | Boise, ID | 290.6 GWh | 12.1 mi |
Matrix Pleasant Valley | Boise, ID | 90.2 GWh | 18.7 mi |
MC6 Hydro Facility | Kuna, ID | 7.3 GWh | 3.7 mi |
Mora Drop Hydroelectric Project | Kuna, ID | 4.3 GWh | 9.4 mi |
Mt. Home Solar 1, LLC | Pocatello, ID | 47.2 GWh | 35.5 mi |
Murphy Flat Solar | Murphy, ID | 39.4 GWh | 19.2 mi |
Simcoe Solar | Mountain Home, ID | 47.9 GWh | 20.6 mi |
Swan Falls | Kuna, ID | 121.9 GWh | 16.1 mi |