Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Bladenboro Solar 2 | SunStrong Management | Bladenboro, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Jul 2018 | Dec 2025 | Solar |
| Chowan Jehu Solar | SunStrong Management | Tyner, NC | PJM Interconnection, LLC (PJM) | 7.6 GWh | Jan 2018 | Dec 2025 | Solar |
| TWE Bowman Solar Project | SunStrong Management | Bowman, SC | Dominion Energy South Carolina, Inc. (SCEG) | 136.5 GWh | Apr 2020 | May 2026 | Solar |
| Sandy Solar | SunStrong Management | Shiloh Township, NC | PJM Interconnection, LLC (PJM) | 8.4 GWh | Feb 2018 | Oct 2025 | Solar |
| Atkinson Solar II | SunStrong Management | Beulaville, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Sep 2018 | Dec 2025 | Solar |
| Quarter Horse Solar | SunStrong Management | Hampstead, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Oct 2018 | Dec 2025 | Solar |
| Shiloh Hwy Solar | SunStrong Management | Shiloh, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Alpha Value Solar | SunStrong Management | Hertford, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Oakwood Solar | SunStrong Management | Mebane, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | May 2021 | Dec 2025 | Solar |
| Sawtell Solar | SunStrong Management | Hendersonville, NC | Duke Energy Carolinas (DUK) | 5.0 GWh | Mar 2021 | Dec 2025 | Solar |
| Southwick Solar | SunStrong Management | Graham, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Saw Solar | SunStrong Management | China Grove, NC | Duke Energy Carolinas (DUK) | 10.6 GWh | May 2022 | Dec 2025 | Solar |
| Overman Solar | SunStrong Management | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Banner Solar | SunStrong Management | Benson, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Beulah Solar | SunStrong Management | Batesburg, SC | Dominion Energy South Carolina, Inc. (SCEG) | 149.0 GWh | Apr 2022 | May 2026 | Solar |
| Millers Chapel Solar | SunStrong Management | La Grange, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2021 | Dec 2025 | Solar |
| Brick City Solar | SunStrong Management | Wallace, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Clovelly Solar | SunStrong Management | Lillington, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Coogee Solar | SunStrong Management | Grantsboro, NC | Duke Energy Progress East (CPLE) | 10.7 GWh | Nov 2021 | Dec 2025 | Solar |
| ESA Albemarle NC Solar | SunStrong Management | Albemarle, NC | Duke Energy Carolinas (DUK) | 4.2 GWh | Mar 2021 | Dec 2025 | Solar |
| Cubera Solar, LLC | SunStrong Management | Dunn, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | Dec 2019 | Dec 2025 | Solar |
| Spring Hope Solar 3, LLC | SunStrong Management | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| ESA Four Oaks 2 NC LLC | SunStrong Management | Four Oaks, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Trent River Solar, LLC | SunStrong Management | Pollocksville, NC | Duke Energy Progress East (CPLE) | 135.5 GWh | Jun 2021 | May 2026 | Solar |
| Sugar Solar, LLC | SunStrong Management | Yadkinville, NC | Duke Energy Carolinas (DUK) | 100.9 GWh | Nov 2021 | May 2026 | Solar |
| Centerfield Cooper Solar, LLC | SunStrong Management | Chesterfield, SC | South Carolina Public Service Authority (SC) | 145.2 GWh | Nov 2020 | May 2026 | Solar |
| Lick Creek Solar, LLC | SunStrong Management | Walnut Cove, NC | Duke Energy Carolinas (DUK) | 108.1 GWh | Feb 2022 | May 2026 | Solar |
| Highest Power Solar, LLC | SunStrong Management | Louisburg, NC | Duke Energy Progress East (CPLE) | 98.6 GWh | Jan 2022 | May 2026 | Solar |
| Bighorn Solar | SunStrong Management | Salem, OR | Portland General Electric Company (PGE) | 3.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Drift Creek Solar | SunStrong Management | Silverton, OR | Portland General Electric Company (PGE) | 3.1 GWh | Apr 2020 | Dec 2025 | Solar |
| Minke Solar | SunStrong Management | Molalla, OR | Portland General Electric Company (PGE) | 3.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Brush Creek Solar | SunStrong Management | Silverton, OR | Portland General Electric Company (PGE) | 3.1 GWh | Apr 2020 | Dec 2025 | Solar |
| Mohea Solar Energy Center, LLC | SunStrong Management | Gaffney, SC | Duke Energy Carolinas (DUK) | 8.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Pika Solar | SunStrong Management | Mt. Angel, OR | Portland General Electric Company (PGE) | 3.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Scotch Bonnet Solar, LLC | SunStrong Management | St Helena, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Nov 2020 | Dec 2025 | Solar |
| ESA Hamlet NC , LLC | SunStrong Management | Hamlet, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | May 2020 | Dec 2025 | Solar |
| Cash Solar | SunStrong Management | Nashville, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Nov 2020 | Dec 2025 | Solar |
| BRE NC Solar 3 | SunStrong Management | Oxford, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Robin Solar | SunStrong Management | Dudley, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Dec 2020 | Dec 2025 | Solar |
| St. Matthews Solar | SunStrong Management | Matthews, SC | Dominion Energy South Carolina, Inc. (SCEG) | 16.6 GWh | Jul 2017 | Dec 2025 | Solar |
| Soluga Farms IV | SunStrong Management | Godwin, NC | Southeastern Power Administration (SEPA) | 5.3 GWh | Aug 2018 | Dec 2025 | Solar |
| Pine Valley Solar Farm, LLC | SunStrong Management | West End, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Apr 2022 | Dec 2025 | Solar |
| High Shoals PV1 | SunStrong Management | High Shoals, NC | Duke Energy Carolinas (DUK) | 30.7 GWh | Mar 2022 | Dec 2025 | Solar |
| Hollister Wastewater Facility | SunStrong Management, LLC | Hollister, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2011 | Dec 2025 | Solar |
| OYA Robinson Road | SunStrong Management, LLC | Orleans, NY | New York Independent System Operator (NYIS) | 10.2 GWh | May 2022 | Dec 2025 | Solar |
| OYA State Route 122 | SunStrong Management, LLC | Constable, NY | New York Independent System Operator (NYIS) | 10.1 GWh | Nov 2021 | Dec 2025 | Solar |
| OYA Pulaski | SunStrong Management, LLC | Pulaski, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Oct 2022 | Dec 2025 | Solar |
| OYA Wayside Drive | SunStrong Management, LLC | Watertown, NY | New York Independent System Operator (NYIS) | 10.4 GWh | Sep 2022 | Dec 2025 | Solar |
| Phoenix Airport Rental Car Center | SunStrong Management, LLC | Phoenix, AZ | Arizona Public Service Company (AZPS) | 4.2 GWh | Nov 2012 | Dec 2025 | Solar |
| Phoenix Airport East Economy Lot | SunStrong Management, LLC | Phoenix, AZ | Arizona Public Service Company (AZPS) | 777.0 MWh | Nov 2012 | Dec 2025 | Solar |
| Beringer | SunStrong Management, LLC | Saint Helena, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2008 | Dec 2025 | Solar |
| ASTI | SunStrong Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2025 | Solar |
| Adirondack Solar | SunStrong Management, LLC | Ellenburg Center, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2018 | Dec 2024 | Solar |
| CF Novel Solar CSG Gardens Seven, LLC | SunStrong Management, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Nov 2017 | Dec 2025 | Solar |
| WrightSun CSG, LLC | SunStrong Management, LLC | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Dec 2017 | Dec 2025 | Solar |
| CGSun, LLC Community Solar | SunStrong Management, LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Nov 2017 | Dec 2025 | Solar |
| LeSun CSG, LLC | SunStrong Management, LLC | Waterville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Dec 2017 | Dec 2025 | Solar |
| CF Novel Solar CSG Gardens Five, LLC | SunStrong Management, LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Nov 2017 | Dec 2025 | Solar |
| PopeSun CSG, LLC | SunStrong Management, LLC | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Nov 2017 | Dec 2025 | Solar |
| Jefferson-Lewis BOCES Solar | SunStrong Management, LLC | Watertown, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2017 | Dec 2025 | Solar |
| CF Novel Solar CSG Gardens Eleven, LLC | SunStrong Management, LLC | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Nov 2017 | Dec 2025 | Solar |
| CF Novel Solar CSG Gardens Two, LLC | SunStrong Management, LLC | Minnesota Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Nov 2017 | Dec 2025 | Solar |
| Antanavica Solar | SunStrong Management, LLC | Leicester, MA | ISO New England (ISNE) | 1.4 GWh | Jul 2018 | Dec 2024 | Solar |
| Acer | SunStrong Management, LLC | Madrid, NY | New York Independent System Operator (NYIS) | 68.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Breezewood | SunStrong Management, LLC | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Buck Run | SunStrong Management, LLC | Clarkson, NY | New York Independent System Operator (NYIS) | 114.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Dakota | SunStrong Management, LLC | Rock City, IL | PJM Interconnection, LLC (PJM) | 82.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Galt | SunStrong Management, LLC | Sterling, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Grass River | SunStrong Management, LLC | Canton, NY | New York Independent System Operator (NYIS) | 1.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Meltwater | SunStrong Management, LLC | Manlius, NY | New York Independent System Operator (NYIS) | 7.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Walldog | SunStrong Management, LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 210.0 MWh | Oct 2024 | Dec 2024 | Solar |
| SV CSG Plato Solar 1 LLC | SunVest Solar LLC | Elgin, IL | PJM Interconnection, LLC (PJM) | 2.5 GWh | Jul 2025 | Dec 2025 | Solar |
| SV CSG Bishop 1 LLC | SunVest Solar LLC | Herrin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 106.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Schmidt CSG 1 | SunVest Solar LLC | Belleville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2024 | Dec 2025 | Solar |
| DeKalb Taylor LLC | SunVest Solar LLC | DeKalb, IL | PJM Interconnection, LLC (PJM) | 538.0 MWh | Oct 2025 | Dec 2025 | Solar |
| SV CSG Wagner B LLC | SunVest Solar LLC | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG Wagner A LLC | SunVest Solar LLC | Sparta, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Lawrence Solar 1 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG German Valley 1 LLC | SunVest Solar LLC | German Valley, IL | PJM Interconnection, LLC (PJM) | 2.3 GWh | May 2025 | Dec 2025 | Solar |
| Surbrook Solar, LLC | Surbrook Solar, LLC | Rives Junction, MI | Midcontinent Independent System Operator, Inc. (MISO) | 19.6 GWh | Aug 2024 | Dec 2025 | Solar |
| Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Sutton Solar 2, LLC CSG | Sutton Solar 2, LLC | Sutton, MA | ISO New England (ISNE) | 1.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Sutton Solar CSG | Sutton Solar, LLC | Sutton, MA | ISO New England (ISNE) | 3.2 GWh | Oct 2016 | Dec 2025 | Solar |
| SV CSG AFTON I | SV CSG Afton I, LLC | Afton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jun 2024 | Dec 2025 | Solar |
| SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Aug 2023 | Dec 2025 | Solar |
| SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2025 | Solar |
| SV CSG Barrass Farms II LL | SV CSG Barrass Farms II LLC | Marion, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 GWh | Aug 2023 | Dec 2025 | Solar |
| SV CSG Gander Farms 1 A | SV CSG Gander Farms 1 A, LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 188.0 MWh | Oct 2025 | Dec 2025 | Solar |
| SV Gardner 1 (Lutz) CSG | SV CSG Gardner 1 LLC | Gardner, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Oct 2021 | Dec 2025 | Solar |
| SV CSG Lily Lake 2 LLC | SV CSG Lily Lake 2 LLC | Maple Park, IL | PJM Interconnection, LLC (PJM) | 1.5 GWh | Nov 2020 | Dec 2025 | Solar |
| SV CSG Prophetstown 1 | SV CSG Prophetstown 1, LLC | Prophetstown, IL | PJM Interconnection, LLC (PJM) | 370.0 MWh | - | Dec 2025 | Solar |
| SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2025 | Solar |
| SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Sep 2023 | Dec 2025 | Solar |
| Svihel Community Solar LLC CSG | Svihel Community Solar LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Mar 2021 | Dec 2025 | Solar |
| Swan Garden | Swan Garden LLC | Villard, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2021 | Dec 2025 | Solar |
| Swansboro Solar, LLC | Swansboro Solar, LLC | Maysville, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Mar 2021 | Dec 2025 | Solar |
| Sweeny Cogen Facility | Sweeny Cogeneration LLC | Old Ocean, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.2 TWh | Jul 1997 | May 2026 | Natural Gas : 71.7% Other Gas : 28.3% |
| Sweet Tea Solar, LLC | Sweet Tea Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | Mar 2021 | Dec 2025 | Solar |
| Sweetland Wind Farm, LLC | Sweetland Wind Farm, LLC | St. Lawrence, SD | Southwest Power Pool (SWPP) | 830.5 GWh | Sep 2023 | May 2026 | Wind |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |