Wadesboro Solar
275 Allen Pond Rd., Wadesboro, NC 28170Plant Summary Information
Wadesboro Solar is ranked #289 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Wadesboro Solar generated 2.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wadesboro Solar |
|---|---|
| Utility Name | Oppidum Renewables USA, LLC |
| Location | Anson County, NC |
| Initial Operation Date | December 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 8.8 GWh |
| Annual Consumption | 32.2 k MMBtu |
| Ranked #6,595 out of 13,081 Power Plants Nationwide | |
| Ranked #2,243 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #361 out of 876 North Carolina Power Plants | |
| Ranked #289 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Wadesboro Solar, LLC (2016 to 2018) Oppidum Renewables USA, LLC (2019 to 2025) |
Map of Wadesboro Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wadesboro Solar.
Monthly Net Generation for Wadesboro Solar
Monthly Plant Fuel Consumption for Wadesboro Solar
Wadesboro Solar Details
| Summary Information | |
|---|---|
| Plant Name | Wadesboro Solar (61129) |
| Plant Address | 275 Allen Pond Rd., Wadesboro, NC 28170 |
| Utility | Oppidum Renewables USA, LLC (63026) |
| Latitude, Longitude | 34.97386, -80.02899 |
| Generation Dates on File | Dec 2017 to Dec 2025 |
| Initial Operation Date | December 2017 |
| Annual Generation | 8.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF16782000: 201604295558 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 12347 Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 7.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wadesboro Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2233 | Tarboro Solar | Tarboro, NC | 8.9 GWh |
| #2234 | Silver Lake Solar WI, LLC | Salem, WI | 8.9 GWh |
| #2235 | Auburn Solar WI, LLC | Campbellsport, WI | 8.9 GWh |
| #2236 | Exeter Mail CSG | Exeter, RI | 8.9 GWh |
| #2237 | Pastime Farm, LLC | Brazil, IN | 8.9 GWh |
| #2238 | Yanceyville Farm 2 LLC | Blanch, NC | 8.8 GWh |
| #2239 | Yanceyville Farm 3, LLC | Blanch, NC | 8.8 GWh |
| #2240 | Dynamic - Norridgewock Martin Stream (CSG) | Norridgewock, ME | 8.8 GWh |
| #2241 | Wadesboro Farm 3 | Wadesboro, NC | 8.8 GWh |
| #2242 | Wortham Solar Farm | Henderson, NC | 8.8 GWh |
| #2244 | Johnson Solar CSG | Edgerton, MN | 8.8 GWh |
| #2245 | Northfield Solar CSG | Northfield, MN | 8.8 GWh |
| #2246 | Cenergy - Waterville (CSG) | Waterville, ME | 8.8 GWh |
| #2247 | Outback Solar At Christmas Valley | Christmas Valley, OR | 8.8 GWh |
| #2248 | Happy Hollow CSG Hybrid | Winchendon, MA | 8.6 GWh |
| #2249 | Kearsarge West Shore Solar LLC | Portsmouth, RI | 8.8 GWh |
| #2250 | Atkinson Farm Solar | Beulaville, NC | 8.8 GWh |
| #2251 | NSF Aurelius Site 1 LLC | Auburn, NY | 8.8 GWh |
| #2252 | Lillington Solar | Lillington, NC | 8.8 GWh |
| #2253 | Nash 58 Farm | Nashville, NC | 8.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wadesboro Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anson County Generation Facility | Lilesville, NC | 32.9 GWh | 6.1 mi |
| Blewett | Lilesville, NC | 98.0 GWh | 8.6 mi |
| Centerfield Cooper Solar, LLC | Chesterfield, SC | 145.2 GWh | 19 mi |
| County Home Solar LLC | Rockingham, NC | 7.7 GWh | 17.7 mi |
| Ellerbe | Ellerbe, NC | 3.3 GWh | 19 mi |
| Fisher Solar Farm - NC | Oakboro, NC | 9.5 GWh | 18.5 mi |
| Gilead | Gilead, NC | 6.2 GWh | 15.5 mi |
| Hamlet Generating Facility | Hamlet, NC | 144.9 GWh | 18.9 mi |
| Hamlet Solar Energy Storage | Hamlet, NC | 867.0 MWh | 18.9 mi |
| Innovative Solar 37 LLC | Morven, NC | 143.0 GWh | 10.5 mi |
| Marshville Farm | Marshville, NC | 7.9 GWh | 20.1 mi |
| Mills Anson Farm | Lilesville, NC | 8.5 GWh | 5.3 mi |
| Pecan PV1 | Cordova, NC | 9.1 GWh | 12.2 mi |
| Selwyn Farm | Lilesville, NC | 10.0 GWh | 2.1 mi |
| Sherwood H Smith Jr Energy Complex | Hamlet, NC | 9.9 TWh | 18.8 mi |
| Tillery | Mount Gilead, NC | 117.7 GWh | 16.2 mi |
| Wadesboro 4 | Wadesboro, NC | 3.9 GWh | 10.3 mi |
| Wadesboro Farm 1 | Wadesboro, NC | 8.7 GWh | 4 mi |
| Wadesboro Farm 2 | Wadesboro, NC | 9.3 GWh | 5 mi |
| Wadesboro Farm 3 | Wadesboro, NC | 8.8 GWh | 1.3 mi |