Musselshell Wind Project Two LLC
400 Mudcreek Road, Shawmut, MT 59078Plant Summary Information
Musselshell Wind Project Two LLC is ranked #50 out of 71 power plants in Montana in terms of total annual net electricity generation.
Musselshell Wind Project Two LLC generated 7.9 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Musselshell Wind Project Two LLC |
|---|---|
| Utility Name | Musselshell Wind Project Two LLC |
| Location | Wheatland County, MT |
| Initial Operation Date | December 2012 |
| Last Update | Dec 2024 |
| Annual Generation | 26.5 GWh |
| Annual Consumption | 98.7 k MMBtu |
| Ranked #4,900 out of 12,539 Power Plants Nationwide | |
| Ranked #1,058 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #50 out of 71 Montana Power Plants | |
| Ranked #19 out of 23 Montana Wind Power Plants | |
| Fuel Types | Wind |
Map of Musselshell Wind Project Two LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Musselshell Wind Project Two LLC.
Monthly Net Generation for Musselshell Wind Project Two LLC
Musselshell Wind Project Two LLC Details
| Summary Information | |
|---|---|
| Plant Name | Musselshell Wind Project Two LLC (57965) |
| Plant Address | 400 Mudcreek Road, Shawmut, MT 59078 |
| Utility | Musselshell Wind Project Two LLC (57338) |
| Latitude, Longitude | 46.27528, -109.48278 |
| Generation Dates on File | Dec 2012 to Dec 2024 |
| Initial Operation Date | December 2012 |
| Annual Generation | 26.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 11-101-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator MS02 Details Operating December 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 7 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 7 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 22 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 246 |
Musselshell Wind Project Two LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1048 | Orchard Windfarm 4, LLC | Lexington, OR | 29.7 GWh |
| #1049 | Tuana Gulch Wind Park | Hagerman, ID | 29.3 GWh |
| #1050 | Odin Wind Farm LLC | Mountainlake, MN | 29.0 GWh |
| #1051 | Creston Ridge II, LLC | Creston, NE | 28.9 GWh |
| #1052 | Tuana Springs | Hagerman, ID | 28.8 GWh |
| #1053 | Chopin Wind LLC | Milton-Freewater, OR | 28.8 GWh |
| #1054 | Woodstock Windfarm | Woodstock, MN | 28.5 GWh |
| #1055 | Orchard Windfarm 3, LLC | Lexington, OR | 27.9 GWh |
| #1056 | Ridgetop Energy LLC | Mojave, CA | 27.0 GWh |
| #1057 | CED Centerville Wind | Centerville, IA | 26.6 GWh |
| #1059 | Anderson Wind II | Hagerman, NM | 26.4 GWh |
| #1060 | Pillar Mountain Wind Project Microgrid | Kodiak, AK | 26.1 GWh |
| #1061 | Fairfield Wind | Fairfield, MT | 25.9 GWh |
| #1062 | Roth Rock North Wind Farm, LLC | Oakland, MD | 25.7 GWh |
| #1063 | Junction Hilltop Wind Farm | Dana, IA | 25.4 GWh |
| #1064 | Pisgah Mountain Wind | Clifton, ME | 25.3 GWh |
| #1065 | Velva Windfarm LLC | Velva, ND | 25.2 GWh |
| #1066 | SPPW1, LLC | Upland, NE | 25.2 GWh |
| #1067 | Fossil Gulch | Hagerman, ID | 24.5 GWh |
| #1068 | Creston Ridge Wind Farm | Creston, NE | 24.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Musselshell Wind Project Two LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beaver Creek Wind Facility | Big Timber, MT | 39.6 GWh | 22.1 mi |
| Big Timber Wind Farm | Big Timber, MT | 66.0 GWh | 30.1 mi |
| Broadwater Power Project | Toston, MT | 47.4 GWh | 92.7 mi |
| Gordon Butte Wind LLC | Martinsdale, MT | 72.8 GWh | 41.9 mi |
| Judith Gap Wind Energy Center | Harlowton, MT | 403.0 GWh | 24.2 mi |
| Magpie Solar, LLC | Lavina, MT | 5.2 GWh | 26 mi |
| MTSUN | Billings, MT | 153.4 GWh | 51.2 mi |
| Musselshell Wind Project | Shawmut, MT | 23.1 GWh | 0 mi |
| Mystic | Fishtail, MT | 53.7 GWh | 73.8 mi |
| Pryor Mountain Wind | Bridger, MT | 752.5 GWh | 85.6 mi |
| River Bend Solar, LLC (MT) | Reed Point, MT | 3.2 GWh | 39.7 mi |
| South Dry Creek Hydro | Red Lodge, MT | 3.8 GWh | 75.4 mi |
| South Peak Wind | Geyser, MT | 240.9 GWh | 90.4 mi |
| Spion Kop Wind Farm | Geyser, MT | 110.8 GWh | 91.3 mi |
| Stillwater Wind, LLC | Reed Point, MT | 256.1 GWh | 28.3 mi |
| Two Dot Wind Broadview East LLC | Broadview, MT | 4.2 GWh | 34.5 mi |
| Two Dot Wind Farm | Two Dot, MT | 34.8 GWh | 31.2 mi |
| Western Sugar Cooperative - Billings | Billings, MT | 5.3 GWh | 58.9 mi |
| Yellowstone County Generating Station | Laurel, MT | 296.7 GWh | 54.9 mi |
| Yellowstone Energy LP | Billings, MT | 426.3 GWh | 59.9 mi |