Port Jefferson
Beach Street, Port Jefferson, NY 11776Plant Summary Information
Port Jefferson is ranked #50 out of 944 power plants in New York in terms of total annual net electricity generation.
Port Jefferson is comprised of 5 generators and generated 166.8 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Port Jefferson |
|---|---|
| Utility Name | National Grid Generation LLC |
| Location | Suffolk County, NY |
| Initial Operation Date | November 1958 |
| Last Update | Aug 2025 |
| Annual Generation | 236.0 GWh |
| Annual Consumption | 3.4 M MMBtu |
| Ranked #2,254 out of 12,529 Power Plants Nationwide | |
| Ranked #723 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #50 out of 944 New York Power Plants | |
| Ranked #30 out of 115 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 89.3% Residual Fuel Oil : 9.9% Distillate Fuel Oil : 0.7% |
Map of Port Jefferson
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Port Jefferson.
Monthly Net Generation for Port Jefferson
Port Jefferson Details
| Summary Information | |
|---|---|
| Plant Name | Port Jefferson (2517) |
| Plant Address | Beach Street, Port Jefferson, NY 11776 |
| Utility | National Grid Generation LLC (56505) |
| Latitude, Longitude | 40.9497, -73.07851 |
| Generation Dates on File | Jan 2001 to Aug 2025 |
| Initial Operation Date | November 1958 |
| Annual Generation | 236.0 GWh |
| Fuel Types | Natural Gas : 89.3% Residual Fuel Oil : 9.9% Distillate Fuel Oil : 0.7% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 02-22-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Long Island Sound |
| Ash Impoundment | Yes Lined Operating |
| Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name | IROQUOIS GAS TRANSMISSION SYS LP |
| Pipeline Notes | KEDLI |
| Natural Gas Storage | No |
Generator 3 Details Operating November 1958
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23555 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23555 |
| Nameplate Capacity | 188 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 192 MW |
| Winter Capacity | 189.2 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 1958 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 192 MW |
| Net Winter Capacity With Natural Gas | 189.2 MW |
| Net Summer Capacity With Oil | 192 MW |
| Net Winter Capacity With Oil | 189.2 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Generator 4 Details Operating November 1960
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23616 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23616 |
| Nameplate Capacity | 188 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 193 MW |
| Winter Capacity | 194.7 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 1960 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 193 MW |
| Net Winter Capacity With Natural Gas | 194.7 MW |
| Net Summer Capacity With Oil | 193 MW |
| Net Winter Capacity With Oil | 194.7 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Generator GT1 Details Operating December 1966
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23713 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23713 |
| Nameplate Capacity | 16 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 12.9 MW |
| Winter Capacity | 16.6 MW |
| Minimum Load | 10.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 1966 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator GT2 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 24210 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 24210 |
| Nameplate Capacity | 53 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 42.6 MW |
| Winter Capacity | 46.7 MW |
| Minimum Load | 37 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 42.6 MW |
| Net Winter Capacity With Natural Gas | 46.7 MW |
| Net Summer Capacity With Oil | 42.6 MW |
| Net Winter Capacity With Oil | 46.7 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator GT3 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 24211 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 24211 |
| Nameplate Capacity | 53 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 40.1 MW |
| Winter Capacity | 47.1 MW |
| Minimum Load | 37 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 40.1 MW |
| Net Winter Capacity With Natural Gas | 47.1 MW |
| Net Summer Capacity With Oil | 40.1 MW |
| Net Winter Capacity With Oil | 47.1 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Port Jefferson Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| We couldn't locate any owners for this plant | |||
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #713 | Kern River Eastridge Cogen | Bakersfield, CA | 222.2 GWh |
| #714 | Georgia-Pacific Monticello Paper | Monticello, MS | 550.2 GWh |
| #715 | Calvert City | Calvert City, KY | 219.9 GWh |
| #716 | Central Utility Plant Cincinnati | Cincinnati, OH | 221.7 GWh |
| #717 | Ingredion Incorporated | Bedford Park, IL | 219.6 GWh |
| #718 | Kimberly Clark-Unit 1,2,3 | New Milford, CT | 219.0 GWh |
| #719 | Yucca | Yuma, AZ | 220.0 GWh |
| #720 | Dahlberg | Nicholson, GA | 229.4 GWh |
| #721 | Charles D. Lamb Energy Center | Ponca City, OK | 211.8 GWh |
| #722 | Tolk | Muleshoe, TX | 2.3 TWh |
| #724 | Roquette America | Keokuk, IA | 209.5 GWh |
| #725 | Atlantic Alumina, Gramercy Operations | Gramercy, LA | 208.1 GWh |
| #726 | Limon Generating Station | Limon, CO | 216.3 GWh |
| #727 | Elwood Energy LLC | Elwood, IL | 207.4 GWh |
| #728 | El Dorado Refinery | El Dorado, KS | 205.5 GWh |
| #729 | University of Illinois Abbott Power Plt | Champaign, IL | 211.1 GWh |
| #730 | Fredonia (WA) | Mt Vernon, WA | 207.3 GWh |
| #731 | University of Michigan | Ann Arbor, MI | 205.3 GWh |
| #732 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.8 GWh |
| #733 | University of California San Diego Hybri | La Jolla, CA | 203.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Port Jefferson.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blydenburgh Solar Project | Haupaugge, NY | 2.9 GWh | 10.8 mi |
| Caithness Long Island Energy Center | Yaphank, NY | 2.5 TWh | 11.8 mi |
| Holtsville | Holtsville, NY | 21.3 GWh | 9.2 mi |
| Holtsville Solar Project | Holtsville, NY | 2.0 GWh | 10.8 mi |
| Huntington Resource Recovery Facility | East Northport, NY | 198.2 GWh | 12 mi |
| Kings Park Solar I | Kings Park, NY | 2.7 GWh | 10.5 mi |
| Kings Park Solar II | Kings Park, NY | 2.7 GWh | 10.5 mi |
| Lincoln Ave Solar Project | Holbrook, NY | 3.7 GWh | 11.6 mi |
| Long Island Solar Farm LLC | Upton, NY | 46.3 GWh | 13.5 mi |
| MacArthur Waste to Energy Facility | Ronkonkoma, NY | 55.8 GWh | 11.3 mi |
| Orbit Bloom Fuel Cell | Medford, NY | 45.6 GWh | 10.8 mi |
| Richard M Flynn | Holtsville, NY | 469.0 GWh | 9.3 mi |
| Riverhead | Riverhead, NY | 1.4 GWh | 11.7 mi |
| Saint Catherine of Siena Medical Center | Smithtown, NY | 14.0 MWh | 10.6 mi |
| Shoreham | Wading River, NY | 353.0 MWh | 11.2 mi |
| Shoreham Energy LLC | Shoreham, NY | 1.5 GWh | 11.1 mi |
| Shoreham Solar Commons | Shoreham, NY | 50.2 GWh | 10 mi |
| Stony Brook Cogen Plant | Stony Brook, NY | 309.3 GWh | 3.5 mi |
| SWM Fuel Cell | Yaphank, NY | 55.6 GWh | 13.5 mi |
| Wading River | Shoreham, NY | 6.1 GWh | 10.5 mi |