Northport
Eaton's Neck Road, Northport, NY 11768Plant Summary Information
Northport is ranked #10 out of 944 power plants in New York in terms of total annual net electricity generation.
Northport is comprised of 5 generators and generated 1.6 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Northport |
|---|---|
| Utility Name | National Grid Generation LLC |
| Location | Suffolk County, NY |
| Initial Operation Date | March 1967 |
| Last Update | Sep 2025 |
| Annual Generation | 3.9 TWh |
| Annual Consumption | 44.3 M MMBtu |
| Ranked #300 out of 12,539 Power Plants Nationwide | |
| Ranked #168 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #10 out of 944 New York Power Plants | |
| Ranked #5 out of 115 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 94.8% Residual Fuel Oil : 5.2% |
Map of Northport
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Northport.
Monthly Net Generation for Northport
Northport Details
| Summary Information | |
|---|---|
| Plant Name | Northport (2516) |
| Plant Address | Eaton's Neck Road, Northport, NY 11768 |
| Utility | National Grid Generation LLC (56505) |
| Latitude, Longitude | 40.92357, -73.34232 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | March 1967 |
| Annual Generation | 3.9 TWh |
| Fuel Types | Natural Gas : 94.8% Residual Fuel Oil : 5.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Long Island Sound |
| Ash Impoundment | Yes Lined Operating |
| Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name | IROQUOIS GAS TRANSMISSION SYS LP |
| Pipeline Notes | KEDLI |
| Natural Gas Storage | No |
Generator GT1 Details Operating March 1967
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23718 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23718 |
| Nameplate Capacity | 16 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 11.8 MW |
| Winter Capacity | 15.8 MW |
| Minimum Load | 10.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1967 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating July 1967
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23551 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23551 |
| Nameplate Capacity | 387 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 397.7 MW |
| Winter Capacity | 396.2 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1967 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 397.7 MW |
| Net Winter Capacity With Natural Gas | 396.2 MW |
| Net Summer Capacity With Oil | 397.7 MW |
| Net Winter Capacity With Oil | 396.2 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Generator 2 Details Operating June 1968
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23552 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23552 |
| Nameplate Capacity | 387 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 398 MW |
| Winter Capacity | 399 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1968 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 398 MW |
| Net Winter Capacity With Natural Gas | 399 MW |
| Net Summer Capacity With Oil | 398 MW |
| Net Winter Capacity With Oil | 399 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Generator 3 Details Operating July 1972
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23553 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23553 |
| Nameplate Capacity | 387 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 398.5 MW |
| Winter Capacity | 394.2 MW |
| Minimum Load | 30 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1972 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 398.5 MW |
| Net Winter Capacity With Natural Gas | 394.2 MW |
| Net Summer Capacity With Oil | 398.5 MW |
| Net Winter Capacity With Oil | 394.2 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Generator 4 Details Operating December 1977
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 23650 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 23650 |
| Nameplate Capacity | 387 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 398 MW |
| Winter Capacity | 396.5 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1977 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Residual Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / RFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 398 MW |
| Net Winter Capacity With Natural Gas | 396.5 MW |
| Net Summer Capacity With Oil | 398 MW |
| Net Winter Capacity With Oil | 396.5 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | No |
Northport Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #158 | Asheville | Arden, NC | 3.8 TWh |
| #159 | Fort St Vrain | Platteville, CO | 3.8 TWh |
| #160 | Lansing Smith | Southport, FL | 3.8 TWh |
| #161 | Green Power 2 | Texas City, TX | 3.8 TWh |
| #162 | Osprey Energy Center Power Plant | Auburndale, FL | 3.8 TWh |
| #163 | Griffith Energy LLC | Golden Valley, AZ | 3.7 TWh |
| #164 | Buck | Salisbury, NC | 3.7 TWh |
| #165 | Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.7 TWh |
| #166 | Birdsboro Power | Birdsboro, PA | 3.7 TWh |
| #167 | Coughlin Power Station | St Landry, LA | 3.7 TWh |
| #169 | Sabine | Orange, TX | 3.7 TWh |
| #170 | Thomas C Ferguson | Horseshoe Bay, TX | 3.7 TWh |
| #171 | Milford Power Project | Milford, CT | 3.6 TWh |
| #172 | Curtis H Stanton Energy Center | Orlando, FL | 3.6 TWh |
| #173 | Marshall (NC) | Terrell, NC | 7.8 TWh |
| #174 | Midulla Generating Station | Bowling Green, FL | 3.6 TWh |
| #175 | Fox Energy Center | Wrightstown, WI | 3.6 TWh |
| #176 | Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh |
| #177 | Magnet Cove | Malvern, AR | 3.6 TWh |
| #178 | Washington Energy Facility | Beverly, OH | 3.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Northport.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ATT Jericho | Huntington, NY | 8.3 GWh | 6.5 mi |
| Bloom-Altice Fuel Cell | Bethpage,, NY | 15.6 GWh | 13.7 mi |
| Blydenburgh Solar Project | Haupaugge, NY | 2.9 GWh | 11.2 mi |
| Brentwood | Long Island, NY | 37.4 GWh | 9.8 mi |
| Brentwood Solar | Brentwood, NY | 687.0 MWh | 11.1 mi |
| Cohalan | Central Islip, NY | 5.0 GWh | 13.6 mi |
| Deer Park | Deer Park, NY | 2.8 GWh | 13.7 mi |
| Dennison | Hauppauge, NY | 1.9 GWh | 11.1 mi |
| Edgewood Energy LLC | Brentwood, NY | 39.9 GWh | 9.8 mi |
| Huntington Resource Recovery Facility | East Northport, NY | 198.1 GWh | 4 mi |
| Kings Park Solar I | Kings Park, NY | 2.7 GWh | 6.2 mi |
| Kings Park Solar II | Kings Park, NY | 2.7 GWh | 6.2 mi |
| North County | Hauppauge, NY | 1.1 GWh | 11.1 mi |
| Pinelawn Power LLC | West Babylon, NY | 76.6 GWh | 13.1 mi |
| Reworld Babylon Inc | West Babylon, NY | 124.5 GWh | 13.2 mi |
| Riverhead | Riverhead, NY | 1.4 GWh | 8.9 mi |
| Saint Catherine of Siena Medical Center | Smithtown, NY | 14.0 MWh | 4.1 mi |
| SL Babylon | West Babylon, NY | 13.6 GWh | 13.4 mi |
| Stony Brook Cogen Plant | Stony Brook, NY | 309.3 GWh | 11.1 mi |
| Waterside Power, LLC | Stamford, CT | 2.1 GWh | 13.7 mi |