Mountain Wind Power II LLC
1749 CR 202, Fort Bridger, WY 82933Plant Summary Information
Mountain Wind Power II LLC is ranked #38 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Mountain Wind Power II LLC generated 48.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Mountain Wind Power II LLC |
|---|---|
| Utility Name | Mountain Wind Power II LLC |
| Location | Uinta County, WY |
| Initial Operation Date | September 2008 |
| Last Update | May 2026 |
| Annual Generation | 190.6 GWh |
| Annual Consumption | 685.6 k MMBtu |
| Ranked #2,600 out of 13,081 Power Plants Nationwide | |
| Ranked #768 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #38 out of 69 Wyoming Power Plants | |
| Ranked #23 out of 27 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Edison Mission Energy (2013 to 2014) NRG Energy Gas & Wind Holdings Inc (2015 to 2020) Mountain Wind Power II LLC (2021 to 2025) |
Map of Mountain Wind Power II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mountain Wind Power II LLC.
Monthly Net Generation for Mountain Wind Power II LLC
Monthly Plant Fuel Consumption for Mountain Wind Power II LLC
Mountain Wind Power II LLC Details
| Summary Information | |
|---|---|
| Plant Name | Mountain Wind Power II LLC (56753) |
| Plant Address | 1749 CR 202, Fort Bridger, WY 82933 |
| Utility | Mountain Wind Power II LLC (64652) |
| Latitude, Longitude | 41.26389, -110.54444 |
| Generation Dates on File | Sep 2008 to May 2026 |
| Initial Operation Date | September 2008 |
| Annual Generation | 190.6 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF07-9 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG13-64 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator 1 Details Operating September 2008
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| RTO ISO LMP Node Designation | WECC |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | WECC |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2008 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 38 |
| Turbine Details | |
| Number Of Turbines | 38 |
|---|---|
| Predominant Turbine Manufacturer | Suzlon |
| Predominant Turbine Model Number | S88-2100 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Mountain Wind Power II LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| NRG Energy, Inc | 300 Carnegie Center, Suite 300, Princenton, NJ 8540 | 19.90% |
| Edison Mission Energy | 2244 WALNUT GROVE AVE, Rosemead, CA 91770 | 80.10% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #758 | Bison I Wind Energy Center | New Salem, ND | 196.5 GWh |
| #759 | Jeffers Wind 20 LLC | Jeffers, MN | 196.5 GWh |
| #760 | Montezuma Wind II | Birds Landing, CA | 195.8 GWh |
| #761 | Strauss Wind Farm | Lompoc, CA | 194.9 GWh |
| #762 | Pebble Springs Wind LLC | Wasco, OR | 194.2 GWh |
| #763 | San Gorgonio Windplant WPP1993 | North Palm Springs, CA | 191.9 GWh |
| #764 | Elm Creek Wind LLC | Trimont, MN | 191.6 GWh |
| #765 | Granite Reliable Power | Dummer, NH | 191.6 GWh |
| #766 | Roaring Brook, LLC | Lowville, NY | 191.4 GWh |
| #767 | Osceola Windpower II | Harris, IA | 191.2 GWh |
| #769 | Red Hills Wind Project LLC | Hammon, OK | 190.2 GWh |
| #770 | FPL Energy Oliver Wind II LLC | Center, ND | 189.5 GWh |
| #771 | Pinnacle Wind Force LLC | Keyser, WV | 189.2 GWh |
| #772 | Cotton Plains Wind Farm | Floydada, TX | 188.9 GWh |
| #773 | Taloga Wind LLC | Putnam, OK | 188.2 GWh |
| #774 | Elm Creek Wind II LLC | Trimont, MN | 187.1 GWh |
| #775 | Beebe 1A | Ithaca, MI | 185.8 GWh |
| #776 | Nine Canyon | Kennewick, WA | 185.8 GWh |
| #777 | Cedar Ridge | Eden, WI | 184.8 GWh |
| #778 | Milo Wind Project LLC | Portales, NM | 183.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mountain Wind Power II LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Causey | South Fork, UT | 3.9 GWh | 54.3 mi |
| Echo Dam | Echo, UT | 8.6 GWh | 50.7 mi |
| Flaming Gorge | Dutch John, UT | 323.2 GWh | 63.3 mi |
| Fontenelle | Le Barge, WY | 43.8 GWh | 58.3 mi |
| Gateway | Mountain Green, UT | 8.0 GWh | 67.5 mi |
| General Chemical | Green River, WY | 215.9 GWh | 46.8 mi |
| Heber City | Heber City, UT | 16.5 GWh | 69.8 mi |
| Jordanelle Dam Hydroelectric Project | Heber, UT | 49.3 GWh | 65.1 mi |
| Lake Creek Dam | Heber City, UT | 3.1 GWh | 66.7 mi |
| Mountain Wind Power LLC | Fort Bridger, WY | 158.8 GWh | 3.7 mi |
| Naughton | Kemmerer, WY | 1.7 TWh | 34.3 mi |
| Pine View Dam | Ogden, UT | 3.4 GWh | 67.7 mi |
| Sage Solar I-III | Randolph, UT | 137.8 GWh | 44 mi |
| Shute Creek Facility | Kemmerer, WY | 837.9 GWh | 48.6 mi |
| Snake Creek | Midway, UT | 3.8 GWh | 70.5 mi |
| Sweetwater Solar | Green River, WY | 174.3 GWh | 51.2 mi |
| TransAlta Wyoming Wind | Evanston, WY | 321.4 GWh | 1.7 mi |
| Uintah | Neola, UT | 4.5 GWh | 56 mi |
| Wanship | Wanship, UT | 4.9 GWh | 55.5 mi |
| WE Soda Alkalai LLC | Green River, WY | 259.5 GWh | 45.3 mi |