Clarendon Solar Farm
1881 Route 7B Central, North Clarendon, VT 5759Plant Summary Information
Clarendon Solar Farm is ranked #28 out of 54 solar farms in Vermont in terms of total annual net electricity generation.
Clarendon Solar Farm generated 456.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Clarendon Solar Farm |
|---|---|
| Utility Name | Clarendon Solar Farm, LLC |
| Location | Rutland County, VT |
| Initial Operation Date | July 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 2.9 GWh |
| Annual Consumption | 10.0 k MMBtu |
| Ranked #9,995 out of 13,081 Power Plants Nationwide | |
| Ranked #4,985 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #69 out of 114 Vermont Power Plants | |
| Ranked #28 out of 54 Vermont Solar Power Plants | |
| Fuel Types | Solar |
Map of Clarendon Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clarendon Solar Farm.
Monthly Net Generation for Clarendon Solar Farm
Monthly Plant Fuel Consumption for Clarendon Solar Farm
Clarendon Solar Farm Details
| Summary Information | |
|---|---|
| Plant Name | Clarendon Solar Farm (59476) |
| Plant Address | 1881 Route 7B Central, North Clarendon, VT 5759 |
| Utility | Clarendon Solar Farm, LLC (59240) |
| Latitude, Longitude | 43.53972, -72.95583 |
| Generation Dates on File | Jul 2014 to Dec 2025 |
| Initial Operation Date | July 2014 |
| Annual Generation | 2.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Green Mountain Power Corp (7601) VT |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator VT001 Details Operating July 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 27 |
| DC Net Capacity | 2.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Clarendon Solar Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4975 | Claggett Landing | Upper Malboro, MD | 2.9 GWh |
| #4976 | University of California Santa Cruz | Santa Cruz, CA | 33.5 GWh |
| #4977 | Chanel Piscataway Rooftop | Piscataway, NJ | 2.9 GWh |
| #4978 | WED Stilson Solar | Richmond, RI | 2.9 GWh |
| #4979 | Hobart & William Smith College Gates Rd. | Geneva, NY | 2.9 GWh |
| #4980 | West Davisville Solar | North Kingstown, RI | 2.9 GWh |
| #4981 | PG Solar, LLC | Mt Olive, NC | 2.9 GWh |
| #4982 | FreeState Stull Solar I | LeCompton, KS | 2.9 GWh |
| #4983 | CDCR (CA) - Pleasant Valley State Prison | Coalinga, CA | 2.9 GWh |
| #4984 | Oregon University System OIT Klamath Fal | Klamath Falls, OR | 2.9 GWh |
| #4986 | CSUF Nutwood Solar | Fullerton, CA | 2.9 GWh |
| #4987 | South Atlantic Services Solar Farm I | Wilmington, NC | 2.9 GWh |
| #4988 | Strobus | Merrillan, WI | 2.9 GWh |
| #4989 | Yellow Mills Rd #3 Community Solar Farm | Farmington, NY | 2.9 GWh |
| #4990 | Mt Arlington Solar 1 LLC | Mt Arlington, NJ | 2.9 GWh |
| #4991 | White CSG | Baltimore, MD | 2.9 GWh |
| #4992 | Syncarpha Halifax Hybrid CSG | Halifax, MA | 2.8 GWh |
| #4993 | Chittenden County Solar Partners | South Burlington, VT | 2.9 GWh |
| #4994 | Cascades | Piscataway Township, NJ | 2.9 GWh |
| #4995 | Greenwood (MO) | Greenwood, MO | 86.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clarendon Solar Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Carver Falls | Hampton, NY | 4.1 GWh | 18.6 mi |
| Cavendish | Cavendish, VT | 1.4 GWh | 21 mi |
| Chester Power Partners | North Chester, VT | 2.4 GWh | 25.4 mi |
| Cold River Road Solar | North Clarendon, VT | 3.2 GWh | 3.2 mi |
| Coolidge Solar 1, LLC | Ludlow, VT | 24.9 GWh | 16.6 mi |
| ER Sand Hill | Castleton, VT | 3.4 GWh | 12.6 mi |
| Glen | Rutland, VT | 6.3 GWh | 6.8 mi |
| Gore Mountain Solar II | Whitehall, NY | 2.7 GWh | 18.4 mi |
| Gray Solar | Rutland, VT | 3.4 GWh | 2.8 mi |
| HGS Solar I | Whitehall, NY | 3.0 GWh | 18.5 mi |
| MacKinnon Solar | Rutland, VT | 3.4 GWh | 2.7 mi |
| Main Street Solar Project | Rutland, VT | 2.1 GWh | 6.1 mi |
| MHG Wallingford | Wallingford, VT | 3.5 GWh | 4.5 mi |
| Park St | Rutland, VT | 1.7 GWh | 4 mi |
| Pittsford | Pittsford, VT | 7.5 GWh | 10.7 mi |
| Proctor | Proctor, VT | 27.8 GWh | 9.4 mi |
| Salisbury | Salisbury, VT | 2.4 GWh | 25.6 mi |
| Silver Lake (VT) | Salisbury, VT | 5.2 GWh | 25.3 mi |
| Stafford Hill Solar Hybrid | Rutland, VT | 390.0 MWh | 5.5 mi |
| Sudbury Solar | Sudbury, VT | 1.5 GWh | 23.4 mi |