OR - Solops - SPI 18 - Clayfield
23617 South Spring Water Rd., Estacada, OR 97023Plant Summary Information
OR - Solops - SPI 18 - Clayfield is ranked #108 out of 124 solar farms in Oregon in terms of total annual net electricity generation.
OR - Solops - SPI 18 - Clayfield generated 202.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | OR - Solops - SPI 18 - Clayfield |
---|---|
Utility Name | Clayfield Solar, LLC |
Location | Clackamas County, OR |
Initial Operation Date | October 2024 |
Last Update | Dec 2024 |
Annual Generation | 202.0 MWh |
Annual Consumption | 690 MMBtu |
Ranked #11,731 out of 12,299 Power Plants Nationwide | |
Ranked #6,099 out of 6,182 Solar Power Plants Nationwide | |
Ranked #251 out of 267 Oregon Power Plants | |
Ranked #108 out of 124 Oregon Solar Power Plants | |
Fuel Types | Solar |
Map of OR - Solops - SPI 18 - Clayfield
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for OR - Solops - SPI 18 - Clayfield.
Monthly Net Generation for OR - Solops - SPI 18 - Clayfield
OR - Solops - SPI 18 - Clayfield Details
Summary Information | |
---|---|
Plant Name | OR - Solops - SPI 18 - Clayfield (68448) |
Plant Address | 23617 South Spring Water Rd., Estacada, OR 97023 |
Utility | Clayfield Solar, LLC (66808) |
Latitude, Longitude | 45.26223, -122.34663 |
Generation Dates on File | Oct 2024 to Dec 2024 |
Initial Operation Date | October 2024 |
Annual Generation | 202.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 181743 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Portland General Electric Company (PGE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Portland General Electric Co (15248) OR |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator CLAFD Details Operating October 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
East West Fixed Tilt | No |
Bifacial | Yes |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
OR - Solops - SPI 18 - Clayfield Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6089 | IKEA Canton Rooftop PV System | Canton, MI | 238.0 MWh |
#6090 | Independence East | Independence, NY | 238.0 MWh |
#6091 | Sanford CGA | Sanford, ME | 230.0 MWh |
#6092 | Vilas Solar Array | Springfield, CO | 224.0 MWh |
#6093 | Princetown Solar 1 | Duanesburg, NY | 221.0 MWh |
#6094 | Hobart Solar, LLC | Hobart, IN | 215.0 MWh |
#6095 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 266.0 MWh |
#6096 | Dynamic - Norridgewock Martin Stream (CSG) | Norridgewock, ME | 206.0 MWh |
#6097 | BRNG Nicolin (CSG) | Ellsworth, ME | 205.0 MWh |
#6098 | Listonburg Solar | Addison Township, PA | 203.0 MWh |
#6100 | Byrne Solar, LLC | Lowell, MI | 198.0 MWh |
#6101 | Ticon Solar | Ticonderoga, NY | 198.0 MWh |
#6102 | MN East Regal LLC (CSG) | Paynesville, MN | 179.0 MWh |
#6103 | BNRG Norridgewock (CSG) | Norridgewock, ME | 171.0 MWh |
#6104 | Tipton 1 - (CA) | Tipton, CA | 167.0 MWh |
#6105 | Bayville Central Facility | Bayville, NJ | 2.5 GWh |
#6106 | Osage City Solar | Osage City, KS | 164.0 MWh |
#6107 | Camp San Luis Obispo | San Luis Obispo, CA | 158.0 MWh |
#6108 | St. Clair Solar 3 | Washington Park, IL | 158.0 MWh |
#6109 | FedEx Middletown | Middletown, CT | 151.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding OR - Solops - SPI 18 - Clayfield.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Auburn Solar LLC (CSG) | Boring, OR | 3.2 GWh | 9 mi |
Boring Solar LLC | Sandy, OR | 3.7 GWh | 12 mi |
Colton Solar | Molalla, OR | 12.0 MWh | 8.9 mi |
Day Hill Solar, LLC | Estacada, OR | 3.9 GWh | 0.9 mi |
Dunn Road Solar | Sandy, OR | 3.1 GWh | 12 mi |
Duus Solar, LLC | Estacada, OR | 18.5 GWh | 3.9 mi |
Faraday | Estacada, OR | 119.9 GWh | 1.4 mi |
Firwood Solar, LLC | Sandy, OR | 17.7 GWh | 7.7 mi |
Kaiser Creek Solar (CSG) | Molalla, OR | 3.1 GWh | 15.2 mi |
Minke Solar | Molalla, OR | 27.0 MWh | 14.8 mi |
North Fork | Estacada, OR | 186.7 GWh | 3.5 mi |
NSE Astoria - Skyward | Boring, OR | 4.2 GWh | 11.3 mi |
River Mill | Estacada, OR | 99.1 GWh | 2.6 mi |
Sandy River Solar (CSG) | Sandy, OR | 2.9 GWh | 11.9 mi |
SSD Clackamas 1, LLC | Boring, OR | 6.5 GWh | 10.9 mi |
SSD Clackamas 7, LLC | Molalla, OR | 3.9 GWh | 13.1 mi |
Sullivan | West Linn, OR | 104.1 GWh | 14.7 mi |
SulusSolar17 | Oregon City, OR | 4.1 GWh | 7.3 mi |
SulusSolar29 | Boring, OR | 3.8 GWh | 13.9 mi |
Tickle Creek Solar | Sandy, OR | 3.1 GWh | 8.7 mi |