Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Twin Falls (WI) | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.7 GWh | Jun 2016 | Dec 2024 | Water |
| Montfort Wind Energy Center | Wisconsin Electric Power Co | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 55.8 GWh | May 2002 | Sep 2025 | Wind |
| Whitewater Generating Station | Wisconsin Electric Power Co | Whitewater, WI | Midcontinent Independent System Operator, Inc. (MISO) | 863.1 GWh | Aug 1997 | Sep 2025 | Natural Gas |
| Elm Road Generating Station | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 TWh | Jan 2010 | Sep 2025 | Subbituminous Coal : 79.7% Bituminous Coal : 17.0% Natural Gas : 3.3% |
| Harley-Davison Powertrain Operations | Wisconsin Electric Power Co | Menomonee Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Sep 2020 | Dec 2024 | Solar |
| City of Milwaukee Landfill | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jan 2021 | Dec 2024 | Solar |
| ATI | Wisconsin Electric Power Co | Cudahy, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Oct 2020 | Dec 2024 | Solar |
| Hackbarth Solar WI, LLC | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Nov 2024 | Dec 2024 | Solar |
| CREE | Wisconsin Electric Power Co | Racine, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2021 | Dec 2024 | Solar |
| Jones Dairy | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jun 2021 | Dec 2024 | Solar |
| Regal Ware | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Mar 2021 | Dec 2024 | Solar |
| Washington County | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Dec 2019 | Dec 2024 | Solar |
| UW Parkside | Wisconsin Electric Power Co | Kenosha, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Oct 2020 | Dec 2024 | Solar |
| Jackson Solar WI, LLC | Wisconsin Electric Power Co | Cedarburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2023 | May 2024 | Solar |
| Bonduel Solar WI, LLC | Wisconsin Electric Power Co | Bonduel, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Nov 2023 | Feb 2024 | Solar |
| Lannon Stone | Wisconsin Electric Power Co | Pewaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Auburn Solar WI, LLC | Wisconsin Electric Power Co | Campbellsport, WI | Midcontinent Independent System Operator, Inc. (MISO) | 80.0 MWh | Nov 2024 | Dec 2024 | Solar |
| LaFayette Solar WI, LLC | Wisconsin Electric Power Co | Elkhorn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Silver Lake Solar WI, LLC | Wisconsin Electric Power Co | Salem, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | May 2024 | Solar |
| Spring Prairie Solar WI, LLC | Wisconsin Electric Power Co | Burlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2023 | May 2024 | Solar |
| Paris Solar | Wisconsin Electric Power Co | Union Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 257.8 GWh | Nov 2024 | Sep 2025 | Solar |
| Darien Solar | Wisconsin Electric Power Co | Darien, WI | Midcontinent Independent System Operator, Inc. (MISO) | 264.7 GWh | - | Sep 2025 | Solar |
| Badger Hollow II | Wisconsin Electric Power Co | Cobb, WI | Midcontinent Independent System Operator, Inc. (MISO) | 200.2 GWh | Nov 2023 | Sep 2025 | Solar |
| Port Washington Generating Station | Wisconsin Electric Power Co | Port Washington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 TWh | Jun 2005 | Sep 2025 | Natural Gas |
| Pine | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | May 1922 | Dec 2024 | Water |
| Appleton | Wisconsin Electric Power Co | Appleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.4 GWh | Jul 1916 | Dec 2024 | Water |
| Valley (WI) | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 353.5 GWh | May 1968 | Sep 2025 | Natural Gas |
| South Oak Creek | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 TWh | Nov 1959 | Sep 2025 | Subbituminous Coal : 99.7% |
| Paris (WI) | Wisconsin Electric Power Co | Union Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 227.4 GWh | Feb 1995 | Dec 2024 | Natural Gas |
| Concord | Wisconsin Electric Power Co | Watertown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 175.2 GWh | Jun 1993 | Dec 2024 | Natural Gas : 99.8% |
| Germantown | Wisconsin Electric Power Co | Germantown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 28.1 GWh | Jun 1978 | Dec 2024 | Natural Gas : 94.1% Distillate Fuel Oil : 5.9% |
| Big Quinnesec 92 | Wisconsin Electric Power Co | Iron Mountain, MI | Midcontinent Independent System Operator, Inc. (MISO) | 89.1 GWh | Oct 1949 | Dec 2024 | Water |
| Big Quinnesec 61 | Wisconsin Electric Power Co | Iron Mountain, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Apr 1914 | Dec 2024 | Water |
| Kingsford | Wisconsin Electric Power Co | Kingsford, MI | Midcontinent Independent System Operator, Inc. (MISO) | 24.8 GWh | Apr 1924 | Dec 2024 | Water |
| Michigamme Falls | Wisconsin Electric Power Co | Crystal Falls, MI | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 GWh | May 1953 | Dec 2024 | Water |
| Peavy Falls | Wisconsin Electric Power Co | Crystal Falls, MI | Midcontinent Independent System Operator, Inc. (MISO) | 36.9 GWh | Dec 1942 | Dec 2024 | Water |
| Way Dam | Wisconsin Electric Power Co | Crystal Falls, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Nov 1949 | Dec 2024 | Water |
| White Rapids | Wisconsin Electric Power Co | Stephenson, MI | Midcontinent Independent System Operator, Inc. (MISO) | 29.8 GWh | Sep 1927 | Dec 2024 | Water |
| Hemlock Falls | Wisconsin Electric Power Co | Crystal Falls, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Jul 1953 | Dec 2024 | Water |
| Chalk Hill | Wisconsin Electric Power Co | Stephenson, MI | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | Apr 1927 | Dec 2024 | Water |
| Brule | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.9 GWh | Dec 1918 | Dec 2024 | Water |
| Alliant Energy Neenah | Wisconsin Power & Light Co | Neenah, WI | Midcontinent Independent System Operator, Inc. (MISO) | 739.9 GWh | Apr 2000 | Dec 2024 | Natural Gas |
| Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 TWh | May 2004 | Sep 2025 | Natural Gas |
| Sheboygan Falls | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 642.5 GWh | May 2005 | Dec 2024 | Natural Gas |
| West Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 TWh | Apr 2020 | Sep 2025 | Natural Gas : 99.9% |
| Cedar Ridge | Wisconsin Power & Light Co | Eden, WI | Midcontinent Independent System Operator, Inc. (MISO) | 174.6 GWh | Nov 2008 | Dec 2024 | Wind |
| Bent Tree Wind Farm Phase 1 | Wisconsin Power & Light Co | Hartland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 343.0 GWh | Jan 2011 | Dec 2024 | Wind |
| Columbia (WI) | Wisconsin Power & Light Co | Pardeville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 TWh | Apr 1975 | Sep 2025 | Subbituminous Coal : 99.9% |
| Kohler Solar | Wisconsin Power & Light Co | Kohler, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | May 2022 | Dec 2024 | Solar |
| Kossuth | Wisconsin Power & Light Co | Lu Verne, IA | Midcontinent Independent System Operator, Inc. (MISO) | 523.0 GWh | Sep 2020 | Sep 2025 | Wind |
| South Fond Du Lac | Wisconsin Power & Light Co | Fond du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Apr 1993 | Dec 2024 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
| Edgewater | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 TWh | Jun 1951 | Sep 2025 | Subbituminous Coal : 99.9% |
| Kilbourn | Wisconsin Power & Light Co | Wisconsin Dells, WI | Midcontinent Independent System Operator, Inc. (MISO) | 57.6 GWh | Jun 1926 | Dec 2024 | Water |
| Prairie Du Sac | Wisconsin Power & Light Co | Prairie du Sac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 143.8 GWh | Sep 1915 | Dec 2024 | Water |
| Beaver Dam Solar | Wisconsin Power & Light Co | Dodge, WI | Midcontinent Independent System Operator, Inc. (MISO) | 100.5 GWh | Nov 2023 | Sep 2025 | Solar |
| Albany Solar (WI) | Wisconsin Power & Light Co | Broadhead, WI | Midcontinent Independent System Operator, Inc. (MISO) | 97.7 GWh | Nov 2023 | Sep 2025 | Solar |
| Paddock Solar | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 134.6 GWh | Oct 2023 | Sep 2025 | Solar |
| Wautoma Solar | Wisconsin Power & Light Co | Wautoma, WI | Midcontinent Independent System Operator, Inc. (MISO) | 187.4 GWh | Nov 2023 | Sep 2025 | Solar |
| Springfield Solar (WI) | Wisconsin Power & Light Co | Lomira, WI | Midcontinent Independent System Operator, Inc. (MISO) | 202.6 GWh | Nov 2023 | Sep 2025 | Solar |
| Cassville Solar | Wisconsin Power & Light Co | Cassville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 97.6 GWh | Nov 2023 | Sep 2025 | Solar |
| Crawfish River | Wisconsin Power & Light Co | Jefferson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 131.0 GWh | Nov 2023 | Sep 2025 | Solar |
| Grant County | Wisconsin Power & Light Co | Town of Potosi, WI | Midcontinent Independent System Operator, Inc. (MISO) | 374.6 GWh | Apr 2024 | Sep 2025 | Solar |
| Onion River | Wisconsin Power & Light Co | Sheboygan Cedar Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 252.6 GWh | Nov 2023 | Sep 2025 | Solar |
| Bear Creek (WI) | Wisconsin Power & Light Co | Lone Rock, WI | Midcontinent Independent System Operator, Inc. (MISO) | 99.9 GWh | Aug 2022 | Sep 2025 | Solar |
| North Rock | Wisconsin Power & Light Co | Edgerton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 100.1 GWh | Sep 2022 | Sep 2025 | Solar |
| Wood County | Wisconsin Power & Light Co | Nekoosa, WI | Midcontinent Independent System Operator, Inc. (MISO) | 277.2 GWh | Nov 2022 | Sep 2025 | Solar |
| Red Barn Energy | Wisconsin Public Service Corp | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 251.6 GWh | Mar 2023 | Sep 2025 | Wind |
| De Pere Energy Center | Wisconsin Public Service Corp | De Pere, WI | Midcontinent Independent System Operator, Inc. (MISO) | 138.0 GWh | May 1999 | Dec 2024 | Natural Gas : 68.9% Distillate Fuel Oil : 31.1% |
| Fox Energy Center | Wisconsin Public Service Corp | Wrightstown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 TWh | May 2005 | Sep 2025 | Natural Gas |
| Grand Rapids | Wisconsin Public Service Corp | Ingalls, MI | Midcontinent Independent System Operator, Inc. (MISO) | 31.9 GWh | May 1918 | Dec 2024 | Water |
| Wausau | Wisconsin Public Service Corp | Wausau, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Feb 1921 | Dec 2024 | Water |
| Weston | Wisconsin Public Service Corp | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 TWh | Nov 1954 | Sep 2025 | Subbituminous Coal : 99.5% Natural Gas : 0.5% |
| Alexander | Wisconsin Public Service Corp | Merrill, WI | Midcontinent Independent System Operator, Inc. (MISO) | 19.0 GWh | Dec 1924 | Dec 2024 | Water |
| Sandstone Rapids | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 GWh | Dec 1924 | Dec 2024 | Water |
| West Marinette | Wisconsin Public Service Corp | Peshtigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.6 GWh | May 1971 | Dec 2024 | Natural Gas |
| Caldron Falls | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 13.7 GWh | Oct 1924 | Dec 2024 | Water |
| Grandfather Falls | Wisconsin Public Service Corp | Irma, WI | Midcontinent Independent System Operator, Inc. (MISO) | 80.4 GWh | Nov 1938 | Dec 2024 | Water |
| Hat Rapids | Wisconsin Public Service Corp | Rhinelander, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | May 1923 | Dec 2024 | Water |
| Tomahawk | Wisconsin Public Service Corp | Tomahawk, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 GWh | Dec 1937 | Dec 2024 | Water |
| High Falls (WI) | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 16.4 GWh | Jul 1910 | Dec 2024 | Water |
| Johnson Falls | Wisconsin Public Service Corp | Town of Stephenson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.2 GWh | Jun 1923 | Dec 2024 | Water |
| Merrill | Wisconsin Public Service Corp | Merrill, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Feb 1917 | Dec 2024 | Water |
| Potato Rapids | Wisconsin Public Service Corp | Town of Porterfield, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Apr 1921 | Dec 2024 | Water |
| Pulliam | Wisconsin Public Service Corp | Green Bay, WI | Midcontinent Independent System Operator, Inc. (MISO) | 109.3 GWh | Aug 1949 | Sep 2025 | Natural Gas |
| Crane Creek Wind Energy Center | Wisconsin Public Service Corp | Riceville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 302.0 GWh | Nov 2009 | Dec 2024 | Wind |
| Forward Wind Energy Center | Wisconsin Public Service Corp | Brownsville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 145.7 GWh | Jun 2008 | Sep 2025 | Wind |
| Antigo-Forrest Street Solar Project | Wisconsin Public Service Corp | Antigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 279.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Badger Hollow I | Wisconsin Public Service Corp | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 194.5 GWh | Oct 2021 | Sep 2025 | Solar |
| Two Creeks Solar | Wisconsin Public Service Corp | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 194.5 GWh | Oct 2020 | Sep 2025 | Solar |
| Weston RICE | Wisconsin Public Service Corp | Kronenwetter, WI | Midcontinent Independent System Operator, Inc. (MISO) | 85.5 GWh | Jun 2023 | Dec 2024 | Natural Gas |
| Hodag Solar | Wisconsin Public Service Corp | Rhinelander, WI | Midcontinent Independent System Operator, Inc. (MISO) | 12.6 GWh | Dec 2021 | Dec 2024 | Solar |
| Castle Rock | Wisconsin River Power Company | Adams, WI | Midcontinent Independent System Operator, Inc. (MISO) | 91.9 GWh | Jul 1950 | Dec 2024 | Water |
| Petenwell | Wisconsin River Power Company | Necedah, WI | Midcontinent Independent System Operator, Inc. (MISO) | 108.4 GWh | Jul 1949 | Dec 2024 | Water |
| Wise County Power LLC | Wise County Power Company LLC | Poolville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.9 TWh | Jun 2004 | Sep 2025 | Natural Gas |
| Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 28.2 GWh | Jun 2022 | Dec 2024 | Solar |
| Greene Valley Gas Recovery | WM Illinois Renewable Energy LLC | Naperville, IL | PJM Interconnection, LLC (PJM) | 22.5 GWh | Apr 1996 | Dec 2024 | Landfill Gas |
| Woodland Landfill Gas Recovery | WM Illinois Renewable Energy LLC | South Elgin, IL | PJM Interconnection, LLC (PJM) | 13.6 GWh | Apr 1992 | Dec 2024 | Landfill Gas |
| Settlers Hill Gas Recovery | WM Illinois Renewable Energy LLC | Batavia, IL | PJM Interconnection, LLC (PJM) | 21.5 GWh | Sep 1988 | Dec 2024 | Landfill Gas |
| Tazewell Gas Recovery | WM Illinois Renewable Energy LLC | East Peoria, IL | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Jun 1989 | Dec 2024 | Landfill Gas |
| Milam Gas Recovery | WM Illinois Renewable Energy LLC | East St. Lois, IL | Midcontinent Independent System Operator, Inc. (MISO) | 19.4 GWh | Mar 1991 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |