Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Gosselin Hydro Plant | Humboldt Bay Mun Water Dist | Ruth, CA | California Independent System Operator (CISO) | 5.9 GWh | May 1983 | Dec 2024 | Water |
| Hummel Station LLC | Hummel Station, LLC | Shamokin Dam, PA | PJM Interconnection, LLC (PJM) | 8.3 TWh | May 2018 | Mar 2026 | Natural Gas |
| Huneke I CSG | Huneke I CSG LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2018 | Dec 2024 | Solar |
| Hunlock Power Station | Hunlock Energy, LLC | Hunlock Creek, PA | PJM Interconnection, LLC (PJM) | 630.9 GWh | Aug 1959 | Dec 2024 | Natural Gas |
| Hunlock Unit 4 | Hunlock Energy, LLC | Hunlock Creek, PA | PJM Interconnection, LLC (PJM) | 26.2 GWh | Nov 2000 | Dec 2024 | Natural Gas |
| Hunter Solar LLC (UT) | Hunter Solar LLC | Clawson, UT | PacifiCorp East (PACE) | 256.2 GWh | Feb 2021 | Mar 2026 | Solar |
| Hunter Solar, LLC (CO) | Hunter Solar, LLC | Bennett, CO | Public Service Company of Colorado (PSCO) | 194.0 GWh | Nov 2023 | Mar 2026 | Solar |
| Hunterstown Power Plant | Hunterstown Generation, LLC | Gettysburg, PA | PJM Interconnection, LLC (PJM) | 6.4 TWh | Jun 2003 | Mar 2026 | Natural Gas |
| Hunterstown | Hunterstown Power, LLC | Gettysburg, PA | PJM Interconnection, LLC (PJM) | 12.4 GWh | Apr 1971 | Dec 2024 | Natural Gas : 99.6% |
| Huntington Resource Recovery Facility | Huntington Resource Recovery | East Northport, NY | New York Independent System Operator (NYIS) | 197.1 GWh | Nov 1991 | Mar 2026 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.8% |
| Hurricane City Power | Hurricane City Power | Hurricane, UT | PacifiCorp East (PACE) | 7.4 GWh | Nov 1999 | Dec 2024 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Hutchinson Plant #1 | Hutchinson Utilities Comm | Hutchinson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 35.7 GWh | Dec 1957 | Dec 2024 | Natural Gas |
| Hutchinson Plant #2 | Hutchinson Utilities Comm | Hutchinson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Oct 1994 | Dec 2024 | Natural Gas |
| Huxley Solar | Huxley Solar, LLC | Ludlow, MA | ISO New England (ISNE) | 10.2 GWh | Nov 2022 | Dec 2024 | Solar |
| Hwy 14 Holdco Solar CSG | Hwy 14 Holdco, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Jun 2017 | Dec 2024 | Solar |
| HXNAir Solar One | HXNAir Solar One LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Hydro Kennebec Project | Hydro Kennebec LLC | Winslow, ME | ISO New England (ISNE) | 27.0 GWh | Dec 1988 | Dec 2024 | Water |
| Meyers Falls | Hydro Technology Systems Inc | Kettle Falls, WA | Avista Corporation (AVA) | 9.2 GWh | May 1915 | Dec 2024 | Water |
| Flint Creek Hydroelectric LLC | Hydrodynamics Inc | Philipsburg, MT | NorthWestern Corporation (NWMT) | 11.0 GWh | Feb 2013 | Dec 2024 | Water |
| South Dry Creek Hydro | Hydrodynamics Inc | Red Lodge, MT | NorthWestern Corporation (NWMT) | 3.8 GWh | Aug 1985 | Nov 2024 | Water |
| Forks of Butte Hydro Project | Hypower Energy, LLC | Magalia, CA | California Independent System Operator (CISO) | 65.9 GWh | Feb 1992 | Dec 2024 | Water |
| Newhalen | I-N-N Electric Coop, Inc | Iliamna, AK | 3.2 GWh | Aug 1998 | Dec 2024 | Water : 99.1% Distillate Fuel Oil : 0.9% | |
| Hollins Ferry CSG | ICFTS MD Solar, LLC | Halethorpe, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Milner Hydro | Idaho Power Co | Murtaugh, ID | Idaho Power Company (IPCO) | 98.7 GWh | Aug 1992 | Dec 2024 | Water |
| Upper Salmon B | Idaho Power Co | Hagerman, ID | Idaho Power Company (IPCO) | 102.3 GWh | Aug 1947 | Dec 2024 | Water |
| Oxbow (OR) | Idaho Power Co | Oxbow, OR | Idaho Power Company (IPCO) | 965.3 GWh | Jun 1961 | Dec 2024 | Water |
| Hells Canyon | Idaho Power Co | Oxbow, OR | Idaho Power Company (IPCO) | 1.9 TWh | Sep 1967 | Dec 2024 | Water |
| Evander Andrews Power Complex | Idaho Power Co | Mountain Home, ID | Idaho Power Company (IPCO) | 1.1 TWh | Aug 2001 | Dec 2024 | Natural Gas |
| Bennett Mountain | Idaho Power Co | Mountain Home, ID | Idaho Power Company (IPCO) | 919.1 GWh | Mar 2005 | Dec 2024 | Natural Gas |
| C J Strike | Idaho Power Co | Bruneau, ID | Idaho Power Company (IPCO) | 422.3 GWh | Feb 1952 | Dec 2024 | Water |
| Upper Malad | Idaho Power Co | Hagerman, ID | Idaho Power Company (IPCO) | 58.3 GWh | May 1948 | Dec 2024 | Water |
| Upper Salmon A | Idaho Power Co | Hagerman, ID | Idaho Power Company (IPCO) | 108.0 GWh | Aug 1937 | Dec 2024 | Water |
| Twin Falls (ID) | Idaho Power Co | Kimberly, ID | Idaho Power Company (IPCO) | 101.0 GWh | Feb 1935 | Dec 2024 | Water |
| Thousand Springs | Idaho Power Co | Wendell, ID | Idaho Power Company (IPCO) | 54.8 GWh | Jul 1912 | Dec 2024 | Water |
| Swan Falls | Idaho Power Co | Kuna, ID | Idaho Power Company (IPCO) | 121.9 GWh | Feb 1994 | Dec 2024 | Water |
| Salmon Diesel | Idaho Power Co | Salmon, ID | Idaho Power Company (IPCO) | 45.0 MWh | Nov 1967 | Jan 2026 | Distillate Fuel Oil |
| Cascade Dam (ID) | Idaho Power Co | Cascade, ID | Idaho Power Company (IPCO) | 37.4 GWh | Nov 1983 | Dec 2024 | Water |
| Brownlee | Idaho Power Co | Cambridge, ID | Idaho Power Company (IPCO) | 2.2 TWh | Jul 1958 | Dec 2024 | Water |
| Bliss (ID) | Idaho Power Co | Bliss, ID | Idaho Power Company (IPCO) | 332.6 GWh | Oct 1949 | Dec 2024 | Water |
| American Falls | Idaho Power Co | American Falls, ID | Idaho Power Company (IPCO) | 242.4 GWh | Feb 1978 | Oct 2024 | Water |
| Clear Lake | Idaho Power Co | Buhl, ID | Idaho Power Company (IPCO) | 16.7 GWh | Nov 1937 | Dec 2024 | Water |
| Lower Malad | Idaho Power Co | Hagerman, ID | Idaho Power Company (IPCO) | 102.0 GWh | Sep 1948 | Dec 2024 | Water |
| Shoshone Falls | Idaho Power Co | Twin Falls, ID | Idaho Power Company (IPCO) | 71.3 GWh | Jul 1907 | Dec 2024 | Water |
| Lower Salmon | Idaho Power Co | Hagerman, ID | Idaho Power Company (IPCO) | 232.0 GWh | Jan 1949 | Dec 2024 | Water |
| Langley Gulch Power Plant | Idaho Power Co | New Plymouth, ID | Idaho Power Company (IPCO) | 1.7 TWh | May 2012 | Feb 2026 | Natural Gas |
| Yahoo Creek | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 68.4 GWh | Nov 2010 | Dec 2024 | Wind |
| Oregon Trail Wind Park | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 40.6 GWh | Dec 2010 | Dec 2024 | Wind |
| Milner Dam Wind Park LLC | Idaho Wind Partners 1 LLC | Burley, ID | Idaho Power Company (IPCO) | 56.2 GWh | Jan 2011 | Dec 2024 | Wind |
| Pilgrim Stage Wind Park | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 34.3 GWh | Dec 2010 | Dec 2024 | Wind |
| Salmon Falls Wind Park | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 64.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Camp Reed | Idaho Wind Partners 1 LLC | Glenns Ferry, ID | Idaho Power Company (IPCO) | 69.4 GWh | Nov 2010 | Dec 2024 | Wind |
| Thousand Springs Wind Park | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 34.1 GWh | Dec 2010 | Dec 2024 | Wind |
| Payne's Ferry | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 67.8 GWh | Nov 2010 | Dec 2024 | Wind |
| Burley Butte Windpark | Idaho Wind Partners 1 LLC | Burley, ID | Idaho Power Company (IPCO) | 61.1 GWh | Jan 2011 | Dec 2024 | Wind |
| Tuana Gulch Wind Park | Idaho Wind Partners 1 LLC | Hagerman, ID | Idaho Power Company (IPCO) | 29.3 GWh | Dec 2010 | Dec 2024 | Wind |
| Golden Valley Wind Park LLC | Idaho Wind Partners 1 LLC | Burley, ID | Idaho Power Company (IPCO) | 34.8 GWh | Dec 2010 | Dec 2024 | Wind |
| Sawtooth Wind Project | Idaho Winds LLC | Glenns Ferry, ID | Idaho Power Company (IPCO) | 60.3 GWh | Sep 2011 | Dec 2024 | Wind |
| SF Azalea, LLC | Idemitsu Renewables | Lost Hills, CA | California Independent System Operator (CISO) | 34.9 GWh | - | Mar 2026 | Solar |
| Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2014 | Dec 2024 | Solar |
| IGS Frankfort 2 CSG | IGS Solar LLC | Frankfort, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Jun 2021 | Dec 2024 | Solar |
| Pacific-Ultrapower Chinese Station | IHI Power Services Corp | Jamestown, CA | California Independent System Operator (CISO) | 107.6 GWh | Sep 1986 | Mar 2026 | Wood/Wood Waste Solids : 99.4% Gaseous Propane : 0.6% |
| IKEA St. Louis 410 | IKEA Property Inc | St. Louis, MO | Midcontinent Independent System Operator, Inc. (MISO) | 328.0 MWh | Aug 2015 | Apr 2025 | Solar |
| IKEA Perryville 460 | IKEA Property Inc | Perryville, MD | PJM Interconnection, LLC (PJM) | 3.2 GWh | Jan 2013 | Dec 2024 | Solar |
| IKEA Tejon 345 | IKEA Property Inc | Lebec, CA | California Independent System Operator (CISO) | 929.0 MWh | Mar 2011 | Oct 2024 | Solar |
| IKEA College Park 411 | IKEA Property Inc | College Park, MD | PJM Interconnection, LLC (PJM) | 2.3 GWh | Jan 2012 | Dec 2024 | Solar |
| IKEA Savannah 490 | IKEA Property Inc | Port Wentworth, GA | Southern Company Services, Inc. - Trans (SOCO) | 1.8 GWh | Aug 2012 | Dec 2024 | Solar |
| IKEA Miami 327 | IKEA Property Inc | Miami, FL | Florida Power & Light Co. (FPL) | 1.6 GWh | Aug 2015 | Dec 2024 | Solar |
| IKEA Oak Creek Rooftop PV System | IKEA Property Inc | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2018 | Dec 2024 | Solar |
| IKEA New Haven Rooftop PV & Fuel Cell | IKEA Property Inc | New Haven, CT | ISO New England (ISNE) | 2.8 GWh | Jun 2012 | Dec 2024 | Natural Gas : 73.1% Solar : 26.9% |
| IKEA Jacksonville Rooftop PV System | IKEA Property Inc | Jacksonville, FL | JEA (JEA) | 2.3 GWh | Oct 2017 | Dec 2024 | Solar |
| IKEA Joliet Rooftop PV System | IKEA Property Inc | Joliet, IL | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2017 | Dec 2024 | Solar |
| IKEA Las Vegas 462 | IKEA Property Inc | Las Vegas, NV | Nevada Power Company (NEVP) | 1.4 GWh | Apr 2016 | Dec 2024 | Solar |
| IKEA Memphis 508 | IKEA Property Inc | Cordova, TN | Tennessee Valley Authority (TVA) | 934.0 MWh | Nov 2016 | Dec 2024 | Solar |
| IKEA Live Oak Rooftop PV System | IKEA Property Inc | Live Oak, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.1 GWh | Mar 2019 | Dec 2024 | Solar |
| IKEA Canton Rooftop PV System | IKEA Property Inc | Canton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 238.0 MWh | Oct 2015 | Dec 2024 | Solar |
| IKEA Norfolk Rooftop PV System | IKEA Property Inc | Norfolk, VA | PJM Interconnection, LLC (PJM) | 1.4 GWh | Feb 2019 | Dec 2024 | Solar |
| IL Sidney Project1 | IL Sidney Project1, LLC | Sidney, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Mar 2021 | Dec 2024 | Solar |
| IL West Hallock Project1 | IL West Hallock Project1, LLC | Edelstein, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Jul 2021 | Dec 2024 | Solar |
| IMEA Flora | Illinois Municipal Elec Agency | Flora, IL | Midcontinent Independent System Operator, Inc. (MISO) | 48.0 MWh | Nov 2000 | Dec 2024 | Distillate Fuel Oil |
| Newton | Illinois Power Generating Co | Newton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | Oct 1977 | Feb 2026 | Subbituminous Coal : 99.9% |
| Illinois PV Fulton 1 CSG | Illinois PV Fulton 1, LLC | Farmington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | May 2020 | Dec 2024 | Solar |
| Pike County Wind Power | Illinois Rural Electric Coop | Pittsfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 355.0 MWh | Apr 2005 | Nov 2024 | Wind |
| ILR Landfill | ILR Landfill | Edison, NJ | PJM Interconnection, LLC (PJM) | 9.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Imeson Solar | Imeson Solar Farm LLC | Jscksonville, FL | JEA (JEA) | 8.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Pittsburgh Airport Gas Plant | IMG Energy Solutions | Coraopolis, PA | PJM Interconnection, LLC (PJM) | 117.5 GWh | Jun 2021 | Dec 2024 | Natural Gas |
| PG Solar 1 | IMG Energy Solutions | Findlay Township, PA | PJM Interconnection, LLC (PJM) | 4.7 GWh | Jun 2021 | Dec 2024 | Solar |
| Niland Gas Turbine Plant | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 55.7 GWh | May 2008 | Dec 2024 | Natural Gas |
| Rockwood | Imperial Irrigation District | Brawley, CA | Imperial Irrigation District (IID) | 6.8 GWh | May 1979 | Dec 2024 | Natural Gas : 92.0% Distillate Fuel Oil : 8.0% |
| Imperial Valley Solar Company 1 LLC | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 35.1 GWh | May 2012 | Dec 2024 | Solar |
| Drop 4 | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 78.2 GWh | Jan 1941 | Dec 2024 | Water |
| Drop 5 (CA) | Imperial Irrigation District | Calexico, CA | Imperial Irrigation District (IID) | 6.4 GWh | Feb 1982 | Dec 2024 | Water |
| Drop 2 (CA) | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 29.5 GWh | Nov 1953 | Dec 2024 | Water |
| Drop 3 (CA) | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 26.4 GWh | Jan 1941 | Dec 2024 | Water |
| Pilot Knob | Imperial Irrigation District | Winterhaven, CA | Imperial Irrigation District (IID) | 16.7 GWh | Dec 1956 | Dec 2024 | Water |
| El Centro Hybrid | Imperial Irrigation District | El Centro, CA | Imperial Irrigation District (IID) | 977.7 GWh | Jul 1952 | Mar 2026 | Natural Gas |
| East Highline | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 2.9 GWh | Aug 1984 | Dec 2024 | Water |
| Drop 1 | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 7.8 GWh | Sep 1984 | Dec 2024 | Water |
| Coachella | Imperial Irrigation District | Coachella, CA | Imperial Irrigation District (IID) | 172.0 MWh | May 1973 | Dec 2024 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 4.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 670.4 GWh | Oct 2018 | Mar 2026 | Solar |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |