Pratt & Whitney
400 Main, East Hartford, CT 6108Plant Summary Information
Pratt & Whitney is ranked #24 out of 168 power plants in Connecticut in terms of total annual net electricity generation.
Pratt & Whitney is comprised of 1 generator and generated 29.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Pratt & Whitney |
|---|---|
| Utility Name | United Technologies |
| Location | Capitol Planning Region, CT |
| Initial Operation Date | January 1992 |
| Last Update | May 2026 |
| Annual Generation | 75.9 GWh |
| Annual Consumption | 928.8 k MMBtu |
| Ranked #3,802 out of 13,081 Power Plants Nationwide | |
| Ranked #981 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #24 out of 168 Connecticut Power Plants | |
| Ranked #14 out of 52 Connecticut Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Pratt & Whitney
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pratt & Whitney.
Monthly Net Generation for Pratt & Whitney
Monthly Plant Fuel Consumption for Pratt & Whitney
Pratt & Whitney Details
| Summary Information | |
|---|---|
| Plant Name | Pratt & Whitney (54605) |
| Plant Address | 400 Main, East Hartford, CT 6108 |
| Utility | United Technologies (21621) |
| Latitude, Longitude | 41.74833, -72.63669 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | January 1992 |
| Annual Generation | 75.9 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 91-44-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Transportation Equipment Manufacturing (336) |
| Sector | Industrial CHP (7) |
| Water Source | Closed Loop Tower Cooling |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
| Grid Voltage | 22.30 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | Algonquin Gas Transmission Company |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator FT-8 Details Operating January 1992
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 4004 Z Connecticut |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 4004 Z Connecticut |
| Nameplate Capacity | 25.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 28 MW |
| Winter Capacity | 31 MW |
| Minimum Load | 12 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1992 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 28 MW |
| Net Winter Capacity With Natural Gas | 31 MW |
| Net Summer Capacity With Oil | 27 MW |
| Net Winter Capacity With Oil | 27 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Pratt & Whitney Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #971 | WestRock (TX) | Evadale, TX | 415.2 GWh |
| #972 | Ford Utilities Center | Albuquerque, NM | 78.4 GWh |
| #973 | Packaging Corp of America | Counce, TN | 427.9 GWh |
| #974 | Central Heating Plant | Amherst, MA | 79.6 GWh |
| #975 | Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 76.8 GWh |
| #976 | Gravel Neck | Surry, VA | 120.0 GWh |
| #977 | Baconton Power Plant | Baconton, GA | 77.6 GWh |
| #978 | Clearwater Paper IPP Lewiston | Lewiston, ID | 473.0 GWh |
| #979 | Biron Mill | Wisconsin Rapids, WI | 95.7 GWh |
| #980 | New York University Central Plant | New York, NY | 78.8 GWh |
| #982 | UMCP CHP Plant | College Park, MD | 84.4 GWh |
| #983 | Greenwood (MO) | Greenwood, MO | 86.9 GWh |
| #984 | Hargis-Hebert Electric Generating | Lafayette, LA | 75.7 GWh |
| #985 | Berry NMW Cogens | Bakersfield, CA | 75.7 GWh |
| #986 | Boise Cascade International Falls | International Falls, MN | 333.0 GWh |
| #987 | Centrahoma East | Centrahoma, OK | 74.3 GWh |
| #988 | Somerset Plant | Skowhegan, ME | 567.7 GWh |
| #989 | SJRR (LIG) | Houston, TX | 74.1 GWh |
| #990 | Archer Daniels Midland Peoria | Peoria, IL | 72.9 GWh |
| #991 | TES Filer City Station | Filer City, MI | 349.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pratt & Whitney.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ALDI DC 2 | South Windsor, CT | 1.3 GWh | 8.7 mi |
| CCSU Co-Gen-STBY Gen | New Britain, CT | 9.8 MWh | 7.9 mi |
| CCSU Fuel Cell Project | New Britain, CT | 7.0 GWh | 7.5 mi |
| Cellu Tissue | East Hartford, CT | 11.7 GWh | 2.5 mi |
| Corbin Russwin Phase 3 Berlin | Berlin, CT | 1.6 GWh | 9.1 mi |
| East Windsor | East Windsor, CT | 869.0 MWh | 8.3 mi |
| Glastonbury Solar One | Glastonbury, CT | 821.0 MWh | 4.5 mi |
| Hartford Hospital Cogeneration | Hartford, CT | 39.5 GWh | 2.1 mi |
| Hartford Landfill Solar EGF | Hartford, CT | 1.2 GWh | 3.1 mi |
| HSCo CHP | Hartford, CT | 27.7 GWh | 1.9 mi |
| Manchester Community College East | Manchester, CT | 1.5 GWh | 4.2 mi |
| Manchester Community College North | Great Path, CT | 1.5 GWh | 3.9 mi |
| Niagara Bottling - Bloomfield | Bloomfield, CT | 4.0 GWh | 8.9 mi |
| Norcap South | East Windsor, CT | 3.6 GWh | 10.4 mi |
| Pepperidge Farm Bloomfield | Bloomfield, CT | 15.5 GWh | 9.4 mi |
| South Windsor Fuel Cell | South Windsor, CT | 37.4 GWh | 4.8 mi |
| Ticket Network South Windsor | South Windsor, CT | 1.6 GWh | 8.4 mi |
| Town of Rocky Hill PV CSG | Rocky Hill, CT | 5.0 GWh | 7.3 mi |
| Trinity College Fuel Cell | Hartford, CT | 11.5 GWh | 2.7 mi |
| UDR Glastonbury Fuel Cell | Glastonbury, CT | 15.8 GWh | 5.6 mi |