University of Illinois Abbott Power Plt
1117 S Oak, Champaign, IL 61820Plant Summary Information
University of Illinois Abbott Power Plt is ranked #13 out of 64 natural gas power plants in Illinois in terms of total annual net electricity generation.
University of Illinois Abbott Power Plt is comprised of 11 generators and generated 50.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | University of Illinois Abbott Power Plt |
|---|---|
| Utility Name | University of Illinois |
| Location | Champaign County, IL |
| Initial Operation Date | November 1940 |
| Last Update | Dec 2025 |
| Annual Generation | 212.6 GWh |
| Annual Consumption | 4.1 M MMBtu |
| Ranked #2,467 out of 13,094 Power Plants Nationwide | |
| Ranked #741 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #89 out of 483 Illinois Power Plants | |
| Ranked #13 out of 64 Illinois Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 97.0% Bituminous Coal : 3.0% |
Map of University of Illinois Abbott Power Plt
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for University of Illinois Abbott Power Plt.
Monthly Net Generation for University of Illinois Abbott Power Plt
Monthly Plant Fuel Consumption for University of Illinois Abbott Power Plt
University of Illinois Abbott Power Plt Details
| Summary Information | |
|---|---|
| Plant Name | University of Illinois Abbott Power Plt (54780) |
| Plant Address | 1117 S Oak, Champaign, IL 61820 |
| Utility | University of Illinois (19528) |
| Latitude, Longitude | 40.10517, -88.24153 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | November 1940 |
| Annual Generation | 212.6 GWh |
| Fuel Types | Natural Gas : 97.0% Bituminous Coal : 3.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial CHP (5) |
| Water Source | Illinois American Water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Ameren Illinois Company (56697) IL |
| Grid Voltage | 69.00 kV |
| Energy Storage | Yes |
| Natural Gas Information | |
| Local Distribution Company (LDC) | AMEREN ILLINOIS |
| Pipeline Name | Other - Please explain in pipeline notes below. |
| Pipeline Notes | University of Illinois |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator T1 Details Operating November 1940
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1940 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 3 MW |
| Net Winter Capacity With Natural Gas | 3 MW |
| Net Summer Capacity With Oil | 3 MW |
| Net Winter Capacity With Oil | 3 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T2 Details Operating November 1940
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1940 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 3 MW |
| Net Winter Capacity With Natural Gas | 3 MW |
| Net Summer Capacity With Oil | 3 MW |
| Net Winter Capacity With Oil | 3 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T3 Details Operating November 1948
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1948 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 3 MW |
| Net Winter Capacity With Natural Gas | 3 MW |
| Net Summer Capacity With Oil | 3 MW |
| Net Winter Capacity With Oil | 3 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T4 Details Operating February 1951
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1951 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 3 MW |
| Net Winter Capacity With Natural Gas | 3 MW |
| Net Summer Capacity With Oil | 3 MW |
| Net Winter Capacity With Oil | 3 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T6 Details Operating June 1959
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 7.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 7.5 MW |
| Winter Capacity | 7.5 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1959 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO / BIT |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 7.5 MW |
| Net Winter Capacity With Natural Gas | 7.5 MW |
| Net Summer Capacity With Oil | 7.5 MW |
| Net Winter Capacity With Oil | 7.5 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T7 Details Operating August 1962
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 7.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 7.5 MW |
| Winter Capacity | 7.5 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1962 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO / BIT |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 7.5 MW |
| Net Winter Capacity With Natural Gas | 7.5 MW |
| Net Summer Capacity With Oil | 7.5 MW |
| Net Winter Capacity With Oil | 7.5 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T9 Details Operating November 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 13 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 12.5 MW |
| Winter Capacity | 15 MW |
| Minimum Load | 7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2003 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Combustion Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 11 MW |
| Net Winter Capacity With Natural Gas | 15 MW |
| Net Summer Capacity With Oil | 10 MW |
| Net Winter Capacity With Oil | 13 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T8 Details Operating September 2003
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 13 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 12.5 MW |
| Winter Capacity | 15 MW |
| Minimum Load | 7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2003 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Combustion Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 11 MW |
| Net Winter Capacity With Natural Gas | 15 MW |
| Net Summer Capacity With Oil | 10 MW |
| Net Winter Capacity With Oil | 13 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T12 Details Operating April 2004
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 7 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 7 MW |
| Winter Capacity | 7 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2004 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / NG / BIT |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 7 MW |
| Net Winter Capacity With Natural Gas | 7 MW |
| Net Summer Capacity With Oil | 7 MW |
| Net Winter Capacity With Oil | 7 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T11 Details Operating June 2004
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 12.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 12.5 MW |
| Winter Capacity | 12.5 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2004 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / NG / BIT |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 12.5 MW |
| Net Winter Capacity With Natural Gas | 12.5 MW |
| Net Summer Capacity With Oil | 12.5 MW |
| Net Winter Capacity With Oil | 12.5 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator T10 Details Operating August 2004
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 7.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 7.8 MW |
| Winter Capacity | 7.8 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2004 |
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
|---|---|
| Energy Source | Natural Gas / Bituminous Coal / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Other Combustion Technology | No |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / NG / BIT |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 7.8 MW |
| Net Winter Capacity With Natural Gas | 7.8 MW |
| Net Summer Capacity With Oil | 7.8 MW |
| Net Winter Capacity With Oil | 7.8 MW |
| Time To Switch From Gas To Oil | 24H |
| Time To Switch From Oil To Gas | 24H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
University of Illinois Abbott Power Plt Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #731 | Kern River Eastridge Cogen | Bakersfield, CA | 214.3 GWh |
| #732 | Dahlberg | Nicholson, GA | 229.4 GWh |
| #733 | Valero Wilmington Cogeneration Plant | Wilmington, CA | 211.3 GWh |
| #734 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 209.4 GWh |
| #735 | Montpelier Electric Generating Station | Poneto, IN | 211.1 GWh |
| #736 | Sundance | Casa Grande, AZ | 208.7 GWh |
| #737 | Atlantic Alumina, Gramercy Operations | Gramercy, LA | 208.1 GWh |
| #738 | Timmerman Power Plant | Maxwell, TX | 207.9 GWh |
| #739 | Indiana Harbor West | East Chicago, IN | 207.8 GWh |
| #740 | Paulsboro Refinery | Paulsboro, NJ | 351.3 GWh |
| #742 | Granite City Works | Granite City, IL | 446.0 GWh |
| #743 | Bluegrass Generating Station | LaGrange, KY | 207.3 GWh |
| #744 | Texas Petrochemicals | Houston, TX | 240.7 GWh |
| #745 | Worthington Generation LLC | Worthington, IN | 203.4 GWh |
| #746 | Red Lion Energy Center | New Castle, DE | 201.7 GWh |
| #747 | Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 201.7 GWh |
| #748 | Valero Refinery Cogeneration Unit 1 | Benicia, CA | 236.7 GWh |
| #749 | Concord | Watertown, WI | 203.4 GWh |
| #750 | Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.5 GWh |
| #751 | Georgia-Pacific Brewton Mill | Brewton, AL | 422.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding University of Illinois Abbott Power Plt.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| California Ridge Wind Energy LLC | Fithian, IL | 695.7 GWh | 20.5 mi |
| CED Champaign Solar LLC | Champaign, IL | 2.8 GWh | 3.5 mi |
| Farmer City | Farmer City, IL | 59.0 MWh | 23.1 mi |
| Harvest Ridge Wind Farm | Newman, IL | 719.5 GWh | 20.9 mi |
| IL Sidney Project1 | Sidney, IL | 4.6 GWh | 11.6 mi |
| Medanos Solar LLC | Homer, IL | 96.0 MWh | 16 mi |
| NL IL - Piatt 1 - East CSG | De Land, IL | 1.9 GWh | 22.8 mi |
| Northern Cardinal Solar SCS IL 1, LLC | Champaign, IL | 19.1 GWh | 2.4 mi |
| Phoenix Solar South Farms LLC Solar Farm | Champaign, IL | 5.2 GWh | 1.6 mi |
| Prairie Solar LLC | Sidney, IL | 134.8 GWh | 11.7 mi |
| Prosperity Wind | Deland, IL | 947.3 GWh | 19.2 mi |
| Rantoul | Rantoul, IL | 243.0 MWh | 14.9 mi |
| Rantoul Solar | Rantoul, IL | 5.0 MWh | 13.8 mi |
| Sapphire Sky Wind Energy LLC | Farmer City, IL | 962.9 GWh | 22.3 mi |
| SCS COUNTY 012631 Champaign, LLC | Champaign, IL | 3.5 GWh | 2.4 mi |
| Solar Star Urbana Landfill Central | Urbana, IL | 3.6 GWh | 3.5 mi |
| Solar Star Urbana Landfill East | Urbana, IL | 3.6 GWh | 3.6 mi |
| TAC-Distributed Energy Resource Hybrid | Champaign, IL | 294.0 MWh | 1.1 mi |
| USS Vermilion Solar 1 LLC (Vermilion 1) | Fithian, IL | 3.5 GWh | 21 mi |
| USS Vermilion Solar 1 LLC (Vermilion 2) | Fithian, IL | 4.1 GWh | 21 mi |