Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Cresta | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 121.7 GWh | Oct 1949 | Dec 2023 | Water |
Creston Ridge II, LLC | Creston Ridge II, LLC | Creston, NE | Southwest Power Pool (SWPP) | 24.6 GWh | May 2017 | Dec 2023 | Wind |
Creston Ridge Wind Farm | Creston Ridge, LLC | Creston, NE | Southwest Power Pool (SWPP) | 26.1 GWh | Nov 2015 | Dec 2023 | Wind |
Creston Solar (50 MW) | Interstate Power and Light Co | Creston, IA | Midcontinent Independent System Operator, Inc. (MISO) | 33.6 GWh | - | Mar 2025 | Solar |
Crestwood Dothan | Crestwood Corp | Dothan, AL | Southern Company Services, Inc. - Trans (SOCO) | 386.0 MWh | Dec 1994 | Dec 2022 | Distillate Fuel Oil |
Crestwood Solar Center LLC | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Mar 2016 | Dec 2023 | Solar |
Creswell Alligood Solar, LLC | Duke Energy Renewables Services | Creswell, NC | PJM Interconnection, LLC (PJM) | 23.7 GWh | Apr 2015 | Dec 2023 | Solar |
Crete | City of Crete | Crete, NE | Southwest Power Pool (SWPP) | 83.0 MWh | May 1973 | Dec 2023 | Natural Gas : 62.3% Distillate Fuel Oil : 37.7% |
Crete Energy Venture LLC | Earthrise Energy, PBC | Crete, IL | PJM Interconnection, LLC (PJM) | 54.1 GWh | Apr 2002 | Dec 2023 | Natural Gas |
Cricket Valley Energy | Cricket Valley Energy Center LLC | Dover, NY | New York Independent System Operator (NYIS) | 3.9 TWh | Mar 2020 | Mar 2025 | Natural Gas |
Crisfield | Calpine Mid-Atlantic Generation LLC | Crisfield, MD | PJM Interconnection, LLC (PJM) | 2.2 GWh | Apr 1968 | Dec 2023 | Distillate Fuel Oil |
Crisp Plant | Crisp County Power Comm | Warwick, GA | Southern Company Services, Inc. - Trans (SOCO) | 882.0 MWh | Apr 1957 | Dec 2023 | Natural Gas |
Criterion | Criterion Power Partners LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 258.5 GWh | Nov 2010 | Mar 2025 | Wind |
Crittenden Solar Facility | Duke Energy Kentucky Inc | Dry Ridge, KY | PJM Interconnection, LLC (PJM) | 4.5 GWh | Nov 2017 | Dec 2023 | Solar |
Crocker Wind Farm | Crocker Wind Farm, LLC | Conde, SD | Midcontinent Independent System Operator, Inc. (MISO) | 833.6 GWh | Oct 2019 | Mar 2025 | Wind |
Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1995 | Mar 2025 | Natural Gas |
Crockett Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2014 | Dec 2023 | Solar |
Croda Atlas Point CHP | Croda Inc. | New Castle, DE | PJM Interconnection, LLC (PJM) | 13.2 GWh | Jul 2013 | Dec 2023 | Landfill Gas |
Crofton Bluffs Wind LLC | Crofton Bluffs Wind, LLC | Bloomfield, NE | Southwest Power Pool (SWPP) | 119.0 GWh | Oct 2012 | Dec 2023 | Wind |
Cronin Road Solar 1, LLC CSG Hybrid | AES Distributed Energy | Warren, MA | ISO New England (ISNE) | 3.5 GWh | May 2020 | Dec 2023 | Solar : 99.7% |
Crooked Lake Solar, LLC | Crooked Lake Solar, LLC | Blytheville, AR | Midcontinent Independent System Operator, Inc. (MISO) | 344.5 GWh | - | Mar 2025 | Solar |
Crooked Run | Cubico USA, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 137.9 GWh | Nov 2019 | Mar 2025 | Solar |
Cross | South Carolina Public Service Authority | Cross, SC | South Carolina Public Service Authority (SC) | 9.4 TWh | Apr 1984 | Mar 2025 | Bituminous Coal : 99.7% |
Cross Winds Energy Park | Consumers Energy Co - (MI) | Unionville, MI | Midcontinent Independent System Operator, Inc. (MISO) | 669.5 GWh | Nov 2014 | Dec 2023 | Wind |
Crossett Solar | Cubico USA, LLC | Ashley County, AR | 92.6 GWh | - | Mar 2025 | Solar | |
Crossing Trails Wind Power Project LLC. | EDP Renewables North America LLC | Seibert, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 412.5 GWh | Mar 2021 | Mar 2025 | Wind |
Crossroads Energy Center | Clarksdale Public Utilities | Clarksdale, MS | Midcontinent Independent System Operator, Inc. (MISO) | 207.9 GWh | Jun 2002 | Dec 2023 | Natural Gas |
Crossroads Wind Farm | Oklahoma Gas & Electric Co | Canton, OK | Southwest Power Pool (SWPP) | 301.7 GWh | Dec 2011 | Mar 2025 | Wind |
Crosswind Energy Project | Junction Hilltop Management LLC | Ruthven, IA | Southwest Power Pool (SWPP) | 57.8 GWh | May 2007 | Dec 2023 | Wind |
Croton | Consumers Energy Co - (MI) | Newaygo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 20.4 GWh | Dec 1906 | Dec 2023 | Water |
Croton Solar | Croton Solar LLC | Cortlandt, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Nov 2021 | Dec 2023 | Solar |
Crown | Crown Solar Center, LLC | Lancaster, SC | Duke Energy Carolinas (DUK) | 6.2 GWh | Feb 2020 | Dec 2023 | Solar |
Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 537.0 MWh | Nov 2011 | Dec 2023 | Solar |
Crowned Ridge Wind Energy Center | Crowned Ridge Wind, LLC | Watertown, SD | Midcontinent Independent System Operator, Inc. (MISO) | 801.2 GWh | Nov 2019 | Mar 2025 | Wind |
Crowned Ridge Wind II Energy Center | Northern States Power Co - Minnesota | Watertown, SD | Midcontinent Independent System Operator, Inc. (MISO) | 878.8 GWh | Nov 2020 | Mar 2025 | Wind |
Croydon CT Generating Station | Constellation Power, Inc | Bristol Twp., PA | PJM Interconnection, LLC (PJM) | 15.0 GWh | May 1974 | Nov 2023 | Distillate Fuel Oil |
Cruise Solar, LLC | Cruise Solar, LLC | Jacksonville, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Aug 2021 | Dec 2023 | Solar |
Crux Community Solar | National Grid Renewables | Kasson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2018 | Dec 2023 | Solar |
Crystal | U S Bureau of Reclamation | Montrose, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 122.7 GWh | May 1978 | Dec 2023 | Water |
Crystal Falls | City of Crystal Falls | Crystal Falls, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | May 1914 | Dec 2023 | Water |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 932.0 MWh | Oct 2023 | Dec 2023 | Solar |
Crystal Hill Solar | Urban Grid Solar | Crystal Hill, VA | PJM Interconnection, LLC (PJM) | 130.6 GWh | Nov 2023 | Mar 2025 | Solar |
Crystal Lake 3 LLC | Crystal Lake 3 LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 254.3 GWh | Nov 2009 | Mar 2025 | Wind |
Crystal Mountain | Puget Sound Energy Inc | Greenwater, WA | Puget Sound Energy, Inc. (PSEI) | 270.0 MWh | Nov 1969 | Feb 2025 | Distillate Fuel Oil |
Crystal River | Duke Energy Florida, LLC | Crystal River, FL | Duke Energy Florida, Inc. (FPC) | 15.5 TWh | Sep 1966 | Mar 2025 | Natural Gas : 79.9% Bituminous Coal : 20.0% |
Crystal Springs | Crystal Springs Hydro Elec LP | Filer, ID | Idaho Power Company (IPCO) | 8.9 GWh | Dec 1987 | Dec 2023 | Water |
CS Murphy Point, LLC | Duke Energy Renewables Services | Murphy, NC | Duke Energy Carolinas (DUK) | 1.2 GWh | Jul 2011 | Dec 2023 | Solar |
CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2023 | Solar |
CSG Mt. Morris 2, LLC | CSG Mt. Morris 2, LLC | Mt. Morries, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Mar 2021 | Dec 2023 | Solar |
CSL Behring LLC | CSL Behring LLC | Bradley, IL | PJM Interconnection, LLC (PJM) | 22.9 GWh | Apr 1993 | Dec 2023 | Natural Gas |
CSL Gas Recovery | WM Renewable Energy LLC | Pompano Beach, FL | Florida Power & Light Co. (FPL) | 40.0 GWh | Feb 1989 | Dec 2023 | Landfill Gas |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2023 | Solar |
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.3 GWh | Dec 2018 | Dec 2023 | Natural Gas |
CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2007 | Dec 2023 | Solar |
CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2023 | Solar |
CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 819.0 MWh | Nov 2001 | Dec 2023 | Solar |
CSU Pueblo | Scale Sustainable I, LLC | Pueblo, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 1.1 GWh | Nov 2008 | Dec 2023 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2021 | Dec 2023 | Solar |
CSUCI Site Authority | CSUCI Site Authority | Camarillo, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 1988 | Sep 2024 | Natural Gas |
CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2023 | Solar |
CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2016 | Dec 2023 | Solar |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 34.6 GWh | Sep 2010 | Mar 2025 | Natural Gas : 82.2% Solar : 17.8% |
CSWIND America Inc. | CS Wind America, Inc. | Pueblo, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 5.9 GWh | Sep 2023 | Dec 2023 | Solar |
CU Solar Plant | CU Solar LLC | Cedarville, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2013 | Dec 2023 | Solar |
Cuba 2.5ac, LLC | Cuba 2.5ac, LLC | Cuba, NM | Public Service Company of New Mexico (PNM) | 6.0 GWh | Jan 2022 | Dec 2023 | Solar |
Cubera Solar, LLC | Cubera Solar, LLC | Dunn, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Dec 2019 | Dec 2023 | Solar |
Cumberland County PA LFG Recovery | EPP Renewable Energy | Shippensburg, PA | PJM Interconnection, LLC (PJM) | 45.8 GWh | Dec 2008 | Dec 2023 | Landfill Gas |
Cumberland County Solid Waste Complex | EPP Renewable Energy | Millville, NJ | PJM Interconnection, LLC (PJM) | 21.4 GWh | Oct 2008 | Dec 2023 | Landfill Gas |
Cumberland (NJ) | Calpine New Jersey Generation LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 65.6 GWh | Apr 1990 | Dec 2023 | Natural Gas : 99.6% |
Cumberland Rose | Cumberland Rose Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Jul 2012 | Dec 2023 | Wind |
Cumberland Solar | Butter Solar, LLC | Cumberland, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Aug 2019 | Dec 2023 | Solar |
Cumberland (TN) | Tennessee Valley Authority | Cumberland City, TN | Tennessee Valley Authority (TVA) | 9.0 TWh | Feb 1973 | Mar 2025 | Bituminous Coal : 98.7% Distillate Fuel Oil : 1.3% |
Cumberland (WI) | City of Cumberland - (WI) | Cumberland, WI | Midcontinent Independent System Operator, Inc. (MISO) | 143.0 MWh | Jul 1939 | Dec 2023 | Distillate Fuel Oil : 63.4% Natural Gas : 36.6% |
Cumblerland Land Holdings, LLC | Cumberland Land Holdings, LLC | Elkmont, AL | Tennessee Valley Authority (TVA) | 28.6 GWh | Nov 2018 | Dec 2023 | Solar |
Cuming County Renewables, LLC | Cuming County Renewables. LLC | Wisner, NE | Southwest Power Pool (SWPP) | 10.0 GWh | Nov 2019 | Dec 2023 | Wind |
Cummins, Inc | Terraform Arcadia | Lakewood, NY | New York Independent System Operator (NYIS) | 1.6 GWh | May 2015 | Dec 2023 | Solar |
Cunningham | Southwestern Public Service Co | Hobbs, NM | Southwest Power Pool (SWPP) | 1.7 TWh | Dec 1956 | Mar 2025 | Natural Gas |
Cunningham Solar LLC | Sol Systems | Palmyra, VA | PJM Interconnection, LLC (PJM) | 5.7 GWh | Apr 2023 | Dec 2023 | Solar |
Currant Creek | PacifiCorp | Mona, UT | PacifiCorp East (PACE) | 2.8 TWh | May 2005 | Mar 2025 | Natural Gas |
Currin Solar, LLC | Cypress Creek Renewables | Oxford, NC | Duke Energy Carolinas (DUK) | 8.0 GWh | Nov 2015 | Dec 2023 | Solar |
Curry Solar | Altus Power America Management, LLC | Reidsville, GA | Southern Company Services, Inc. - Trans (SOCO) | 1.9 GWh | May 2015 | Dec 2023 | Solar |
Curtis | City of Curtis - (NE) | Curtis, NE | Southwest Power Pool (SWPP) | 17.0 MWh | Dec 1954 | Dec 2023 | Natural Gas : 76.3% Distillate Fuel Oil : 23.7% |
Curtis H Stanton Energy Center | Stanton Clean Energy LLC | Orlando, FL | Duke Energy Florida, Inc. (FPC) | 3.8 TWh | Sep 2003 | Mar 2025 | Natural Gas |
Curtis Hill Solar CSG | CCC Solar Holdings LLC | Charlton, MA | ISO New England (ISNE) | 3.2 GWh | Sep 2016 | Dec 2023 | Solar |
Curtis Palmer Hydroelectric | Palmer Hydroelectric | Corinth, NY | New York Independent System Operator (NYIS) | 393.2 GWh | Sep 1985 | Dec 2023 | Water |
Cushaw | Cushaw Hydro LLC | Warm Springs, VA | PJM Interconnection, LLC (PJM) | 12.0 GWh | Dec 1929 | Dec 2022 | Water |
Cushing | City of Cushing - (OK) | Cushing, OK | Southwest Power Pool (SWPP) | 575.0 MWh | May 1936 | Dec 2023 | Natural Gas : 92.9% Distillate Fuel Oil : 7.1% |
Cushman 1 | City of Tacoma - (WA) | Shelton, WA | City of Tacoma, Department of Public Utilities, Light Division (TPWR) | 115.5 GWh | May 1926 | Dec 2023 | Water |
Cushman 2 | City of Tacoma - (WA) | Shelton, WA | City of Tacoma, Department of Public Utilities, Light Division (TPWR) | 168.5 GWh | Nov 1930 | Dec 2023 | Water |
Custer Energy Center | Manitowoc Public Utilities | Manitowoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | May 1999 | Dec 2023 | Natural Gas |
Cutlass Solar 1 LLC | Cutlass Solar 1, LLC | Richmond, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 200.9 GWh | Nov 2022 | Mar 2025 | Solar |
Cutler Hydro | PacifiCorp | Collinston, UT | PacifiCorp East (PACE) | 96.2 GWh | Jun 1927 | Dec 2023 | Water |
Cutrale Citrus Juices USA I | Cutrale Citrus Juices USA Inc | Leesburg, FL | Duke Energy Florida, Inc. (FPC) | 24.5 GWh | Nov 2010 | Dec 2023 | Natural Gas |
Cutrale Citrus Juices USA II | Cutrale Citrus Juices USA Inc | Auburndale, FL | Tampa Electric Company (TEC) | 33.4 GWh | Nov 2010 | Dec 2023 | Natural Gas |
Cutten | Power Depot Group A, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 769.0 MWh | Aug 2013 | Dec 2023 | Distillate Fuel Oil |
Cuyahoga County Landfill | IOS II LLC | Brooklyn, OH | PJM Interconnection, LLC (PJM) | 4.3 GWh | Aug 2018 | Nov 2023 | Solar |
Cuyahoga Falls 1 | City of Cuyahoga Falls - (OH) | Cuyahoga Falls, OH | PJM Interconnection, LLC (PJM) | 707.0 MWh | Jun 2018 | Dec 2023 | Distillate Fuel Oil |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 61.0 GWh | Oct 2017 | Mar 2025 | Solar |
Cuyamaca Peak Energy Plant | San Diego Gas & Electric Co | El Cajon, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2002 | Dec 2023 | Natural Gas |
Summary of Power Plants By State
Figures are based on March 2025 generation numbers.State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,399.45 GWh |
Alaska | # 48 | 137 | 460.30 GWh |
Arizona | # 16 | 167 | 7,756.35 GWh |
Arkansas | # 29 | 81 | 4,503.48 GWh |
California | # 5 | 1,596 | 15,306.94 GWh |
Colorado | # 30 | 265 | 4,337.74 GWh |
Connecticut | # 31 | 152 | 3,831.37 GWh |
Delaware | # 50 | 31 | 183.34 GWh |
District of Columbia | # 51 | 12 | 15.27 GWh |
Florida | # 3 | 304 | 18,686.61 GWh |
Georgia | # 9 | 241 | 9,979.52 GWh |
Hawaii | # 46 | 67 | 749.10 GWh |
Idaho | # 43 | 146 | 1,488.21 GWh |
Illinois | # 4 | 338 | 15,592.21 GWh |
Indiana | # 12 | 203 | 8,849.97 GWh |
Iowa | # 20 | 281 | 6,323.45 GWh |
Kansas | # 25 | 157 | 5,176.23 GWh |
Kentucky | # 24 | 57 | 5,180.56 GWh |
Louisiana | # 18 | 81 | 6,708.43 GWh |
Maine | # 45 | 159 | 1,313.29 GWh |
Maryland | # 39 | 181 | 2,427.73 GWh |
Massachusetts | # 42 | 599 | 1,608.56 GWh |
Michigan | # 10 | 268 | 9,898.87 GWh |
Minnesota | # 26 | 740 | 5,082.27 GWh |
Mississippi | # 19 | 55 | 6,374.07 GWh |
Missouri | # 21 | 118 | 5,776.95 GWh |
State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Montana | # 40 | 69 | 2,309.70 GWh |
Nebraska | # 37 | 119 | 3,008.88 GWh |
Nevada | # 34 | 109 | 3,381.98 GWh |
New Hampshire | # 44 | 56 | 1,374.49 GWh |
New Jersey | # 28 | 375 | 4,514.07 GWh |
New Mexico | # 35 | 140 | 3,378.20 GWh |
New York | # 8 | 830 | 10,278.94 GWh |
North Carolina | # 11 | 880 | 9,080.20 GWh |
North Dakota | # 33 | 57 | 3,690.67 GWh |
Ohio | # 6 | 191 | 11,252.37 GWh |
Oklahoma | # 17 | 131 | 6,972.70 GWh |
Oregon | # 22 | 260 | 5,543.74 GWh |
Pennsylvania | # 2 | 240 | 19,658.43 GWh |
Rhode Island | # 47 | 95 | 622.24 GWh |
South Carolina | # 14 | 198 | 8,606.12 GWh |
South Dakota | # 41 | 52 | 1,945.10 GWh |
Tennessee | # 23 | 84 | 5,241.09 GWh |
Texas | # 1 | 821 | 43,194.33 GWh |
Utah | # 36 | 119 | 3,056.84 GWh |
Vermont | # 49 | 112 | 230.44 GWh |
Virginia | # 15 | 215 | 8,465.83 GWh |
Washington | # 13 | 137 | 8,662.62 GWh |
West Virginia | # 38 | 36 | 2,977.95 GWh |
Wisconsin | # 27 | 222 | 4,571.79 GWh |
Wyoming | # 32 | 73 | 3,817.24 GWh |